34-01 28 Avenue, Astoria, NY 11103
Built 1926 · 5-story walk-up · 41 apartments
81 immediately hazardous violations open. 191 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 19181 · 82 · 28
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 3 | 0 |
| 2023 | 5 | 2 |
| 2024 | 0 | 0 |
| 2025 | 19 | 9 |
| 2026 so far | 32 | 7 |
Plus 362 violations from 1996 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 22
- Walls and ceilings 17
- Pests 9
- Open per apartment
- 4.7 (191 open across 41 apartments)
- Inspector last found a problem
- 6 Oct 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 3 days.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 3 | 3 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous81 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Replace or repair the self-closing doors that is missing or defective latch at bulkhead door leading to roof
Issued 6 Oct 2026Violation will be reinspected 27 Oct 2026Fire and safety equipment§ 27-2005 +3
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 27 Sept 2026Walls and ceilings§ 27-2005
Abate the infestation consisting of roaches in the entire apartment, 3rd story at west
Issued 22 Sept 2026Notice of issuance sent to tenant 24 Sept 2026Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 2nd story at east
Issued 17 Sept 2026Civ14 mailed 4 Oct 2026Pests§ 27-2017.4
Abate the nuisance consisting of air conditioner unit at fire escape window in the 2nd room from north, 2nd story at east
Issued 17 Sept 2026Invalid certification 1 Oct 2026Fire and safety equipment§ 27-2005 +1
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east
Issued 17 Sept 2026Civ14 mailed 4 Oct 2026Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer, 1st story at south
Issued 16 Sept 2026Invalid certification 16 Oct 2026Lead paint§ 27-2056.6
Abate the nuisance consisting of scalding hot water above 130f at all hot water fixtures in the entire apartment, 1st story at west
Issued 16 Sept 2026First no access to re- inspect violation 7 Oct 2026Heat and hot water§ 27-2005 +1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway, 1st story at south
Issued 16 Sept 2026Invalid certification 16 Oct 2026Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment, 1st story at south
Issued 16 Sept 2026Civ14 mailed 4 Oct 2026Fire and safety equipment§ 27-2043.1
Show all 81Show fewer
Abate the infestation consisting of roaches in the entire apartment, 1st story at south
Issued 16 Sept 2026Civ14 mailed 4 Oct 2026Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from north, 1st story at south
Issued 16 Sept 2026Invalid certification 16 Oct 2026Lead paint§ 27-2056.6
Abate the infestation consisting of roaches in the entire apartment, 1st story at west
Issued 16 Sept 2026Civ14 mailed 14 Oct 2026Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the kitchen, 1st story at south
Issued 16 Sept 2026Invalid certification 16 Oct 2026Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north, 1st story at south
Issued 16 Sept 2026Invalid certification 16 Oct 2026Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment, 1st story at west
Issued 16 Sept 2026Civ14 mailed 14 Oct 2026Fire and safety equipment§ 27-2043.1
Abate the nuisance consisting of consisting of padlock at door leading to fire escape window in the 4th room from east at north, 2nd story at north
Issued 4 Aug 2025Not complied with 10 Sept 2025Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective 2nd marble tread up from bottom at public hall stairs, 1st story
Issued 18 Jun 2025Notice sent out 26 Jun 2025Floors and stairs§ 27-2005
Provide ready access to buildings heating system door locked at basement
Issued 4 Jan 2023Invalid certification 9 Jan 2023Heat and hot water§ 27-2033
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from north, 4th story at east
Issued 13 Aug 2021Notice certified late 30 Sept 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 1st room from north, 4th story at east
Issued 13 Aug 2021Notice certified late 30 Sept 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen, 4th story at east
Issued 13 Aug 2021Notice certified late 30 Sept 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer, 4th story at east
Issued 13 Aug 2021Notice certified late 30 Sept 2021Lead paint§ 27-2056.6
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at north
Issued 27 Jul 2021Notice sent out 10 Aug 2021Lead paint§ 27-2056.7 +2
×2Correct failure to notify occupants and/or to investigate lead-based paint hazards.
