21-45 23 Street, Astoria, NY 11105
Built 1928 · 4-story walk-up · 16 apartments
25 immediately hazardous violations open. 35 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 3525 · 9 · 1
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 3 | 0 |
| 2024 | 23 | 8 |
| 2025 | 25 | 7 |
| 2026 so far | 11 | 2 |
Plus 137 violations from 2013 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 17
- Walls and ceilings 13
- Lead paint 12
- Open per apartment
- 2.2 (35 open across 16 apartments)
- Inspector last found a problem
- 1 Oct 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 4 days, and inspectors issued 1 violation.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 4 | 4 | 1 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous25 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Issued 1 Oct 2026Not complied with 26 Oct 2026Fire and safety equipment§ 27-2005 +3
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 3rd story at east
Issued 7 May 2026Invalid certification 18 May 2026Leaks and plumbing§ 27-2026
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east
Issued 18 Nov 2025Invalid certification 5 Dec 2025Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 1st room from north, 2nd story at east
Issued 18 Nov 2025Notice sent out 18 Nov 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall, 1st window frame from north at east wall in the kitchen, 2nd story at east
Issued 18 Nov 2025Notice sent out 18 Nov 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, west wall in the kitchen, 2nd story at east
Issued 18 Nov 2025Notice sent out 18 Nov 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st window frame from north at east wall in the 1st room from north, 2nd story at east
Issued 18 Nov 2025Notice sent out 18 Nov 2025Lead paint§ 27-2056.6
Abate the infestation consisting of mice in the entire apartment, 2nd story at east
Issued 18 Nov 2025Invalid certification 5 Dec 2025Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 4th story at west
Issued 9 Aug 2025Not complied with 19 Sept 2025Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the foyer, 4th story at west
Issued 9 Aug 2025Notice sent out 10 Aug 2025Lead paint§ 27-2056.6
Show all 25Show fewer
Abate the nuisance consisting of lockable slide bolt with hasp and eye installed at gate at entrance to south fire passage way
Issued 5 Aug 2024Notice certified late 3 Sept 2024§ 27-2005 +1
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall in the private hallway, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from west at north wall in the kitchen, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Properly repair or replace the broken or defective locking device at vestibule door, 1st story
Issued 30 Jul 2024Notice certified late 23 Aug 2024Doors and windows§ 27-2005
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the 4th room from east, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 4th room from east, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead, 4th story
Issued 30 Jul 2024Notice certified late 23 Aug 2024Fire and safety equipment§ 27-2005 +3
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall, 2nd window frame from north at east wall in the 1st room from east, 4th story at north
Issued 30 Jul 2024Defect letter issued 17 Oct 2024Lead paint§ 27-2056.6
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Issued 26 Sept 2021Notice sent out 29 Sept 2021Lead paint§ 27-2056.4
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Issued 29 Jul 2021Notice sent out 19 Sept 2021Lead paint§ 27-2056.4 +1
Abate the infestation consisting of mice in the entire apartment, 4th story at west
Issued 9 Jul 2020Not complied with 5 Aug 2024Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 2nd story at west
Issued 22 Feb 2020Not complied with 5 Aug 2024Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 3rd story at east
Issued 22 Feb 2020Not complied with 5 Aug 2024Pests§ 27-2017.4
Hazardous9 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Repair the roof so that it will not leak at ceiling inside closet in the 1st room from north, 4th story at north
Issued 1 Oct 2026Notice sent out 4 Oct 2026Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside closet,north, east and south walls in the 1st room from north, 4th story at north
Issued 1 Oct 2026Notice sent out 4 Oct 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north, 4th story at north
Issued 1 Oct 2026Notice sent out 4 Oct 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the private hallway, 4th story at north
Issued 1 Oct 2026Notice sent out 4 Oct 2026Walls and ceilings§ 27-2005
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 4th story at west
Issued 9 Aug 2025Not complied with 27 Sept 2025Fire and safety equipment§ 27-2045 +2
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 4th story at west
Issued 9 Aug 2025Not complied with 27 Sept 2025Fire and safety equipment§ 27-2045 +3
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from north, 3rd story at south
Issued 13 Oct 2021Not complied with 5 Aug 2024Walls and ceilings§ 27-2005
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at north
Issued 26 Sept 2021Notice certified late 23 Jan 2022Lead paint§ 27-2056.7 +1
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north
Issued 26 Sept 2021Not complied with 30 Jul 2024Lead paint§ 27-2056.7 +1
Non-hazardous1 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Properly repair with similar material the broken or defective ceramic floor tiles under wash basin in the bathroom, 4th story at north
Issued 1 Oct 2026Notice sent out 4 Oct 2026Floors and stairs§ 27-2005
181 closed violations, plus 5 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Properly repair with similar material the broken or defective wood floor in the kitchen, 3rd story at east
