ByTenantsByTenants home

21-38 31 Street, Astoria, NY 11105

Built 1929 · 6-story elevator building · 116 apartments

55 immediately hazardous violations open. 186 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
18655 · 98 · 33
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
2022521
2023455
202413640
2025343
2026 so far132

Plus 156 violations from 1988 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 110
  • Lead paint 65
  • Walls and ceilings 50
Open per apartment
1.6 (186 open across 116 apartments)
Inspector last found a problem
29 Oct 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 23 days, and inspectors issued 6 violations.

WinterDaysComplaintsViolations
2025–2623456
2026–27 (so far)442

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous55 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at north

    Issued 29 Oct 2026Violation open 29 Oct 2026Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door locked at boiler room

    Issued 29 Oct 2026Violation open 29 Oct 2026Heat and hot water§ 27-2033

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 9 Jun 2025Notice sent out 29 Jul 2025Lead paint§ 27-2056.4 +1

  • Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Issued 9 Jun 2025Notice sent out 29 Jul 2025Lead paint§ 27-2056.4

  • Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof at public hall, 6th story, section ''d''

    Issued 29 Dec 2024Notice sent out 29 Dec 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 6th story at east, section ''b''

    Issued 24 Dec 2024Not complied with 23 Jan 2025Fire and safety equipment§ 27-2005 +3

  • Abate the nuisance consisting of key operated lock installed at door to fire escape window in the 1st room from north, 3rd story at north, section ''a'', at northeast

    Issued 27 Nov 2024Notice sent out 28 Nov 2024Fire and safety equipment§ 27-2005 +1

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Notice of issuance sent to tenant 5 Nov 2024Pests§ 27-2017.4

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Notice sent out 5 Nov 2024Fire and safety equipment§ 27-2043.1

  • Replace or repair the self-closing doors that is missing or defective hopper door latch,section b at public hall, 6th story

    Issued 17 Apr 2024Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

Show all 55
  • Provide hot water at all hot water fixtures in the entire apartment, 6th story at west, section ''b'', at northeast

    Issued 4 Apr 2024Notice certified late 8 May 2024Heat and hot water§ 27-2031

  • ×2Provide an adequate supply of heat for the apartment in the entire apartment, 6th story at west, section ''b'', at northeast

    2 issued 4 Apr 2024Notice certified lateHeat and hot water§ 27-2029

  • Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 6th story

    Issued 4 Apr 2024Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Provide hot water at all hot water fixtures in the entire apartment, 5th story at west, section ''b''

    Issued 1 Apr 2024Notice certified late 22 Apr 2024Heat and hot water§ 27-2031

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 2nd closet from south at west wall door frame, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from north, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from south at west wall door, north wall, south wall, east wall, west wall in the 1st room from north, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the bathroom, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from east at south wall in the foyer, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall, 1st window frame from north at east wall in the kitchen, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the kitchen, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st radiator from north at east wall, north wall, east wall, west wall in the 2nd room from north, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024First no access to re- inspect violation 28 May 2024Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2043.1

  • Trace and repair the source and abate the visible mold condition... at ceiling in the 2nd room from north, 5th story at north, section ''a'', 2nd from north at east

    Issued 29 Mar 2024Certification postponment denied 28 Apr 2024Mold and damp§ 27-2017.3

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd room from east, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 6 Jun 2024Lead paint§ 27-2056.7 +2

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the private hallway, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the private hallway, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, 1st window frame from west at north wall in the 1st room from east at north, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 6th story at east, section ''west''

    Issued 26 Mar 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2005 +3

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east, 6th story at east, section ''west''

    Issued 26 Mar 2024First no access to re- inspect violation 16 May 2024Lead paint§ 27-2056.6

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 6th story at west, section ''c'', at south

    Issued 25 Feb 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 6th story, section ''d''

    Issued 2 Jan 2024Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective bulkhead door hinges, 6th story, section ''d''

    Issued 2 Jan 2024Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 4th story, section ''d''

    Issued 2 Jan 2024Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof at public hall, 6th story, section ''d'', at southwest

    Issued 27 Dec 2023Not complied with 20 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at hopper door at east wall at public hall, 6th story, section ''d'', at southwest

    Issued 27 Dec 2023Notice certified late 2 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Provide hot water at all hot water fixtures in the entire apartment, 5th story at north, section ''b-section''

    Issued 17 Nov 2023Notice certified late 3 Dec 2023Heat and hot water§ 27-2031

  • Abate the infestation consisting of roaches in the entire apartment, 6th story at east, section ''21-38d'', 1st from east at south

    Issued 6 May 2023Notice of issuance sent to tenant 7 May 2023Pests§ 27-2017.4

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 24 Mar 2022Notice sent out 22 May 2022Lead paint§ 27-2056.7

