21-24 31 Street, Astoria, NY 11105
Built 1929 · 6-story elevator building · 116 apartments
34 immediately hazardous violations open. 88 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 8834 · 43 · 11
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 16 | 0 |
| 2024 | 31 | 1 |
| 2025 | 1 | 0 |
| 2026 so far | 12 | 4 |
Plus 155 violations from 1986 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 17
- Heat and hot water 12
- Lead paint 12
- Open per apartment
- 0.8 (88 open across 116 apartments)
- Inspector last found a problem
- 19 May 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 10 days, and inspectors issued 1 violation.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 10 | 12 | 1 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous34 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 2nd room from north at west, 1st story at north
Issued 2 Jan 2026Certification postponment denied 18 Feb 2026Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen, 1st story at north
Issued 2 Jan 2026Certification postponment denied 18 Feb 2026Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the kitchen, 1st story at north
Issued 2 Jan 2026Certification postponment denied 18 Feb 2026Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer, 1st story at north
Issued 2 Jan 2026Certification postponment denied 18 Feb 2026Lead paint§ 27-2056.6
Properly repair with similar material the broken or defective marble tread 2nd from bottom at vestibule area leading to public hall 1st story, section ''d''
Issued 7 Feb 2025Notice sent out 9 Feb 2025§ 27-2005
Abate the infestation consisting of mice in the entire apartment, 2nd story at east, section ''building-b''
Issued 28 Jan 2024Notice of issuance sent to tenant 28 Jan 2024Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east, section ''building-b''
Issued 28 Jan 2024Notice of issuance sent to tenant 28 Jan 2024Pests§ 27-2017.4
Provide ready access to buildings heating system from 1st floor to cellar at boiler room
Issued 11 Mar 2023Not complied with 29 May 2023Heat and hot water§ 27-2033
Abate the infestation consisting of mice in the entire apartment, 2nd story at south, section ''b''
Issued 8 Nov 2021Invalid certification 5 Dec 2021Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 2nd story at east, section ''b''
Issued 8 Nov 2021Invalid certification 5 Dec 2021Pests§ 27-2017.4
Show all 34Show fewer
Arrange and make self-closing the doors entrance, 6th story at east, section ''d''
Issued 29 Mar 2021Notice sent out 30 Mar 2021Fire and safety equipment§ 27-2005 +1
Provide ready access to buildings heating system locked door to boiler room at cellar
Issued 20 Dec 2020Notice sent out 20 Dec 2020Heat and hot water§ 27-2033
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer, 1st story at north
Issued 24 Jul 2017Notice certified late 21 Sept 2017Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from south at west wall in the kitchen, 1st story at north
Issued 24 Jul 2017Notice certified late 21 Sept 2017Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the bathroom, 1st story at west
Issued 18 Mar 2013Notice sent out 24 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the bathroom, 4th story at west
Issued 11 Mar 2013Notice certified late 24 Apr 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from east at south wall in the foyer, 4th story at north
Issued 11 Aug 2009First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall in the foyer, 4th story at north
Issued 11 Aug 2009First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 2nd closet from east at south wall door, 2nd closet from east at south wall door frame, 1st door frame from west at north wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from north, 4th story at west
Issued 13 Sept 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom, 4th story at west
Issued 13 Sept 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from east at south wall in the 1st room from north, 4th story at west
Issued 13 Sept 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door from north at east wall, 1st door frame from north at east wall in the private hallway, 4th story at west
Issued 13 Sept 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the foyer, 1st story at north
Issued 24 Jul 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north, 1st story at north
Issued 24 Jul 2008Defect letter issued 11 Mar 2013Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling in the kitchen, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.5
Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling in the 3rd room from east at north, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.5
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. east wall in the 3rd room from east at north, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.5
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. north wall in the foyer, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.5
Correct the lead-based paint hazard - presumed lead paint that is peeling or is on a deteriorated subsurface - using exclusive interim controls. ceiling, west wall, north wall in the bathroom, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2056.5
Repair the roof so that it will not leak over southeast room 6 sty an apartment er1., section '' ''
Issued 22 Jul 1998Not complied with 11 Mar 2013Leaks and plumbing§ 27-2005
Remove or cover in a manner approved by the department the peeling lead paint and or plaster at east wall in southeast room 6 sty an apartment er1., section '' ''
Issued 22 Jul 1998Defect letter issued 11 Mar 2013Lead paint§ 27-2013
Remove or cover in a manner approved by the department the peeling lead paint and or plaster west wall at bathroom 3 sty an apartment er1 er 96006269., section '' ''
Issued 6 Mar 1996First no access to re- inspect violation 19 Mar 2013Lead paint§ 27-2013
Abate the nuisance consisting of concealed water leak 4 sty north apartment bathroom ceiling er1.