2 issued 1 Sept 2020 to 12 Jul 2021Notice sent outLead paint§ 27-2056.4
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six, 5th story at west
Issued 26 May 2021Certification postponment denied 6 Jul 2021Lead paint§ 27-2056.7 +2
×2Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
2 issued 16 Mar 2020 to 13 May 2021Notice sent outLead paint§ 27-2056.4 +1
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Issued 13 Apr 2021Notice sent out 3 Jun 2021Lead paint§ 27-2056.7
Abate the infestation consisting of roaches in the entire apartment, 5th story at west
Issued 9 Apr 2021Not complied with 27 May 2021Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 5th story at west
Issued 9 Apr 2021Not complied with 27 May 2021Pests§ 27-2017.4
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 4th story at east
Issued 26 Sept 2020Notice sent out 28 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.... in the entire apartment, 3rd story at west
Issued 26 Sept 2020Notice sent out 28 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 2nd story at south
Issued 26 Sept 2020Notice sent out 28 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 4th story at east
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 3rd story at south
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 4th story at north
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 5th story at north
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Abate the infestation consisting of roaches in the entire apartment, 5th story at north
Issued 1 Sept 2020Notice certified late 6 Oct 2020Pests§ 27-2017.4
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 1st story at south
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 3rd story at east
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 2nd story at east
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 2nd story at south
Issued 1 Sept 2020Notice sent out 2 Sept 2020Lead paint§ 27-2056.8
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 3rd story at west
Issued 2 Aug 2017Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Remove all obstructions and repair all defects in,bath tub in the bathroom, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018§ 27-2026
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the private hallway, 4th story at east
Issued 15 Sept 2016Defect letter issued 12 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the foyer, 4th story at east
Issued 15 Sept 2016Defect letter issued 12 Aug 2018Lead paint§ 27-2056.6
×2Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner
2 issued 5 Dec 2009 to 26 May 2016First no access to re- inspect violation§ 27-2056.7
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 2nd story at north
Issued 24 May 2016First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2043.1
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the foyer, 2nd story at north
Issued 24 May 2016First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 4; in the entire apartment, 4th story at east
Issued 10 Mar 2016Not complied with 12 Aug 2018Fire and safety equipment§ 27-2043.1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, west wall, 1st window frame from east at south wall in the 3rd room from north at west, 1st story at west
Issued 7 Aug 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, east wall in the foyer, 1st story at west
Issued 7 Aug 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen, 1st story at west
Issued 7 Aug 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchenette, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the foyer, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, east wall, west wall in the 3rd room from east, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall in the bathroom, 1st story at west
Issued 22 Jan 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 1st story at west
Issued 22 Jan 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the foyer, 1st story at west
Issued 22 Jan 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd room from north at east, 1st story at west
Issued 22 Jan 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north, 1st story at west
Issued 22 Jan 2015Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3;, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2043.1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the foyer, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the foyer, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the kitchen, 5th story at east
Issued 22 Jun 2010Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from north, 5th story at east
Issued 22 Jun 2010Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway, 5th story at east
Issued 22 Jun 2010Defect letter issued 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st riser from south at west wall in the kitchen, 4th story at west
Issued 26 Sept 2009First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st window frame from south at west wall in the 3rd room from east at south, 4th story at west
Issued 26 Sept 2009First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall, north wall in the 1st room from east at south, 4th story at west
Issued 26 Sept 2009First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer, 4th story at west
Issued 26 Sept 2009First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 2nd story at north
Issued 23 Jun 2007Defect letter issued 12 Aug 2018Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the bathroom, 3rd story
Issued 18 Aug 2003First no access to re- inspect violation 17 Aug 2018Lead paint§ 27-2056.5
Remove or cover in a manner approved by the department the peeling lead paint and or plaster 1 sty an apartment southwest room east wall er1 96026294., section '' ''
Issued 9 Sept 1996Defect letter issued 17 Aug 2018Lead paint§ 27-2013
Remove or cover in a manner approved by the department the peeling lead paint and or plaster 1 sty an apartment southeast room east wall er1 96926294., section '' ''
Issued 9 Sept 1996Defect letter issued 17 Aug 2018Lead paint§ 27-2013
Hazardous82 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 24 Sept 2026Fire and safety equipment§ 27-2045 +3
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 24 Sept 2026Fire and safety equipment§ 27-2045 +2
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 27 Sept 2026Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 27 Sept 2026Walls and ceilings§ 27-2005
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 2nd story at east
Issued 17 Sept 2026Civ14 mailed 4 Oct 2026Fire and safety equipment§ 27-2045 +3
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 2nd story at east
Issued 17 Sept 2026Civ14 mailed 4 Oct 2026Fire and safety equipment§ 27-2045 +2
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north, 1st story at south
Issued 17 Sept 2026Notice sent out 17 Sept 2026Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom, 1st story at south
Issued 17 Sept 2026Notice sent out 17 Sept 2026Leaks and plumbing§ 27-2005