  • Abate the infestation consisting of mice in the entire apartment, 1st story at west, section ''a''

    Issued 28 Jan 2022Invalid certification 24 Feb 2022Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 6th story at east

    Issued 10 Sept 2021Notice of issuance sent to tenant 12 Sept 2021Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at west, section ''a''

    Issued 15 Mar 2021Notice of issuance sent to tenant 16 Mar 2021Pests§ 27-2017.4

  • Arrange and make self-closing the doors at entrance, 6th story, section ''section d''

    Issued 1 Nov 2019Notice sent out 5 Nov 2019Fire and safety equipment§ 27-2005 +1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 2; no stops, no one way screws, 3rd story at north

    Issued 27 Jul 2015Notice sent out 2 Aug 2015Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the bathroom, 4th story at north, section at southwest

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall in the kitchen, 4th story at north, section at southwest

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st radiator from east at south wall in the kitchen, 4th story at north, section at southwest

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Lead paint§ 27-2056.6

Hazardous98 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 1st story at north, section ''c''

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north, 1st story at north, section ''c''

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Walls and ceilings§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at east

    Issued 11 Sept 2025Lead docs submitted, not acceptable 30 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at west, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at west, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025First no access to re- inspect violation 28 Mar 2026Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at south, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at east, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at south, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

Show all 98
  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north, section ''21-38'', 1st from south at west

    Issued 30 Jul 2025Lead docs submitted, not acceptable 4 Nov 2025Lead paint§ 27-2056.7 +2

  • Properly secure the loose marble saddle in the entrance in the bathroom, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Notice sent out 5 Nov 2024§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the 1st room from east at north, 6th story at east, section ''west''

    Issued 26 Mar 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east, 6th story at east, section ''west''

    Issued 26 Mar 2024Notice certified late 19 May 2024Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the 2nd room from east, 6th story at east, section ''west''

    Issued 26 Mar 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective hinges in the entrance, 6th story at west, section ''c'', at south

    Issued 25 Feb 2024Notice certified late 19 May 2024§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 6th story at west, section ''c'', at south

    Issued 25 Feb 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 6th story at west, section ''c'', at south

    Issued 25 Feb 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 6th story at west, section ''b'', at east

    Issued 23 Feb 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 6th story at west, section ''b'', at east

    Issued 23 Feb 2024Notice certified late 19 May 2024Fire and safety equipment§ 27-2046.1

  • Properly repair the source and abate the evidence of a water leak at south wall in the 2nd room from east, 6th story at west, section ''b''

    Issued 14 Feb 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east, 6th story at west, section ''b''

    Issued 14 Feb 2024Notice certified late 19 May 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east, 6th story at west, section ''b''

    Issued 14 Feb 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective latch at hopper door at east wall at public hall, 3rd story, section ''d'', at southwest

    Issued 16 Jan 2024Notice certified late 2 Jun 2024Doors and windows§ 27-2005

  • Fire egress defective. remove the obstruction in fireproof passageway accumulation of garbage at east and west at fire passage way

    Issued 27 Dec 2023Invalid certification 29 Jan 2024Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 5th story at north, section ''b-section''

    Issued 17 Nov 2023Notice sent out 19 Nov 2023Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling, north and west wall at 1st public hall bulkhead from north, 6th story

    Issued 23 Oct 2023Invalid certification 12 Dec 2023Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... consisting of approximately 20 square feet at ceiling in the 1st room from north, 1st story at east, section ''d''

    Issued 6 Oct 2023Defect letter issued 28 Dec 2023Mold and damp§ 27-2017.3

  • Properly repair the broken or defective lighting fixtures for light bulb at ceiling in the foyer, 3rd story at west, section ''a'', at north

    Issued 26 Aug 2022Notice sent out 28 Aug 2022Electrical§ 27-2005

  • Properly repair the broken or defective mortise lock to apartment door in the entrance, 3rd story at west, section ''a'', at north

    Issued 26 Aug 2022Notice sent out 29 Aug 2022Doors and windows§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at west, section ''a'', at north

    Issued 26 Aug 2022Notice sent out 28 Aug 2022Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 3rd story at west, section ''a'', at north

    Issued 26 Aug 2022Notice sent out 28 Aug 2022Fire and safety equipment§ 27-2045

  • Properly repair the broken or defective light bulb and lighting fixtures at ceiling in the bathroom, 3rd story at west, section ''a'', at north

    Issued 26 Aug 2022Notice sent out 28 Aug 2022Electrical§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at south

    Issued 24 Jun 2022Notice sent out 28 Jun 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at west