Issued 1 Sept 1992First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2005 +1
Abate the nuisance consisting of double cylinder key operated lock at entrance 5 sty an apartment unit d., section '' ''
Issued 24 Oct 1986First no access to re- inspect violation 19 Mar 2013§ D26-10.01 +1
Hazardous43 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at center court north wall at fire escape, 4th story
Issued 14 Aug 2023Notice sent out 16 Aug 2023Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective fire retardant plaster at east wall, public hall stairs to roof, 6th story
Issued 31 Oct 2019Invalid certification 16 Dec 2019Roof and outside the building§ 27-2005
Provide an adequate supply of gas to the fixtures..range
Issued 23 Oct 2017Notice sent out 24 Oct 2017Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures gas-range in the kitchen, 5th story at west
Issued 5 Sept 2017Notice sent out 6 Sept 2017Appliances§ 27-2070
Properly repair with similar material the broken or defective fire retardant plaster at north wall at public hall, 1st story
Issued 15 Aug 2017Invalid certification 6 Sept 2017Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 2nd room from north, 6th story at south
Issued 27 Jul 2017Invalid certification 6 Sept 2017Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom, 2nd story at north
Issued 27 Jul 2017Invalid certification 6 Sept 2017Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at ceiling in the 2nd room from north, 6th story at south
Issued 27 Jul 2017Invalid certification 6 Sept 2017Leaks and plumbing§ 27-2005
Repair the roof so that it will not leak at ceailing in the 1st room from north, 6th story at south
Issued 27 Jul 2017Invalid certification 6 Sept 2017Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from north, 6th story at south
Issued 27 Jul 2017Invalid certification 6 Sept 2017Walls and ceilings§ 27-2005
Show all 43Show fewer
Abate the nuisance consisting of mice in the entire apartment, 1st story at north
Issued 24 Jul 2017Invalid certification 12 Sept 2017Pests§ 27-2018
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east, 6th story
Issued 13 Jul 2017Notice certified late 6 Sept 2017Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at the ceiling in the 1st room from east, 6th story
Issued 13 Jul 2017Notice certified late 6 Sept 2017Leaks and plumbing§ 27-2005
Provide an adequate supply of gas to the fixtures at range in the kitchen, 2nd story at south
Issued 15 May 2017Notice sent out 16 May 2017Appliances§ 27-2070
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway, 3rd story at north, section ''b building''
Issued 17 Jan 2017Notice sent out 18 Jan 2017Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 3rd story at north, section ''b bldg''
Issued 17 Jan 2017Notice sent out 18 Jan 2017Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color all wall and ceiling in the bathroom, 3rd story at north, section ''b building''
Issued 17 Jan 2017Notice sent out 18 Jan 2017Walls and ceilings§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at center court, 1st story
Issued 23 Jul 2016Invalid certification 6 Sept 2016Garbage and cleanliness§ 27-2010
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen, 1st story at north, section ''b''
Issued 29 Jun 2013Notice sent out 4 Jul 2013Walls and ceilings§ 27-2005
Trace and repair the source and abate the nuisance consisting of mold... walls and ceiling in the 4th room from north, 6th story at east
Issued 19 Sept 2011First no access to re- inspect violation 19 Mar 2013Mold and damp§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment, 6th story at east
Issued 19 Sept 2011First no access to re- inspect violation 19 Mar 2013Walls and ceilings§ 27-2005
Abate the nuisance consisting of concealed water leak east wall in the 1st room from north, 6th story at east
Issued 19 Sept 2011First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2005 +1
Repair the roof so that it will not leak over entire apartment, 6th story at east
Issued 19 Sept 2011First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2005
Repair or replace the smoke detector missing in the entire apartment, 1st story at north, section ''d'', at northeast
Issued 8 Apr 2011First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2045
Properly repair the broken or defective counter balance at lower window sash. bldg. d in the 1st room from north, 1st story at north
Issued 8 Apr 2011First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls bldg. d. in the entire apartment, 1st story at north
Issued 8 Apr 2011First no access to re- inspect violation 19 Mar 2013Walls and ceilings§ 27-2005
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 1st story at north, section ''d'', at northeast
Issued 8 Apr 2011First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2046.1
Properly repair with similar material the broken or defective fire retarding ceiling at stairs bulkhead to roof at public hall, 6th story
Issued 26 Aug 2009Not complied with 11 Mar 2013Roof and outside the building§ 27-2005