Abate the nuisance consisting of air conditioner unit protruding into the fire escape window in the 3rd room from north at east, 4th story at west
Issued 16 Aug 2026Invalid certification 1 Oct 2026Fire and safety equipment§ 27-2005 +1
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment, 4th story at west
Issued 16 Aug 2026Invalid certification 27 Sept 2026Fire and safety equipment§ 27-2045 +3
Show all 82Show fewer
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment, 4th story at west
Issued 16 Aug 2026Invalid certification 27 Sept 2026Fire and safety equipment§ 27-2045 +2
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the 3rd room from north at west, 4th story at west
Issued 16 Aug 2026Invalid certification 27 Sept 2026Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at east
Issued 9 May 2025Not complied with 23 Jun 2025Fire and safety equipment§ 27-2046.1
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 3rd story balcony, east stack at building front at fire escape
Issued 9 May 2025Not complied with 23 Jun 2025Fire and safety equipment§ 27-2005 +1
Repair or replace the smoke detector defective in the entire apartment, 1st story at east
Issued 9 May 2025Not complied with 23 Jun 2025Fire and safety equipment§ 27-2045
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at west
Issued 13 Aug 2021Notice sent out 16 Aug 2021Lead paint§ 27-2056.7 +1
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north, 4th story at east
Issued 13 Aug 2021Invalid certification 30 Sept 2021Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north, 4th story at east
Issued 13 Aug 2021Invalid certification 30 Sept 2021Walls and ceilings§ 27-2005
Abate the infestation consisting of bedbugs, 4th story at east
Issued 13 Aug 2021Invalid certification 30 Sept 2021Pests§ 27-2017.4
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east
Issued 27 Jul 2021Invalid certification 30 Sept 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east
Issued 12 Jul 2021Notice sent out 14 Jul 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at east
Issued 12 Jul 2021Notice sent out 14 Jul 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at south
Issued 12 Jul 2021Notice sent out 14 Jul 2021Lead paint§ 27-2056.7 +1
Abate the nuisance consisting of mice in the entire apartment, 3rd story at north
Issued 5 Dec 2017Not complied with 12 Aug 2018Pests§ 27-2018
Properly repair with similar material the broken or defective uneven wood floor in the foyer, 3rd story at north
Issued 5 Dec 2017Not complied with 12 Aug 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective,bath tub (reglaze) in the bathroom, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018§ 27-2005
Properly repair the broken or defective,window counter balance lower sash in the kitchen, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2005
Trace and repair the source and abate the nuisance consisting of mold...,20 sq ft 1st window frame from south at west wall, west wall in the bathroom, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Mold and damp§ 27-2005
Properly repair the source and abate the evidence of a water leak, west wall, ceiling in the 3rd room from north, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak, ceiling, west wall in the 4th room from north, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Repair or replace the carbon monoxide detecting device(s).,missing in the entire apartment, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2046.1
Properly secure the loose,electrical outlet in the kitchen, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Electrical§ 27-2005
Properly repair with similar material the broken or defective,ceramic tiles at south and west walls in the bathroom, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Repair the leaky and/or defective faucets,at bath tub in the bathroom, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom, 3rd story
Issued 5 Jun 2017Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective wooden floor throughout in the entire apartment, 3rd story at west
Issued 21 Feb 2017Not complied with 12 Aug 2018Floors and stairs§ 27-2005
Abate the nuisance consisting of bedbugs in the entire apartment, 4th story at north
Issued 5 Dec 2016First no access to re- inspect violation 17 Aug 2018Pests§ 27-2018
Properly repair with similar material the broken or defective wood floor in the 2nd room from east, 4th story at north
Issued 5 Dec 2016First no access to re- inspect violation 17 Aug 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor at the radiator in the 3rd room from east, 4th story at north
Issued 5 Dec 2016First no access to re- inspect violation 17 Aug 2018Heat and hot water§ 27-2005
Properly repair with similar material the broken or defective wood floor in the private hallway, 4th story at north
Issued 5 Dec 2016First no access to re- inspect violation 17 Aug 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective the wood floor bulging at center in the 2nd room from east, 4th story at north
Issued 5 Dec 2016First no access to re- inspect violation 17 Aug 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor at center room in the 2nd room from north, 4th story at west
Issued 29 Nov 2016First no access to re- inspect violation 17 Aug 2018Floors and stairs§ 27-2005
Abate the nuisance consisting of bedbugs in the entire apartment, 4th story at west
Issued 29 Nov 2016First no access to re- inspect violation 17 Aug 2018Pests§ 27-2018
Repair or replace the smoke detector missing, 4th story at west
Issued 7 Nov 2016First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2045
Properly repair the broken or defective counterbalance upper window sash in the 2nd room from north, 4th story at west
Issued 7 Nov 2016First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2005
Properly secure the loose washbasin cabinet, in the bathroom, 3rd story at north
Issued 20 Jul 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling & walls, in the bathroom, 3rd story at north
Issued 20 Jul 2016First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Replace with new the missing caulking around bathtub, in the bathroom, 3rd story at north
Issued 20 Jul 2016First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the 2nd bathroom, 3rd story
Issued 20 Jul 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Properly repair the broken or defective lower window sash in the kitchen, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2005
Properly repair with similar material the broken or defective wood window frame in the 4th bedroom from north, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the bathroom, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Properly repair the broken or defective locks on entrance door. in the entrance, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the 3rd living room from north, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Repair the roof so that it will not leak ceiling. over 5sty public hall.