    Issued 24 Jun 2022Notice sent out 28 Jun 2022Lead paint§ 27-2056.7 +2

  • ×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at east

    2 issued 24 Jun 2022Certification postponment grantedLead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at north

    Issued 24 Jun 2022Notice sent out 28 Jun 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at north

    Issued 24 Jun 2022Certification postponment granted 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at west

    Issued 24 Jun 2022Certification postponment granted 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at south

    Issued 24 Jun 2022Certification postponment granted 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at north

    Issued 24 Jun 2022Certification postponment granted 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at south

    Issued 24 Jun 2022Certification postponment granted 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at west

    Issued 24 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at south

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • ×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at north

    2 issued 16 Jun 2022Notice sent outLead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at east

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at west

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at west

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • ×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north

    2 issued 16 Jun 2022Notice sent outLead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at east

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at west

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at south

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at west

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at south

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at east

    Issued 16 Jun 2022Certification postponment denied 26 Jul 2022Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 6th story at south

    Issued 16 Jun 2022Notice sent out 20 Jun 2022Lead paint§ 27-2056.7 +1

  • Replace with new the missing closet door saddle at south wall in the 4th room from east, 3rd story at west, section ''a''

    Issued 15 Mar 2021Notice certified late 28 Jul 2021Doors and windows§ 27-2005

  • Properly repair the broken or defective door frame in the 4th room from east, 3rd story at west, section ''a''

    Issued 15 Mar 2021Notice certified late 28 Jul 2021Doors and windows§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s)., missing in the entire apartment, 6th story at west, section ''b''

    Issued 16 Dec 2020Notice certified late 7 Mar 2021Fire and safety equipment§ 27-2046.1

  • Replace with new the broken or defective cracked wire glass at lower and upper sashes at 1st story public hall stairs

    Issued 15 Sept 2020Notice sent out 16 Sept 2020Floors and stairs§ 27-2005

  • Provide an adequate supply of gas to the fixtures gas range in the kitchen, 6th story at south, section at southeast

    Issued 11 Oct 2018Notice sent out 14 Oct 2018Appliances§ 27-2070

  • Arrange and make self-closing the doors hopper door at public hall, 3rd story

    Issued 5 Aug 2017Notice sent out 13 Aug 2017Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling and walls at public hall, 4th story, section ''d''

    Issued 5 Aug 2017Invalid certification 24 Sept 2017Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling and walls at public hall, 5th story

    Issued 5 Aug 2017Invalid certification 24 Sept 2017Walls and ceilings§ 27-2005

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar, section ''c''

    Issued 5 Aug 2017Notice certified late 2 Oct 2017Garbage and cleanliness§ 27-2010

  • Abate the nuisance consisting of bedbugs, 4th story at north

    Issued 22 Mar 2014Invalid certification 7 May 2014Pests§ 27-2018

  • Abate the nuisance consisting of roaches, 4th story at north

    Issued 22 Mar 2014Invalid certification 7 May 2014Pests§ 27-2018

  • Properly repair the source and abate the evidence of a water leak concealed water leak at ceiling in the 1st room from east at south, 1st story

    Issued 27 Feb 2014Invalid certification 14 Apr 2014Leaks and plumbing§ 27-2026

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 1st story

    Issued 27 Feb 2014Invalid certification 14 Apr 2014Fire and safety equipment§ 27-2046.1

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the 1st room from east at south, 1st story

    Issued 27 Feb 2014Invalid certification 14 Apr 2014Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 1st story

    Issued 27 Feb 2014Invalid certification 14 Apr 2014Fire and safety equipment§ 27-2045

  • Properly repair the broken or defective lower sash counter balance window in the 1st room from east at south, 1st story

    Issued 27 Feb 2014Invalid certification 14 Apr 2014Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, east wall in the kitchen, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of bedbugs, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Pests§ 27-2018

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, south wall, ceiling in the bathroom, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling, west wall, 1st closet from west at north wall wall in the foyer, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of bedbugs in the entire apartment, 4th story at north, section at southwest

    Issued 19 Oct 2013Invalid certification 8 Dec 2013Pests§ 27-2018

  • Properly repair with similar material the broken or defective ceramic floor tile (section ''c'') in the bathroom, 4th story at north

    Issued 19 Oct 2013Invalid certification 8 Dec 2013Floors and stairs§ 27-2005

  • Abate the nuisance consisting of roaches in the entire apartment, 4th story at north, section at southwest

    Issued 19 Oct 2013Invalid certification 8 Dec 2013Pests§ 27-2018

  • Repair the leaky and/or defective faucets at sink in the kitchen, 1st story at west

    Issued 2 Dec 2012First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 1st story at west

    Issued 2 Dec 2012First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2026

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the private hallway, 1st story at west