Repair the roof so that it will not leak over ceiling at stairs bulkhead to roof at public hall, 6th story
Issued 26 Aug 2009Not complied with 11 Mar 2013Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the foyer, 4th story at north
Issued 11 Aug 2009First no access to re- inspect violation 19 Mar 2013Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at ceiling at stair bulkhead at public hall, 6th story
Issued 9 Aug 2009Not complied with 11 Mar 2013Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective fire retarded ceiling and walls at stair bulkhead at public hall, 6th story
Issued 9 Aug 2009Not complied with 11 Mar 2013Floors and stairs§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 4th room from north, 6th story at south
Issued 9 Aug 2009First no access to re- inspect violation 19 Mar 2013Walls and ceilings§ 27-2005
Arrange and make self-closing the doors hopper door 5th sty public hall, section ''d bldg'', at northeast
Issued 8 May 2002Not complied with 11 Mar 2013Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors, in the entrance, 5th story at east
Issued 29 Nov 2001First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2005 +1
Repair or replace the smoke detector missing 3 sty an apartment ms king., section '' ''
Issued 20 Sept 1999First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2045
Arrange and make self-closing the doors entrance to 2 sty an apartment., section '' ''
Issued 3 Feb 1999First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2005 +1
Abate the nuisance consisting of peeling paint on bathtub and ceramic wall tiles 3 sty northwest an apartment northeast bldg., section '' ''
Issued 21 Jul 1998First no access to re- inspect violation 19 Mar 2013Leaks and plumbing§ 27-2005 +1
Remove the illegal fastening double cylinder key lock installed on entrance door 6 sty an apartment., section '' ''
Issued 8 Jan 1998First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005 +1
Repair or replace the smoke detector which is missing 4 sty an apartment mr denitrkis., section '' ''
Issued 22 Nov 1991First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ 27-2045
Arrange and make self-closing the doors entrance to 2 sty an apartment unit a.
Issued 29 Dec 1988First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ D26-10.01 +1
Repair or replace the smoke detector defective 5 sty an apartment unit b mr gouck.
Issued 24 Oct 1986First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ D26-20.08
Repair or replace the smoke detector missing 5 sty an apartment mr pigkalla., section '' ''
Issued 24 Oct 1986First no access to re- inspect violation 19 Mar 2013Fire and safety equipment§ D26-20.08
Non-hazardous11 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Paint with light colored paint to the satisfaction of this department at east wall, public hall stairs to roof, 6th story
Issued 31 Oct 2019Notice certified late 25 Feb 2020Roof and outside the building§ 27-2013
Paint with light colored paint to the satisfaction of this department north wall at public hall, 1st story
Issued 15 Aug 2017Invalid certification 6 Sept 2017Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the north wall, east wall in the kitchen, 1st story at north
Issued 24 Jul 2017Invalid certification 9 Nov 2017Walls and ceilings§ 27-2013
Paint metal in accordance with dept. regulation the 1st door from east at south wall in the foyer, 1st story at north
Issued 24 Jul 2017Invalid certification 9 Nov 2017Doors and windows§ 27-2005
Paint with light colored paint to the satisfaction of this department the south wall, west wall in the foyer, 1st story at north
Issued 24 Jul 2017Invalid certification 9 Nov 2017Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east, 6th story
Issued 13 Jul 2017Notice sent out 16 Jul 2017Walls and ceilings§ 27-2005
Refit entrance door court
Issued 19 Sept 2011Not complied with 11 Mar 2013Doors and windows§ 27-2005
Refit door. bldg. d. in the entrance, 1st story at north
Issued 8 Apr 2011First no access to re- inspect violation 19 Mar 2013Doors and windows§ 27-2005
Admin code & dept. rules and regs. replace refuse chute warning sign public hall door to service closet or on wall over hopper door at all stys, section ''a bldg'', at southeast
Issued 8 May 2002Not complied with 11 Mar 2013Garbage and cleanliness§ 27-848
Admin code & dept. rules and regs. replace refuse chute warning sign public hall door to service closet or on wall over hopper door at all stys public hall, section ''b bldg'', at southwest
Issued 8 May 2002Not complied with 11 Mar 2013Garbage and cleanliness§ 27-848
Show all 11Show fewer
Admin code & dept. rules and regs. replace refuse chute warning sign public hall door to service closet or on wall over hopper door at all stys public hall, section ''c bldg'', at northwest
Issued 8 May 2002Not complied with 11 Mar 2013Garbage and cleanliness§ 27-848
Paperwork and notices1 open
The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Issued 24 Jul 2017Invalid certification 9 Nov 2017Paperwork and notices§ 27-2005