Issued 25 Apr 2016Not complied with 12 Aug 2018Leaks and plumbing§ 27-2005
Repair the leaky and/or defective faucets bathtub. in the bathroom, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective ceramic tile walls. in the bathroom, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Repair the roof so that it will not leak ceiling. in the entire apartment, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the 4th bedroom from north, 5th story at west
Issued 25 Apr 2016First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment, 3rd story at west
Issued 29 Jan 2016Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Abate the nuisance consisting of mice in the entire apartment, 1st story at west
Issued 7 Aug 2015Not complied with 17 Aug 2018Pests§ 27-2018
Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom, 1st story at west
Issued 7 Aug 2015Not complied with 17 Aug 2018Leaks and plumbing§ 27-2005
Abate the nuisance consisting of roaches in the entire apartment, 1st story at west
Issued 7 Aug 2015Not complied with 17 Aug 2018Pests§ 27-2018
Repair or replace the smoke detector inoperative, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). inoperative, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2046.1
Abate the nuisance consisting of mice, 1st story at west
Issued 30 Mar 2015Not complied with 17 Aug 2018Pests§ 27-2018
Repair or replace the smoke detector -inoperative-, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2045
Arrange and make self-closing the doors at bulkhead at public hall stairs, 5th story
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2005 +1
Repair or replace the carbon monoxide detecting device(s). -inoperative-, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Fire and safety equipment§ 27-2046.1
Replace with new the missing ceramic tiles west wall in the bathroom, 3rd story
Issued 24 Sept 2012First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls in the bathroom, 3rd story
Issued 24 Sept 2012First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Remove all obstructions and repair all defects in bathtub in the bathroom, 3rd story
Issued 24 Sept 2012First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 3rd story
Issued 24 Sept 2012First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets bathtub in the bathroom, 3rd story
Issued 24 Sept 2012First no access to re- inspect violation 17 Aug 2018Leaks and plumbing§ 27-2026
Abate the nuisance consisting of concealed water leak at ceiling in the kitchen, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Leaks and plumbing§ 27-2005 +1
Abate the nuisance consisting of concealed water leak at ceiling in the bathroom, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Leaks and plumbing§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Abate the nuisance consisting of concealed water leak at ceiling in the 1st room from east, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Leaks and plumbing§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east, 5th story
Issued 14 Dec 2010Not complied with 12 Aug 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, west wall in the bathroom, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Arrange and make self-closing the doors leading to public hall in the foyer, 5th story at east
Issued 22 Jun 2010Not complied with 17 Aug 2018Fire and safety equipment§ 27-2005 +1
Non-hazardous28 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Issued 6 Oct 2026Notice sent out 8 Oct 2026Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom, 3rd story at west
Issued 22 Sept 2026Notice sent out 24 Sept 2026Walls and ceilings§ 27-2013
Cleanse to the satisfaction of this department the bathtub and tile walls in the bathroom, 2nd story at east
Issued 18 Sept 2026Notice sent out 22 Sept 2026Leaks and plumbing§ 27-2011
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at east wall in the bathroom, 1st story at south
Issued 17 Sept 2026Notice of issuance sent to tenant 17 Sept 2026Mold and damp§ 27-2017.3
Paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north, 1st story at south
Issued 17 Sept 2026Notice sent out 17 Sept 2026Walls and ceilings§ 27-2013
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at north wall in the bathroom, 1st story at south
Issued 17 Sept 2026Notice of issuance sent to tenant 17 Sept 2026Mold and damp§ 27-2017.3
Paint with light colored paint to the satisfaction of this department at south wall in the 4th room from north, 1st story at south
Issued 17 Sept 2026Notice sent out 17 Sept 2026Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective wood saddle in the bathroom, 3rd story at east
Issued 9 May 2025Not complied with 23 Jun 2025§ 27-2005
Paint metal in accordance with dept. regulation the riser in the bathroom, 3rd story at east
Issued 9 May 2025Not complied with 23 Jun 2025Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department at the 1st door frame from east at south wall in the 1st room from north, 4th story at east
Issued 13 Aug 2021Invalid certification 30 Sept 2021Doors and windows§ 27-2013
Show all 28Show fewer
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 4th room from north, 4th story at east