    Issued 2 Dec 2012First no access to re- inspect violation 19 Mar 2013Electrical§ 27-2005

  • Properly repair the broken or defective lower sash counter balance at window in the 1st room from north, 4th story at north

    Issued 18 Sept 2012First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005

  • Arrange and make self-closing the doors front entrance door, 5th story

    Issued 19 Oct 2011First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2005 +1

  • Repair or replace the smoke detector defective in the entire apartment, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2045

  • Trace and repair the source and abate the nuisance consisting of mold... ceiling in the kitchen, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Mold and damp§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective faucets at sink in the kitchen, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2026

  • Abate the nuisance consisting of concealed water leak at ceiling in the bathroom, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the entire apartment, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Walls and ceilings§ 27-2005

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2046.1

  • Remove the illegal fastening double cylinder key operated lock at door in the entrance, 1st story

    Issued 24 Aug 2010First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005 +1

Non-hazardous33 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway, 1st story at north, section ''c''

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling and east wall in the 2nd room from north, 6th story at north

    Issued 10 Aug 2026Notice sent out 10 Aug 2026Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from north, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Invalid certification 17 Feb 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective porcelain enamel glaze bathtub in the bathroom, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Invalid certification 17 Feb 2025Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tile in the kitchen, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Notice sent out 5 Nov 2024Floors and stairs§ 27-2005

  • Properly repair the source and abate the evidence of a water leak south wall in the 4th room from east, 6th story at west

    Issued 7 Jan 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department south wall in the 4th room from east, 6th story at west

    Issued 7 Jan 2024Notice certified late 19 May 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department south wall in the 3rd room from east, 6th story at west

    Issued 7 Jan 2024Notice certified late 19 May 2024Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak south wall in the 3rd room from east, 6th story at west

    Issued 7 Jan 2024Notice certified late 19 May 2024Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department at north wall at public hall, 5th story, section ''a''

    Issued 5 Jan 2024Notice certified late 2 Jun 2024Walls and ceilings§ 27-2013

Show all 33
  • Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 5th story, section ''a''

    Issued 5 Jan 2024Notice certified late 2 Jun 2024Walls and ceilings§ 27-2005

  • Replace with new the missing lock from mail box for an apartment at public hall, 1st story, section ''a''

    Issued 15 Mar 2021Notice certified late 28 Jul 2021§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all walls & ceilings in the entire apartment, 3rd story at west, section ''a''

    Issued 15 Mar 2021Notice certified late 28 Jul 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling, east, west and south walls at bulkhead, 6th story, section ''b''

    Issued 2 Mar 2020Notice sent out 3 Mar 2020Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling, east, west and south walls at bulkhead, 6th story, section ''b''

    Issued 2 Mar 2020Notice sent out 3 Mar 2020Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at west wall at public hall stairs, 2nd story, section ''section b''

    Issued 7 Jan 2019Invalid certification 24 Apr 2019Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at west wall at public hall stairs, 2nd story, section ''section b''

    Issued 7 Jan 2019Invalid certification 24 Apr 2019Floors and stairs§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at west wall at public hall, 3rd story, section ''section b''

    Issued 7 Jan 2019Invalid certification 27 Apr 2019Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant plaster at west wall at public hall, 3rd story, section ''section b''

    Issued 7 Jan 2019Invalid certification 27 Apr 2019Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and walls at public hall, 5th story

    Issued 5 Aug 2017Invalid certification 24 Sept 2017Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department ceiling and walls at public hall, 4th story, section ''d''

    Issued 5 Aug 2017Invalid certification 24 Sept 2017Walls and ceilings§ 27-2013

  • Refit apartment entrance door in the foyer, 4th story at north

    Issued 22 Mar 2014Invalid certification 9 Jun 2014Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, the 3rd room from east at north, the 1st room from east, 4th story at north, section at southwest

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the kitchen, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, 1st door frame from west at north wall, 1st door from west at north wall in the bathroom, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom, 4th story at north

    Issued 25 Oct 2013Notice sent out 27 Oct 2013Walls and ceilings§ 27-2005

  • Refit front entrance door, 5th story

    Issued 19 Oct 2011First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and walls southwest bulkhead to roof.

    Issued 15 Sept 1999Not complied with 11 Mar 2013Roof and outside the building§ 27-2013

  • Refit door motor room elevator north roof.

    Issued 10 Sept 1999First no access to re- inspect violation 19 Mar 2013Elevator§ 27-2005

  • Paint with light colored paint to the satisfaction of this department walls pub hall bulkhead southeast section.

    Issued 20 Oct 1988Not complied with 11 Mar 2013Walls and ceilings§ 27-2013

  • Refit door pub hall bulkhead northwest section.