132 closed violations, plus 3 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Repair the roof so that it will not leak at ceiling in the 1st room from north, 6th story at north
Issued 19 May 2026Violation dismissed 7 Sept 2026Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north, 6th story at north
Issued 19 May 2026Violation dismissed 7 Sept 2026Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective wood floor under radiator unit in the 1st room from north, 6th story at north
Issued 19 May 2026Violation dismissed 7 Sept 2026Heat and hot water§ 27-2005
Trace and repair the source and abate the visible mold condition... less than 10 sqft. at east and south walls in the bathroom, 6th story at north
Issued 19 May 2026Violation dismissed 2 Sept 2026Mold and damp§ 27-2017.3
×2Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 6th story at north
2 issued 19 May 2026Violation dismissedFire and safety equipment§ 27-2045 +3
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 6th story at north
Issued 19 May 2026Violation dismissed 16 Aug 2026Fire and safety equipment§ 27-2005 +3
Properly secure the loose escutcheon plate at riser at ceiling in the bathroom, 6th story at north
Issued 19 May 2026Violation dismissed 16 Aug 2026Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, the private hallway, the 1st room from north, 1st story at north
Issued 2 Jan 2026Violation dismissed 3 May 2026Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer, 1st story at north
Issued 2 Jan 2026Violation dismissed 3 May 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall in the 2nd room from north at west, 1st story at north
Issued 2 Jan 2026Violation dismissed 3 May 2026Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective wood sub-floor in the 1st room from north, 1st story at north
Issued 2 Jan 2026Violation dismissed 14 Apr 2026Floors and stairs§ 27-2005
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 6 Apr 2025Pests§ 27-2017.4
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Doors and windows§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the kitchen, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at the ceiling, ceiling in the private hallway, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, north wall, west wall in the 3rd room from east at north, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the private hallway, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall in the 1st room from east, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation dismissed 25 Mar 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Issued 14 Dec 2024Violation dismissed 25 Mar 2025Doors and windows§ 27-2005
Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story
Issued 19 Dec 2024Violation dismissed 9 Mar 2025Heat and hot water§ 27-2033
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east, section ''b''
Issued 19 Dec 2024Violation dismissed 9 Mar 2025Heat and hot water§ 27-2031
Properly repair or replace the broken or defective glass pane at lower window sash at south wall at public hall, 1st story
Issued 14 Dec 2024Violation dismissed 9 Mar 2025Doors and windows§ 27-2005
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Issued 14 Dec 2024Violation dismissed 9 Mar 2025Fire and safety equipment§ 27-2005 +3
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, north wall in the private hallway, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.7 +2
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 2nd closet from north at east wall door frame, 1st window frame from east at south wall in the 3rd room from east at north, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from south at west wall in the kitchen, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east, 2nd story at east, section ''a''
Issued 21 Dec 2024Violation closed 21 Jan 2025Lead paint§ 27-2056.6
Repair or replace the smoke detector defective in the entire apartment, 3rd story at north, section ''a''
Issued 25 Apr 2024Violation dismissed 18 Aug 2024Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at north, section ''a''
Issued 25 Apr 2024Violation dismissed 18 Aug 2024Fire and safety equipment§ 27-2046.1
Provide ready access to buildings heating system boiler room door locked at basement story at boiler room
Issued 24 Feb 2024Violation dismissed 16 May 2024Heat and hot water§ 27-2033
Remove all encumbrances consisting of bicycles at bulkhead, 6th story, section ''b''
Issued 7 Jan 2024Violation dismissed 25 Apr 2024Fire and safety equipment§ 27-2005 +1
Provide ready access to buildings heating system locked at basement at boiler room
Issued 28 Jan 2024Violation dismissed 21 Apr 2024Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at east, section ''building-b''
Issued 28 Jan 2024Violation dismissed 18 Apr 2024Heat and hot water§ 27-2029
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east, section ''building-b''
Issued 28 Jan 2024Violation dismissed 18 Apr 2024Heat and hot water§ 27-2031