Issued 13 Aug 2021Invalid certification 30 Sept 2021Doors and windows§ 27-2013
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west, 3rd story at west
Issued 19 Sept 2017Not complied with 12 Aug 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor in the 2nd room from north, 3rd story at west
Issued 19 Sept 2017Not complied with 12 Aug 2018Floors and stairs§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the private hallway, the 3rd room from north, the foyer, the bathroom, the kitchen, the 1st room from north at east, the 4th room from north, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department,all walls and ceilings in the entire apartment, 5th story at west
Issued 16 Jul 2017First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective linoleum floor in the 2nd room from north, 4th story at west
Issued 7 Nov 2016First no access to re- inspect violation 17 Aug 2018Floors and stairs§ 27-2005
Properly repair the broken or defective bell/buzzer system, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Entry, buzzer and mail§ 27-2005
Paint with light colored paint to the satisfaction of this department, baseboard at west wall in the 3rd room from east, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, 3rd story at north
Issued 30 Mar 2015First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the 3rd room from north at east, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Properly repair the broken or defective and/or inoperative intercom system, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Entry, buzzer and mail§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st window frame from east at south wall in the 3rd room from north at west, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 3rd room from north at west, 4th story at west
Issued 29 May 2013First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the 3rd room from north at west, the 1st room from north at center, the private hallway, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st door frame from north at east wall, 1st door from north at east wall in the bathroom, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the kitchen, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Doors and windows§ 27-2013
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom, 4th story at west
Issued 24 Jun 2010First no access to re- inspect violation 17 Aug 2018Walls and ceilings§ 27-2005
248 closed violations, plus 4 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Replace or repair the self-closing doors that is missing or defective latch set in the entrance, 2nd story at east
Issued 17 Sept 2026Violation closed 7 Oct 2026Fire and safety equipment§ 27-2005 +3
Properly repair and abate unsafe electric wiring condition consisting of electric wiring traveling from kitchenette to foyer in the foyer, 2nd story at east
Issued 17 Sept 2026Violation closed 7 Oct 2026Electrical§ 27-2005
Properly repair and abate unsafe electric wiring condition consisting of extention cord traveling from kitchenette feeding ac unit in the 2nd room from north, 2nd story at east
Issued 17 Sept 2026Violation closed 7 Oct 2026Electrical§ 27-2005
Abate the nuisance consisting of scalding hot water above 130f at all hot water fixtures in the entire apartment, 1st story at south
Issued 16 Sept 2026Violation closed 7 Oct 2026Heat and hot water§ 27-2005 +1
Abate the infestation consisting of mice in the entire apartment, 1st story at west
Issued 4 Aug 2025Violation dismissed 26 Oct 2025Pests§ 27-2017.4
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 1st story at west
Issued 4 Aug 2025Violation dismissed 26 Oct 2025Fire and safety equipment§ 27-2045 +3
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 1st story at west
Issued 4 Aug 2025Violation dismissed 26 Oct 2025Fire and safety equipment§ 27-2045 +2
Abate the infestation consisting of roaches in the entire apartment, 1st story at west
Issued 4 Aug 2025Violation dismissed 26 Oct 2025Pests§ 27-2017.4
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 2nd story at north
Issued 4 Aug 2025Violation closed 19 Aug 2025Fire and safety equipment§ 27-2005 +3
Properly repair or replace the broken or defective cracked glass pane at building entrance door, 1st story
Issued 18 Jun 2025Violation closed 4 Aug 2025Doors and windows§ 27-2005
Abate the nuisance consisting of key operated lock at door leading to fire escape in the 3rd room from north at west, 3rd story at east
Issued 9 May 2025Violation dismissed 27 Jul 2025Fire and safety equipment§ 27-2005 +1
Abate the infestation consisting of roaches in the entire apartment, 1st story at east
Issued 9 May 2025Violation dismissed 27 Jul 2025Pests§ 27-2017.4
Properly repair or replace the broken or defective base cabinet at north wall in the kitchen, 1st story at east
Issued 9 May 2025Violation closed 21 Jul 2025Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway, 1st story at east
Issued 9 May 2025Violation closed 21 Jul 2025Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north, 1st story at east
Issued 9 May 2025Violation closed 21 Jul 2025Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north at east, 3rd story at east