    Issued 20 Oct 1988First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department walls pub hall bulkhead southwest section.

    Issued 20 Oct 1988Not complied with 11 Mar 2013Walls and ceilings§ 27-2013

Paperwork and notices6 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Issued 5 Aug 2017Invalid certification 3 Oct 2017Paperwork and notices§ 27-2104

  • Dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor.. at public hall, 1st story

    Issued 5 Aug 2017Invalid certification 24 Sept 2017Paperwork and notices§ 329

  • ×2Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    2 issued 5 Aug 2017Invalid certificationPaperwork and notices§ 26-1103

  • ×2Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    2 issued 5 Aug 2017Invalid certificationPaperwork and notices§ 27-2005

301 closed violations, plus 1 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at balcony at 2nd from south at east building front at fire escape, 4th story

    Issued 8 Jun 2026Violation closed 16 Jul 2026Fire and safety equipment§ 27-2005 +1

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story, section ''b''

    Issued 6 Mar 2026Violation dismissed 19 May 2026Heat and hot water§ 27-2031

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 2nd story at north, section ''b'', at northwest

    Issued 28 Jan 2026Violation dismissed 19 May 2026Fire and safety equipment§ 27-2045 +2

  • Repair the leaky and/or defective faucets at sink in the kitchen, 2nd story at north, section ''b'', at northwest

    Issued 28 Jan 2026Violation dismissed 19 May 2026Leaks and plumbing§ 27-2026

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 2nd story at north, section ''b'', at northwest

    Issued 28 Jan 2026Violation dismissed 19 May 2026Fire and safety equipment§ 27-2045 +3

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment, 2nd story at west, section ''b'', 1st from west at north

    Issued 14 Dec 2025Violation dismissed 26 Apr 2026Fire and safety equipment§ 27-2043.1

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system. incorrect information on notice at wall at public hall, 1st story, section ''b'', at northwest

    Issued 28 Jan 2026Violation dismissed 22 Apr 2026Heat and hot water§ 27-2033

  • Provide ready access to buildings heating system. door locked in cellar at boiler room

    Issued 28 Jan 2026Violation dismissed 22 Apr 2026Heat and hot water§ 27-2033

  • Trace and repair the source and abate the visible mold condition... less than 10 square feet mildew and moisture at north wall in the bathroom, 5th story at south

    Issued 19 Dec 2025Violation dismissed 15 Apr 2026Mold and damp§ 27-2017.3

  • Replace or repair the self-closing doors that is missing or defective door frame at building entrance door building #d at public hall, 1st story

    Issued 3 Feb 2026Violation closed 5 Apr 2026Fire and safety equipment§ 27-2005 +3

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at west, section ''b'', 1st from west at north

    Issued 14 Dec 2025Violation dismissed 25 Mar 2026Pests§ 27-2017.4

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 5th story at south

    Issued 19 Dec 2025Violation dismissed 17 Mar 2026Fire and safety equipment§ 27-2045 +3

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 5th story at south

    Issued 19 Dec 2025Violation dismissed 17 Mar 2026Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom, 5th story at south

    Issued 19 Dec 2025Violation dismissed 17 Mar 2026Walls and ceilings§ 27-2005

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 5th story at south

    Issued 19 Dec 2025Violation dismissed 17 Mar 2026Fire and safety equipment§ 27-2045 +2

  • Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance, 5th story at south

    Issued 19 Dec 2025Violation dismissed 17 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at north, section ''b'', at northwest

    Issued 28 Jan 2026Violation closed 6 Mar 2026Heat and hot water§ 27-2029

  • Provide an adequate supply of gas to the fixtures at gas range in the kitchen, 2nd story at west, section ''b'', 1st from west at north

    Issued 14 Dec 2025Violation dismissed 3 Mar 2026Appliances§ 27-2070

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 2nd story at west, section ''b'', 1st from west at north

    Issued 14 Dec 2025Violation dismissed 3 Mar 2026Fire and safety equipment§ 27-2045 +2

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 2nd story at west, section ''b'', 1st from west at north

    Issued 14 Dec 2025Violation dismissed 3 Mar 2026Fire and safety equipment§ 27-2045 +3

  • Properly repair or replace the broken or defective hopper door latch to east wall at public hall, 6th story

    Issued 17 Nov 2025Violation dismissed 18 Feb 2026Doors and windows§ 27-2005

  • Provide ready access to buildings heating system door locked at basement at boiler room

    Issued 17 Nov 2025Violation dismissed 4 Feb 2026Heat and hot water§ 27-2033

  • Properly repair or replace the broken or defective latch at hopper door at public hall, 4th story, section ''d''