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at north, section ''b'', at southwest
Issued 24 Feb 2024Violation closed 18 Mar 2024Heat and hot water§ 27-2031
Replace or repair the self-closing doors that is missing or defective hinges at building entrance at public hall, 1st story
Issued 28 Jan 2024Violation closed 19 Feb 2024Fire and safety equipment§ 27-2005 +3
Remove device preventing door from being self-closing hook and eye installed at section c building entrance door, 1st story
Issued 25 Sept 2023Violation closed 13 Dec 2023Fire and safety equipment§ 27-2005 +1
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door, 1st story
Issued 25 Sept 2023Violation closed 13 Dec 2023Fire and safety equipment§ 27-2005 +3
Replace or repair the self-closing doors that is missing or defective building entrance door, 1st story, section ''c''
Issued 11 Oct 2023Violation closed 2 Nov 2023Fire and safety equipment§ 27-2005 +3
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 4 story balcony at west stack, center court
Issued 19 Apr 2023Violation dismissed 17 Aug 2023Fire and safety equipment§ 27-2005 +1
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 2 story balcony at east stack, center court
Issued 19 Apr 2023Violation dismissed 17 Aug 2023Fire and safety equipment§ 27-2005 +1
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner bracket protruding beyond window sill at 2 story balcony at south stack, center court
Issued 19 Apr 2023Violation dismissed 17 Aug 2023Fire and safety equipment§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color approx 1 sq ft at ceiling and north wall in the kitchen, 1st story at north, section ''b''
Issued 19 Apr 2023Violation dismissed 13 Jul 2023Walls and ceilings§ 27-2005
Repair or replace the smoke detector missing in the entire apartment, 1st story at north, section ''b''
Issued 19 Apr 2023Violation dismissed 13 Jul 2023Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at north, section ''b''
Issued 19 Apr 2023Violation dismissed 13 Jul 2023Fire and safety equipment§ 27-2046.1
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen, 1st story at north, section ''b''
Issued 19 Apr 2023Violation dismissed 13 Jul 2023Leaks and plumbing§ 27-2026
Provide ready access to buildings heating system door locked at basement at boiler room
Issued 31 Jan 2023Violation dismissed 25 Apr 2023Heat and hot water§ 27-2033
Provide hot water at all hot water fixtures in the kitchen, 2nd story at north
Issued 31 Jan 2023Violation dismissed 20 Apr 2023Heat and hot water§ 27-2031
2011, 2012 adm code cleanse and disinfect to the satisfaction of this department after removing the accumulation of card board boxes and recycling material at center court
Issued 8 Jan 2023Violation dismissed 9 Apr 2023Garbage and cleanliness§ 27-2010
Provide hot water at all hot water fixtures in the bathroom, 2nd story at east
Issued 11 Mar 2023Violation closed 4 Apr 2023Heat and hot water§ 27-2031
Arrange and make self-closing the doors at door. in the entrance, 2nd story at south, section ''b''
Issued 8 Nov 2021Violation dismissed 15 Feb 2022Fire and safety equipment§ 27-2005
Repair the roof so that it will not leak over ceiling in the 1st room from east, 6th story at west, section ''d''
Issued 29 Mar 2021Violation dismissed 18 Jul 2021Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west wall. in the 1st room from east, 6th story at west, section ''d''
Issued 29 Mar 2021Violation dismissed 18 Jul 2021Walls and ceilings§ 27-2005
Abate the nuisance consisting of lockable door knob assembly at door to the room with fire escape. in the 5th room from east, 6th story at west, section ''d''
Issued 29 Mar 2021Violation dismissed 20 Jun 2021Fire and safety equipment§ 27-2005 +1
Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at north, section ''d''
Issued 20 Dec 2020Violation closed 13 Jan 2021Heat and hot water§ 27-2029
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 2nd story at north
Issued 13 May 2018Violation dismissed 3 Sept 2018Walls and ceilings§ 27-2005
Remove all obstructions and repair all defects in bathtub drain clogged in the bathroom, 2nd story at north
Issued 13 May 2018Violation dismissed 3 Sept 2018Leaks and plumbing§ 27-2026
Replace with new the broken or defective upper and lower sash wire glasses at 1st floor to 2nd floor landing window, 1st story, section ''building-c''
Issued 12 Mar 2018Violation dismissed 1 Jul 2018Doors and windows§ 27-2005
Cleanse to the satisfaction of this department the floors, landing and stairs at public hall, 1st story
Issued 21 Dec 2017Violation dismissed 28 May 2018Floors and stairs§ 27-2011
Replace with new the missing install electrical child safty caps/covers to electrical outlet at north wall in south wall of public hall at public hall, 1st story
Issued 25 Nov 2017Violation dismissed 28 May 2018Electrical§ 27-2005
Replace with new the broken or defective wire glass at 1st window from north at east at public hall, 1st story
Issued 2 Aug 2017Violation closed 12 Mar 2018Doors and windows§ 27-2005