Issued 9 May 2025Violation closed 21 Jul 2025Floors and stairs§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from north at east, 3rd story at east
Issued 9 May 2025Violation closed 21 Jul 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective bell buzzer from vestibule 1st story public hall to north wall in the foyer, 3rd story at east
Issued 9 May 2025Violation closed 21 Jul 2025Entry, buzzer and mail§ 27-2005
Properly repair or replace the broken or defective pilot at gas range in the kitchen, 1st story at east
Issued 9 May 2025Violation closed 21 Jul 2025Appliances§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 3rd story at east
Issued 9 May 2025Violation closed 23 Jun 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective counter balances at 2nd window lower sash at east wall in the 2nd room from north, 1st story at east
Issued 9 May 2025Violation closed 23 Jun 2025Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen, 1st story at east
Issued 9 May 2025Violation closed 23 Jun 2025Walls and ceilings§ 27-2005
Cleanse to the satisfaction of this department the visible mold along grout at bathtub in the bathroom, 3rd story at east
Issued 9 May 2025Violation closed 23 Jun 2025Mold and damp§ 27-2011
Paint with light colored paint to the satisfaction of this department door in the bathroom, 3rd story at east
Issued 9 May 2025Violation closed 23 Jun 2025Doors and windows§ 27-2013
Properly secure the loose transition wood saddle in the 2nd room from north, 1st story at east
Issued 9 May 2025Violation closed 23 Jun 2025§ 27-2005
×2Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
2 issued 12 Apr 2022 to 25 Oct 2023Violation dismissedWalls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Issued 25 Oct 2023Violation dismissed 21 Apr 2024Walls and ceilings§ 27-2013
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Issued 25 Oct 2023Violation dismissed 21 Jan 2024Leaks and plumbing§ 27-2005
Replace or repair the self-closing doors that is missing or defective bulkhead door hinges at 1st public hall bulkhead from north, 5th story
Issued 25 Oct 2023Violation closed 20 Nov 2023Fire and safety equipment§ 27-2005 +3
Abate the infestation consisting of roaches in the entire apartment, 4th story at west
Issued 4 Jan 2023Violation dismissed 2 Apr 2023Pests§ 27-2017.4
Replace or repair the self-closing doors that is missing or defective bulkhead door to roof at public hall, 5th story
Issued 28 Nov 2022Violation dismissed 20 Feb 2023Fire and safety equipment§ 27-2005 +2
Provide hot water at all hot water fixtures in the entire apartment, 4th story at west
Issued 4 Jan 2023Violation closed 29 Jan 2023Heat and hot water§ 27-2031
Repair the roof so that it will not leak over the ceiling at public hall, 5th story
Issued 12 Apr 2022Violation dismissed 28 Jul 2022Leaks and plumbing§ 27-2005
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 3rd room from east, 2nd story at north
Issued 27 Jul 2021Violation dismissed 9 Jan 2022Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department the west wall, 1st window frame from west at north wall in the 1st room from east at north, 2nd story at north
Issued 27 Jul 2021Violation dismissed 9 Jan 2022Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from west at north wall, west wall, east wall, ceiling in the bathroom, 2nd story at north
Issued 27 Jul 2021Violation dismissed 9 Jan 2022Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 3rd room from north at west, 5th story at west
Issued 26 May 2021Violation dismissed 9 Jan 2022Doors and windows§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from north, 5th story at west
Issued 26 May 2021Violation dismissed 9 Jan 2022Walls and ceilings§ 27-2005
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at south
Issued 13 Aug 2021Violation closed 8 Dec 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at south
Issued 13 Aug 2021Violation closed 8 Dec 2021Lead paint§ 27-2056.7 +1
×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at east
2 issued 12 Jul 2021 to 13 Aug 2021Violation closedLead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 5th story at east
Issued 20 Jul 2021Violation closed 8 Dec 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at east
Issued 12 Jul 2021Violation closed 8 Dec 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north
Issued 12 Jul 2021Violation closed 8 Dec 2021Lead paint§ 27-2056.7 +1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 2nd story at north
Issued 27 Jul 2021Violation closed 30 Nov 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 1st room from east at north, 2nd story at north
Issued 27 Jul 2021Violation closed 30 Nov 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the foyer, 2nd story at north
Issued 27 Jul 2021Violation closed 30 Nov 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall in the 3rd room from east, 2nd story at north
Issued 27 Jul 2021Violation closed 30 Nov 2021Lead paint§ 27-2056.6
Abate the infestation consisting of roaches, 4th story at east
Issued 13 Aug 2021Violation dismissed 21 Nov 2021Pests§ 27-2017.4
Abate the infestation consisting of mice, 4th story at east