    Issued 16 Oct 2025Violation dismissed 14 Jan 2026Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective latch at hopper door at public hall, 4th story, section ''d''

    Issued 16 Oct 2025Violation dismissed 14 Jan 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door latch at east wall at public hall, 6th story

    Issued 17 Nov 2025Violation closed 17 Dec 2025Fire and safety equipment§ 27-2005 +3

  • Provide hot water at all hot water fixtures in the entire apartment, 6th story at west, section ''b''

    Issued 17 Nov 2025Violation closed 10 Dec 2025Heat and hot water§ 27-2031

  • Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance, 1st story at west, section ''c''

    Issued 2 Nov 2025Violation closed 14 Nov 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at west, section ''c''

    Issued 28 Oct 2025Violation closed 14 Nov 2025Fire and safety equipment§ 27-2005 +3

  • Remove all encumbrances consisting of household items consisting of bicycles, metal shelf, and scooter at public hall, 1st story

    Issued 30 Jul 2025Violation closed 13 Oct 2025Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall stairs, 5th story

    Issued 30 Jul 2025Violation closed 13 Oct 2025Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 5th story

    Issued 30 Jul 2025Violation closed 13 Oct 2025Floors and stairs§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant materials at east and south walls at bulkhead

    Issued 30 Jul 2025Violation closed 13 Oct 2025Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at east and south walls at bulkhead.

    Issued 30 Jul 2025Violation closed 13 Oct 2025Walls and ceilings§ 27-2013

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 6th story at west, section ''b'', at northwest

    Issued 22 Jan 2025Violation dismissed 24 Apr 2025Fire and safety equipment§ 27-2046.1

  • Remove all encumbrances consisting of air condition units at public hall, 4th story, section ''b'', at northeast

    Issued 22 Jan 2025Violation dismissed 24 Apr 2025Fire and safety equipment§ 27-2005 +1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment, 6th story at east, section ''b''

    Issued 24 Dec 2024Violation dismissed 2 Apr 2025Fire and safety equipment§ 27-2043.1

  • Repair or replace the smoke detector missing in the entire apartment, 6th story at east, section ''b''

    Issued 24 Dec 2024Violation dismissed 25 Mar 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 6th story at east, section ''b''

    Issued 24 Dec 2024Violation dismissed 25 Mar 2025Fire and safety equipment§ 27-2046.1

  • Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story

    Issued 24 Dec 2024Violation dismissed 9 Mar 2025Heat and hot water§ 27-2033

  • Provide an adequate supply of heat for the apartment in the entire apartment, 6th story at east, section ''b''

    Issued 24 Dec 2024Violation dismissed 9 Mar 2025Heat and hot water§ 27-2029

  • Provide ready access to buildings heating system boiler room door at cellar at boiler room

    Issued 21 Nov 2024Violation dismissed 11 Feb 2025Heat and hot water§ 27-2033

  • Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at north

    Issued 21 Nov 2024Violation dismissed 11 Feb 2025Heat and hot water§ 27-2029

  • Replace or repair the self-closing doors that is missing or defective hinge at hopper door north wall at public hall, 4th story

    Issued 17 Dec 2024Violation closed 23 Jan 2025Fire and safety equipment§ 27-2005 +3

  • Remove all obstructions and repair all defects in wash basin drain pipe in the bathroom, 3rd story at north, section ''a'', at east

    Issued 4 Nov 2024Violation dismissed 20 Jan 2025Leaks and plumbing§ 27-2026

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the inner northeast court

    Issued 3 Nov 2024Violation dismissed 20 Jan 2025Garbage and cleanliness§ 27-2010

  • Replace or repair the self-closing doors that is missing or defective hinge at vestibule door at public hall, 1st story

    Issued 30 Oct 2024Violation dismissed 20 Jan 2025Fire and safety equipment§ 27-2005 +3

  • Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 6th story, section ''a''

    Issued 11 Oct 2024Violation dismissed 20 Jan 2025Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 6th story, section ''a''

    Issued 11 Oct 2024Violation dismissed 20 Jan 2025Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 5th story, section ''a''

    Issued 11 Oct 2024Violation dismissed 20 Jan 2025Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at north wall and ceiling at public hall, 5th story, section ''a''

    Issued 11 Oct 2024Violation dismissed 20 Jan 2025Walls and ceilings§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at east, section ''c'', 2nd from south at west

    Issued 7 Oct 2024Violation dismissed 8 Jan 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at east, section ''c'', 2nd from south at west

    Issued 7 Oct 2024Violation dismissed 8 Jan 2025Fire and safety equipment§ 27-2045

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 2nd story at east, section ''c'', 2nd from south at west

    Issued 7 Oct 2024Violation dismissed 8 Jan 2025Leaks and plumbing§ 27-2026

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots 4th story balcony 2nd stack from west building front at fire escape, section ''west''