Provide an adequate supply of gas to the fixtures.. in the entire apartment, 1st story, section at northeast
Issued 12 Jun 2017Violation closed 23 Jan 2018§ 27-2070
Provide an adequate supply of gas to the fixtures at range in the kitchen, 6th story at north
Issued 11 Oct 2017Violation closed 13 Jan 2018Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures gas range in the kitchen, 4th story at west
Issued 5 May 2017Violation closed 13 Jan 2018Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures gas range in the kitchen, 3rd story at north
Issued 29 Mar 2017Violation closed 13 Jan 2018Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures gas stove in the kitchen, 2nd story at east
Issued 29 Mar 2017Violation closed 13 Jan 2018Appliances§ 27-2070
Properly repair the source and abate the evidence of a water leak ceiling. in the 1st living room from north at west, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 1st living room from north at west, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the kitchen, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 2ndroom from west, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Walls and ceilings§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire area of the center court
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Garbage and cleanliness§ 27-2010
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the bathroom, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Walls and ceilings§ 27-2005
Abate the nuisance consisting of mice in the entire apartment, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Pests§ 27-2018
Properly repair the broken or defective entrance door to apartment, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Doors and windows§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling in the 2ndroom from west, 5th story at west
Issued 5 Sept 2017Violation dismissed 3 Jan 2018Leaks and plumbing§ 27-2026
Provide an adequate supply of gas to the fixtures.. in the entire apartment, 1st story at north, section at southwest
Issued 8 Aug 2017Violation closed 20 Dec 2017§ 27-2070
Provide an adequate supply of gas to the fixtures gas stove in the kitchen, 2nd story at north
Issued 27 Jul 2017Violation closed 20 Dec 2017Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures at range in the kitchen, 1st story at north
Issued 24 Jul 2017Violation closed 20 Dec 2017Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures at range in the kitchen, 4th story at north
Issued 9 Apr 2017Violation closed 20 Dec 2017Appliances§ 27-2070
Provide an adequate supply of gas to the fixtures oven/range in the kitchen, 1st story at west, section ''c'', at northwest
Issued 22 Mar 2017Violation closed 20 Dec 2017Appliances§ 27-2070
Replace with new the broken or defective wire glass of the picture window at south/east at public hall, 1st story
Issued 19 Sept 2017Violation closed 3 Oct 2017Doors and windows§ 27-2005
Provide an adequate supply of gas to the fixtures.. in the entire apartment, 6th story
Issued 13 Jul 2017Violation closed 2 Oct 2017§ 27-2070
Provide an adequate supply of gas to the fixtures oven/range in the kitchen, 2nd story at east, section ''b'', at southwest
Issued 22 Mar 2017Violation closed 2 Oct 2017Appliances§ 27-2070
Properly repair the broken or defective fire escape west 2 window lower sash counter balances in the 1st room from north, 2nd story at south
Issued 15 May 2017Violation dismissed 10 Sept 2017Fire and safety equipment§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenette, 2nd story at south
Issued 15 May 2017Violation dismissed 10 Sept 2017Walls and ceilings§ 27-2005
Properly repair the broken or defective west 2 window lower sash counter balance in the 2nd room from north, 2nd story at south
Issued 15 May 2017Violation dismissed 10 Sept 2017Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom, 2nd story at south
Issued 15 May 2017Violation dismissed 10 Sept 2017Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north, 2nd story at south
Issued 15 May 2017Violation dismissed 10 Sept 2017Walls and ceilings§ 27-2005
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment, 1st story at east
Issued 17 May 2017Violation closed 1 Aug 2017Fire and safety equipment§ 27-2043.1
Provide an adequate supply of gas to the fixtures.. in the kitchen, 1st story at east
Issued 17 May 2017Violation closed 26 Jun 2017§ 27-2070
Refit closet door. in the private hallway, 1st story at west
Issued 27 Jan 2017Violation dismissed 29 May 2017Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the entire apartment, 1st story at west, section ''c section''
Issued 27 Jan 2017Violation dismissed 29 May 2017Walls and ceilings§ 27-2005
Abate the nuisance consisting of mice, 1st story at west
Issued 27 Jan 2017Violation dismissed 29 May 2017Pests§ 27-2018
Properly repair the source and abate the evidence of a water leak at ceiling. in the 3rd room from north at east, 1st story at west
Issued 27 Jan 2017Violation dismissed 29 May 2017Leaks and plumbing§ 27-2026
Showing the 100 most recent of 132.