Issued 13 Aug 2021Violation dismissed 21 Nov 2021Pests§ 27-2017.4
Properly secure the loose light fixture at the ceiling at public hall, 2nd story
Issued 20 Jul 2021Violation dismissed 24 Oct 2021Walls and ceilings§ 27-2005
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east
Issued 27 Jul 2021Violation closed 14 Oct 2021Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-an apartment, 1st bsmt-apartment from north at east
Issued 12 Jul 2021Violation closed 14 Oct 2021Lead paint§ 27-2056.7 +1
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from north at west, 5th story at west
Issued 26 May 2021Violation closed 15 Aug 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north, 5th story at west
Issued 26 May 2021Violation closed 15 Aug 2021Lead paint§ 27-2056.6
Arrange and make self-closing the doors at apartment entrance, 5th story at west
Issued 26 May 2021Violation closed 10 Aug 2021Fire and safety equipment§ 27-2005 +1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 3rd room from east, 5th story at north
Issued 1 Sept 2020Violation closed 7 Feb 2021Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east at north, 5th story at north
Issued 1 Sept 2020Violation closed 7 Feb 2021Lead paint§ 27-2056.6
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, 5th story at north
Issued 1 Sept 2020Violation dismissed 5 Jan 2021Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, 1st door from north at east wall, 1st closet from east at south wall door frame in the 3rd room from east, 5th story at north
Issued 1 Sept 2020Violation dismissed 5 Jan 2021Doors and windows§ 27-2013
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 5th story
Issued 31 Aug 2020Violation dismissed 5 Jan 2021Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Issued 31 Aug 2020Violation dismissed 5 Jan 2021Walls and ceilings§ 27-2013
Repair the roof so that it will not leak at ceiling in the 3rd room from east, 5th story at north
Issued 1 Sept 2020Violation dismissed 27 Dec 2020Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east, 5th story at north
Issued 1 Sept 2020Violation dismissed 27 Dec 2020Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north, 5th story at north
Issued 1 Sept 2020Violation dismissed 27 Dec 2020Walls and ceilings§ 27-2005
Repair or replace the smoke detector defective in the entire apartment, 5th story at north
Issued 1 Sept 2020Violation dismissed 27 Dec 2020Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 5th story at north
Issued 1 Sept 2020Violation dismissed 27 Dec 2020Fire and safety equipment§ 27-2046.1
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 5th story at north
Issued 1 Sept 2020Violation dismissed 17 Nov 2020Fire and safety equipment§ 27-2043.1
Replace with new the missing wood saddle in the kitchen, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018§ 27-2005
Properly repair the broken or defective wood saddle in the 3rd room from north at west, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018§ 27-2005
Refit door in the bathroom, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Doors and windows§ 27-2005
Properly repair the broken or defective upper and lower sash window in the kitchen, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Doors and windows§ 27-2005
Properly repair the broken or defective burner of gas range in the kitchen, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Appliances§ 27-2005
Properly repair with similar material the broken or defective wood floor in the 2nd room from north, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor in the private hallway, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Floors and stairs§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Walls and ceilings§ 27-2005
Properly repair the broken or defective lower sash window at west in the 3rd room from north at west, 3rd story at west
Issued 4 Sept 2018Violation dismissed 26 Dec 2018Doors and windows§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 5th story at east
Issued 15 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2046.1
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate.. in the 1st room from north, 5th story at east
Issued 15 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors at the apartment entrance, 2nd story at west
Issued 15 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Repair or replace the smoke detector missing in the entire apartment, 5th story at east
Issued 15 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2045
Repair or replace the smoke detector missing, 5th story at south
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2045
Remove the illegal fastening lockable hasp with eye at the door to room with fire escape in the 4th room from north, 2nd story at west
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom, 2nd story at west
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Leaks and plumbing§ 27-2026
Arrange and make self-closing the doors at the entrance in the foyer, 4th story at east
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Repair or replace the smoke detector missing, 3rd story