Issued 7 May 2026Violation dismissed 20 Aug 2026Floors and stairs§ 27-2005
Paint metal in accordance with dept. regulation steam pipe riser in the kitchen, 3rd story at east
Issued 7 May 2026Violation dismissed 20 Aug 2026Heat and hot water§ 27-2005
Properly repair or replace the broken or defective lock assembly at door in the entrance, 3rd story at east
Issued 7 May 2026Violation dismissed 20 Aug 2026Doors and windows§ 27-2005
Properly repair or replace the broken or defective bell buzzer intercom in the entrance, 3rd story at east
Issued 7 May 2026Violation dismissed 20 Aug 2026Entry, buzzer and mail§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 3rd story at east
Issued 7 May 2026Violation dismissed 29 Jul 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 3rd story at east
Issued 7 May 2026Violation dismissed 29 Jul 2026Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, the bathroom, the 4th room from north, 2nd story at east
Issued 18 Nov 2025Violation dismissed 26 Apr 2026Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door, north wall, 1st closet from south at west wall door frame in the 1st room from north, 2nd story at east
Issued 18 Nov 2025Violation dismissed 26 Apr 2026Doors and windows§ 27-2013
×2Abate the infestation consisting of roaches in the entire apartment, 4th story at north
2 issued 30 Jul 2024 to 16 Oct 2025Violation dismissedPests§ 27-2017.4
×2Abate the infestation consisting of mice in the entire apartment, 4th story at north
2 issued 30 Jul 2024 to 16 Oct 2025Violation dismissedPests§ 27-2017.4
Properly repair or replace the broken or defective latch assembly at vestibule door at public hall, 1st story
Issued 17 Sept 2025Violation dismissed 7 Dec 2025Doors and windows§ 27-2005
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 4th story
Issued 17 Sept 2025Violation dismissed 7 Dec 2025Fire and safety equipment§ 27-2045 +3
Replace or repair the self-closing doors that is missing or defective latch assembly at vestibule door at public hall, 1st story
Issued 17 Sept 2025Violation closed 27 Sept 2025Fire and safety equipment§ 27-2005 +3
Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story
Issued 17 Sept 2025Violation closed 27 Sept 2025Fire and safety equipment§ 27-2005 +3
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at south, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from east at south, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Leaks and plumbing§ 27-2026
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the bathroom, the kitchen, the 2nd room from east at south, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling in the 2nd room from east at south, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Walls and ceilings§ 27-2005
×2Repair the roof so that it will not leak over ceiling ceiling in the 2nd room from east at south, 4th story at west
2 issued 9 Aug 2025Violation closedLeaks and plumbing§ 27-2005
Cleanse to the satisfaction of this department the the ceramic tiles surface with grouted joints of visible mold at east, south, west walls in the bathroom, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Mold and damp§ 27-2011
Paint with light colored paint to the satisfaction of this department at north wall, 1st closet from west at north wall door, south wall in the foyer, 4th story at west
Issued 9 Aug 2025Violation closed 27 Sept 2025Doors and windows§ 27-2013
Properly repair or replace the broken or defective upper and lower window sash spring balance at the window at east wall in the kitchen, 2nd story at east
Issued 8 Aug 2025Violation closed 27 Sept 2025Doors and windows§ 27-2005
Repair the leaky and/or defective faucets at the bathtub in the bathroom, 2nd story at east
Issued 8 Aug 2025Violation closed 27 Sept 2025Leaks and plumbing§ 27-2026
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 2nd story at east
Issued 8 Aug 2025Violation closed 27 Sept 2025Fire and safety equipment§ 27-2045 +2
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 2nd story at east
Issued 8 Aug 2025Violation closed 27 Sept 2025Fire and safety equipment§ 27-2045 +3
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen, 2nd story at east
Issued 8 Aug 2025Violation closed 27 Sept 2025Walls and ceilings§ 27-2013
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east
Issued 8 Aug 2025Violation closed 19 Sept 2025Pests§ 27-2017.4
Replace with new the missing garbage/ recycling can lids yard
Issued 3 Sept 2024Violation dismissed 19 Nov 2024Garbage and cleanliness§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage accumulation at fire passage way, 1st story
Issued 3 Sept 2024Violation dismissed 19 Nov 2024Garbage and cleanliness§ 27-2010
Abate the infestation consisting of rodents rats yard
Issued 3 Sept 2024Violation dismissed 19 Nov 2024Pests§ 27-2017.4
Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door, west wall in the 4th room from east, 4th story at north
Issued 30 Jul 2024Violation dismissed 19 Nov 2024Doors and windows§ 27-2013
Fire egress defective. remove the obstruction in fireproof passageway construction debri at south fire passage way
Issued 5 Aug 2024Violation dismissed 3 Nov 2024Fire and safety equipment§ 27-2005 +1
Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door, 2nd closet from east at south wall door in the private hallway, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Doors and windows§ 27-2013
×2Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment, 4th story at north
2 issued 14 Sept 2021 to 30 Jul 2024Violation dismissedFire and safety equipment§ 27-2043.1
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector missing in the entire apartment, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Fire and safety equipment§ 27-2045
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling in the 4th room from east, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Leaks and plumbing§ 27-2005