224 violations on record in total, 89 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
103 complaints in three years, 32 of them in the last twelve months.
- Noise12 / 43
- Heat and hot water12 / 33
- Walls and ceilings4 / 7
- Pests0 / 6
- Construction and illegal work1 / 3
- Mold and damp1 / 2
- Elevator0 / 2
- Garbage and cleanliness1 / 2
- Fire and safety equipment1 / 2
- Leaks and plumbing0 / 1
- Cooking gas0 / 1
- Other0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
6 cases, all closed.
Heat and Hot Water
Opened 8 May 2024
Heat and Hot Water
Opened 21 Mar 2023
Tenant Action
Opened 23 Apr 2021
Tenant Action
Opened 11 Apr 2018
Access Warrant - Non-Lead
Opened 29 Dec 2017
False Certification Non-Lead
Opened 14 Dec 2009
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
- 20251 eviction
- 20191 eviction
- 20182 evictions
Filings
Public filingBuilding permits
No permit currently in force. 3 permits filed in the last five years.
Show 3 expired or finishedShow fewer
Boiler Equipment
REFILING OF JOB No. 421732771 FOR THE REPLACEMENT OF BOILER AND GAS/OIL BURNER WITH BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Issued 12 Aug 2022Expired 12 Aug 2023
Boiler Equipment
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Issued 12 Aug 2022Expired 12 Aug 2023
Plumbing
REFILING OF JOB No. 421732771 TO CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Issued 12 Aug 2022Expired 12 Aug 2023
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 7 earlier reportsShow fewer
- 20254 of 116 units reported infested (2023 report)
- 2023No infested units reported (2022 report)
- 20221 of 116 units reported infested (2021 report)
- 2021No infested units reported (2020 report)
- 20203 of 116 units reported infested (2019 report)
- 20193 of 116 units reported infested, 1 re-infested (2018 report)
- 20199 of 116 units reported infested (2017 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
GERMAN CACERES
Public records list GERMAN CACERES as the registered managing agent for this address as of 12 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (6 in the records we hold)
- 34-01 28 Avenue191 open violations · no reviews yet
- 21-38 31 Street186 open violations · no reviews yet
- 31-18 35 Street105 open violations · no reviews yet
Show 3 moreShow fewer
- 31-45 Crescent Street66 open violations · no reviews yet
- 25-81 34 Street48 open violations · no reviews yet
- 28-46 41 Street20 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
ONEOTA ASSOCIATES LLC
Public records list ONEOTA ASSOCIATES LLC as the owner of record for this address as of 12 Sept 2026. Source: HPD registration.
Other buildings listed under this owner (1 in the records we hold)
- 21-38 31 Street186 open violations · no reviews yet
No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
21-24 31 Street, Astoria, NY 11105
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 34 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There were 12 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
- There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 88 open housing violations: 34 immediately hazardous, 43 hazardous and 11 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (17), heat and hot water (12) and lead paint (12).
On 19 May 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 10 days, and HPD issued 1 heat violation.
City marshals carried out 4 residential evictions here since 2017. The record says nothing about why, and most follow a case for unpaid rent.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4008460042 · Block 846, Lot 42 · Building class D1