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2045
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 3rd story
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2046.1
Abate the nuisance consisting of air conditioner in the window, obstructing exit to fire escape, in the 4th room from north, 5th story at south
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Remove the illegal fastening lockable slide bolt with and eye at the entrance door to apartment in the foyer, 3rd story
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Doors and windows§ 27-2005 +1
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 5th story at south
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2046.1
Arrange and make self-closing the doors at the entrance in the foyer, 5th story at south
Issued 8 Aug 2018Violation dismissed 2 Dec 2018Fire and safety equipment§ 27-2005 +1
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; a/c unit must be suported with one way screws and any spaces greater then 4 1/2 '' must be coverd with metal panel in the entire apartment, 4th story at east
Issued 8 Aug 2018Violation dismissed 1 Nov 2018Fire and safety equipment§ 27-2043.1
Properly repair the source and abate the evidence of a water leak ceiling, in the bathroom, 2nd story at north
Issued 24 Aug 2015Violation closed 17 Aug 2018Leaks and plumbing§ 27-2026
Properly repair the broken or defective wood frame double hung window in the 2nd room from north, 2nd story at north
Issued 24 Aug 2015Violation closed 17 Aug 2018Doors and windows§ 27-2005
Repair the leaky and/or defective faucets sink, in the kitchen, 2nd story at north
Issued 24 Aug 2015Violation closed 17 Aug 2018Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets washbasin, in the bathroom, 2nd story at north
Issued 24 Aug 2015Violation closed 17 Aug 2018Leaks and plumbing§ 27-2026
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the 2nd room from north, the bathroom, 1st story at west
Issued 7 Aug 2015Violation closed 17 Aug 2018Walls and ceilings§ 27-2013
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at west
Issued 7 Aug 2015Violation closed 17 Aug 2018Fire and safety equipment§ 27-2046.1
Showing the 100 most recent of 248.
443 violations on record in total, 191 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
72 complaints in three years, 43 of them in the last twelve months.
- Pests8 / 24
- Leaks and plumbing14 / 14
- Fire and safety equipment9 / 11
- Heat and hot water2 / 4
- Mold and damp4 / 4
- Doors and windows2 / 3
- Roof and outside the building2 / 3
- Walls and ceilings0 / 2
- Construction and illegal work1 / 2
- Noise1 / 2
- Floors and stairs0 / 1
- Electrical0 / 1
- Appliances0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
4 cases, all closed.
Tenant Action
Opened 6 Jul 2021
Comprehensive
Opened 5 Feb 2018
False Certification Non-Lead
Opened 19 Sept 2016
False Certification Non-Lead
Opened 21 Dec 2009
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
- 20191 eviction
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 20261 of 40 units reported infested (2024 report)
Show 7 earlier reportsShow fewer
- 2025No infested units reported (2023 report)
- 20232 of 40 units reported infested (2022 report)
- 20221 of 40 units reported infested (2021 report)
- 20214 of 40 units reported infested, 1 re-infested (2020 report)
- 20201 of 40 units reported infested (2019 report)
- 2019No infested units reported (2018 report)
- 20191 of 40 units reported infested (2017 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
GERMAN CACERES
Public records list GERMAN CACERES as the registered managing agent for this address as of 12 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (6 in the records we hold)
- 21-38 31 Street186 open violations · no reviews yet
- 31-18 35 Street105 open violations · no reviews yet
- 21-24 31 Street88 open violations · no reviews yet
Show 3 moreShow fewer
- 31-45 Crescent Street66 open violations · no reviews yet
- 25-81 34 Street48 open violations · no reviews yet
- 28-46 41 Street20 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
34-05 REALTY ASSOCIATES LLC
Public records list 34-05 REALTY ASSOCIATES LLC as the owner of record for this address as of 12 Sept 2026. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
34-01 28 Avenue, Astoria, NY 11103
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 81 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There are 3 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There were 8 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- This building dates from 1926 and has 62 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 191 open housing violations: 81 immediately hazardous, 82 hazardous and 28 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (22), walls and ceilings (17) and pests (9).
On 6 Oct 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 3 days, and HPD issued 0 heat violations.
City marshals carried out 1 residential eviction here since 2017. The record says nothing about why, and most follow a case for unpaid rent.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4006320075 · Block 632, Lot 75 · Building class C1