    Issued 23 Sept 2024Violation dismissed 22 Dec 2024Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots 4th story balcony 1st stack from west building front at fire escape, section ''west''

    Issued 23 Sept 2024Violation dismissed 22 Dec 2024Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items 2nd story balcony 3rd stack from west building front at fire escape, section ''east''

    Issued 23 Sept 2024Violation dismissed 22 Dec 2024Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots 6th story balcony 2nd stack from west building front at fire escape, section ''west''

    Issued 23 Sept 2024Violation dismissed 22 Dec 2024Fire and safety equipment§ 27-2005 +1

  • Repair the roof so that it will not leak east wall and ceiling in the 1st room from east at south, 6th story at north, section ''c''

    Issued 3 Sept 2024Violation dismissed 22 Dec 2024Leaks and plumbing§ 27-2005

  • ×2Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from east at south, 6th story at north, section ''c''

    2 issued 3 Sept 2024Violation dismissedWalls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation radiator at west wall in the 1st room from north at west, 6th story at north, section ''c''

    Issued 3 Sept 2024Violation dismissed 22 Dec 2024Heat and hot water§ 27-2005

  • Repair the roof so that it will not leak at east wall and ceiling in the 1st room from east at south, 6th story at north, section ''c''

    Issued 3 Sept 2024Violation dismissed 22 Dec 2024Leaks and plumbing§ 27-2005

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at east, section ''c'', 2nd from south at west

    Issued 7 Oct 2024Violation closed 13 Nov 2024Pests§ 27-2017.4

  • Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 4th story, section ''a''

    Issued 11 Oct 2024Violation closed 1 Nov 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 3rd story, section ''k-m''

    Issued 28 Feb 2024Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 1st story, section ''k-m''

    Issued 28 Feb 2024Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 6th story, section ''k-m''

    Issued 28 Feb 2024Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 4th story, section ''k-m''

    Issued 28 Feb 2024Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective bulkhead door hinges at 1st public hall bulkhead from north, 6th story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 1st story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 6th story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 5th story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at south wall at public hall, 4th story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door hinges at east wall at public hall, 3rd story

    Issued 8 Nov 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective building front entrance door at section a east section at public hall, 1st story

    Issued 22 Oct 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective at building entrance at public hall, 1st story, section ''a'', 2nd from north at east

    Issued 20 Oct 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective chute on north wall at public hall, 3rd story, section ''a'', 2nd from north at east

    Issued 20 Oct 2023Violation closed 16 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall, 1st door from east at south wall in the 1st room from east at north, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, the bathroom, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the north wall in the foyer, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak at south wall in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from east, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 29 Sept 2024Leaks and plumbing§ 27-2026

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment, 5th story at east, section ''west''

    Issued 6 Jun 2024Violation dismissed 22 Sept 2024Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 1 in the entire apartment, 6th story at east, section ''west''

    Issued 26 Mar 2024Violation closed 18 Sept 2024Fire and safety equipment§ 27-2043.1

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom, 5th story at east, section ''b''

    Issued 6 May 2024Violation dismissed 27 Aug 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom, 5th story at east, section ''b''

    Issued 6 May 2024Violation dismissed 27 Aug 2024Leaks and plumbing§ 27-2026

  • Trace and repair the source and abate the visible mold condition... approximately 2 sqaure feet mold on ceiling in the bathroom, 5th story at east, section ''b''

    Issued 6 May 2024Violation dismissed 27 Aug 2024Mold and damp§ 27-2017.3

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom, 5th story at east, section ''b''

    Issued 6 May 2024Violation dismissed 27 Aug 2024§ 27-2026

  • Trace and repair the source and abate the visible mold condition... approx 2 square feet at east wall in the 3rd room from north at east, 6th story at south, section ''b''

    Issued 17 Apr 2024Violation dismissed 15 Aug 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... at ceiling, approx- 2 square feet in the 2nd room from north at east, 6th story at south, section ''b'', at northwest

    Issued 8 Apr 2024Violation dismissed 15 Aug 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... approximate 3 sq.ft mold at ceiling and south wall in the 3rd room from east at south, 6th story at west, section ''b''

    Issued 7 Apr 2024Violation dismissed 15 Aug 2024Mold and damp§ 27-2017.3

  • Repair the roof so that it will not leak over ceiling and east wall in the 3rd room from north at east, 6th story at south, section ''b''

    Issued 17 Apr 2024Violation dismissed 14 Aug 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story, section ''a''

    Issued 22 Apr 2024Violation dismissed 13 Aug 2024Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story, section ''a''

    Issued 22 Apr 2024Violation dismissed 13 Aug 2024Walls and ceilings§ 27-2013

  • Trace and repair the source and abate the visible mold condition... approximately 4 square feet mold at ceiling in the 3rd room from east at south, 6th story at west, section ''b''

    Issued 9 Apr 2024Violation dismissed 13 Aug 2024Mold and damp§ 27-2017.3

  • Paint with light colored paint to the satisfaction of this department ceiling at bulkhead area to roof at public hall, 6th story, section ''b''

    Issued 9 Apr 2024Violation dismissed 7 Aug 2024Roof and outside the building§ 27-2013

Showing the 100 most recent of 301.

494 violations on record in total, 192 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

269 complaints in three years, 54 of them in the last twelve months.

  • Heat and hot water33 / 157
  • Elevator0 / 20
  • Doors and windows1 / 20
  • Noise5 / 19
  • Mold and damp2 / 12
  • Walls and ceilings2 / 11
  • Leaks and plumbing1 / 9
  • Fire and safety equipment4 / 5
  • Pests0 / 4
  • Lead paint1 / 3
  • Construction and illegal work2 / 3
  • Floors and stairs0 / 2
  • Appliances1 / 1
  • Other0 / 1
  • Entry, buzzer and mail1 / 1
  • Electrical1 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

1 case pending, 6 closed.

  • Tenant ActionPending

    Opened 12 Sept 2024

  • Heat and Hot Water

    Opened 13 May 2026

  • Heat and Hot Water

    Opened 22 Jan 2024

  • Tenant Action/Harassment

    Opened 5 May 2021

  • Tenant Action/Harassment

    Opened 10 Mar 2021

  • Access Warrant - lead

    Opened 12 Mar 2014

  • Access Warrant - Non-Lead

    Opened 4 Mar 2013

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20231 eviction
  • 20182 evictions
  • 20171 eviction

Filings

Public filing

Building permits

No permit currently in force. 6 permits filed in the last five years.

Show 6 expired or finished
  • General Construction

    FILING FOR MINOR INTERIOR RENOVATIONS OF AN EXISTING DOCTORS UNIT

    Issued 5 Jul 2024Expired 7 Mar 2025

  • Antenna

    Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in basement. Initial installation approved under application #400892806. PAA to show platform, cabinet, and telco conduit to remain.

    Issued 24 Jan 2024Expired 31 Dec 2024

  • Plumbing

    PLUMBING FILING IN CONJUNCTION WITH ALT I APPLICATION Q00716710. REPLACING EXISTING FIXTURES WI NEW FIXTURES ON EXSTING ROUGHING AND PROPOSING NEW ADA WATER FOUNTAIN AND 2 NEW LAVATORIES

    Issued 13 Oct 2023Expired 4 Aug 2024

  • Boiler Equipment

    REFILING OF JOB No. Q00301280 FOR THE REPLACEMENT OF BOILER AND GAS/OIL BURNER WITH BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 22 Aug 2023Expired 8 Mar 2024

  • General Construction

    FILLING APPLICATION FOR THE INTERIOR RENOVATION OF AN EXISTING DOCTOR OFFICE AND AN EXISTING RESIDENTIAL UNIT TO BE INCORPORATED TO NAMED DOCTOR OFFICE @ PARTIAL 1ST FLOOR

    Issued 13 Jul 2023Expired 13 Jul 2024

  • Mechanical Systems

    MECHANICAL APPLICATION IN CONJUNCTION WITH ALT I APPLICATION JOB #Q00716710

    Issued 13 Jul 2023Expired 13 Jul 2024

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 20266 of 116 units reported infested (2024 report)
Show 7 earlier reports
  • 20253 of 116 units reported infested (2023 report)
  • 20234 of 116 units reported infested (2022 report)
  • 20224 of 116 units reported infested (2021 report)
  • 20213 of 116 units reported infested (2020 report)
  • 20205 of 116 units reported infested (2019 report)
  • 20192 of 116 units reported infested (2018 report)
  • 20192 of 116 units reported infested (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    GERMAN CACERES

    Public records list GERMAN CACERES as the registered managing agent for this address as of 12 Sept 2026. Source: HPD registration.

    Other buildings listed under this agent (6 in the records we hold)

    Show 3 more

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    ONEOTA ASSOCIATES LLC

    Public records list ONEOTA ASSOCIATES LLC as the owner of record for this address as of 12 Sept 2026. Source: HPD registration.

    Other buildings listed under this owner (1 in the records we hold)

    No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 55 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. HPD has 1 case pending against the owner in Housing Court (tenant action). Ask what it is about and whether the work has been done.
  3. There were 33 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  4. There are 3 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4008460048 · Block 846, Lot 48 · Building class D1