Paint with light colored paint to the satisfaction of this department at north wall in the kitchen, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department at east wall, 1st closet from east at south wall door, south wall, 1st door from south at west wall in the 1st room from east, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Doors and windows§ 27-2013
Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 1st room from east, 4th story at north
Issued 30 Jul 2024Violation dismissed 3 Nov 2024Heat and hot water§ 27-2005
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 4th story at north
Issued 30 Jul 2024Violation closed 8 Oct 2024Fire and safety equipment§ 27-2005 +3
Abate the infestation consisting of roaches in the entire apartment, 4th story at west
Issued 9 Jul 2020Violation closed 11 Sept 2024Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 3rd story at east
Issued 22 Feb 2020Violation closed 11 Sept 2024Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 2nd story at west
Issued 22 Feb 2020Violation closed 11 Sept 2024Pests§ 27-2017.4
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Issued 29 Feb 2024Violation closed 5 Aug 2024Super and management§ 27-2053
Paint with light colored paint to the satisfaction of this department all walls at public hall, 1st story
Issued 29 Feb 2024Violation closed 5 Aug 2024Walls and ceilings§ 27-2013
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment, 2nd story at north
Issued 17 Sept 2021Violation closed 5 Aug 2024Fire and safety equipment§ 27-2043.1
Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom, 2nd story at north
Issued 14 Sept 2021Violation closed 5 Aug 2024Leaks and plumbing§ 27-2026
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen, the bathroom, the foyer, the private hallway, the 1st room from north at east, the 1st room from north at west, 2nd story at north
Issued 8 Oct 2013Violation closed 5 Aug 2024Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color.. ceiling, east wall in the bathroom, 2nd story at west
Issued 10 Sept 2013Violation closed 5 Aug 2024Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color, south wall, ceiling, east wall in the bathroom, 2nd story at west
Issued 16 Jul 2013Violation closed 5 Aug 2024Walls and ceilings§ 27-2005
Replace or repair the self-closing doors that is missing or defective building entrance door hinges, 1st story
Issued 29 Feb 2024Violation closed 5 Jun 2024Fire and safety equipment§ 27-2005 +3
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at rear yard
Issued 19 Sept 2023Violation dismissed 10 Dec 2023Garbage and cleanliness§ 27-2010
Remove device preventing door from being self-closing consisting of stopper at building front entrance door (hook with eye), 1st story
Issued 19 Sept 2023Violation closed 6 Oct 2023Fire and safety equipment§ 27-2005 +1
Replace or repair the self-closing doors that is missing or defective building entrance door, 1st story
Issued 19 Sept 2023Violation closed 6 Oct 2023Fire and safety equipment§ 27-2005 +3
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at north
Issued 26 Sept 2021Violation closed 12 Apr 2022Lead paint§ 27-2056.7 +1
×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at north
2 issued 26 Sept 2021Violation closedLead paint§ 27-2056.7 +1
×2Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 2nd story at north
2 issued 20 May 2020 to 6 Oct 2021Violation dismissedWalls and ceilings§ 27-2005
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north
Issued 26 Sept 2021Violation closed 6 Mar 2022Lead paint§ 27-2056.7 +1
Properly repair with similar material the broken or defective vinyl tile floor. in the kitchen, 3rd story at south
Issued 13 Oct 2021Violation dismissed 13 Feb 2022Floors and stairs§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north, 3rd story at south
Issued 13 Oct 2021Violation dismissed 13 Feb 2022Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom, 3rd story at south
Issued 13 Oct 2021Violation dismissed 13 Feb 2022Walls and ceilings§ 27-2005
Properly repair the broken or defective counter balance lower window sash. in the 1st room from north at west, 4th story at north
Issued 13 Oct 2021Violation dismissed 2 Jan 2022Doors and windows§ 27-2005
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom, 2nd story at north
Issued 6 Oct 2021Violation closed 23 Nov 2021Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 2; wg to repair = 0; in the entire apartment, 4th story at west
Issued 9 Jul 2020Violation closed 13 Oct 2021Fire and safety equipment§ 27-2043.1
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south, 2nd story at west
Issued 2 Jan 2014Violation closed 15 Sept 2021Leaks and plumbing§ 27-2026
Arrange and make self-closing the doors at entrance in the foyer, 2nd story at west
Issued 2 Jan 2014Violation closed 15 Sept 2021Fire and safety equipment§ 27-2005
Repair or replace the smoke detector defective, 2nd story at west
Issued 2 Jan 2014Violation closed 15 Sept 2021Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). defective, 2nd story at west
Issued 2 Jan 2014Violation closed 15 Sept 2021Fire and safety equipment§ 27-2046.1
Repair the broken or defective connection at sink waste line in the kitchen, 2nd story at west
Issued 2 Jan 2014Violation closed 15 Sept 2021Leaks and plumbing§ 27-2026
Refit door in the entrance, 2nd story at north
Issued 8 Oct 2013Violation closed 15 Sept 2021Doors and windows§ 27-2005
Paint metal in accordance with dept. regulation.. 1st radiator from west at north wall in the 2nd room from east at south, 2nd story at west
Issued 10 Sept 2013Violation closed 15 Sept 2021Heat and hot water§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, the kitchen, the foyer, the 2nd room from east at north, 2nd story at west
Issued 10 Sept 2013Violation closed 15 Sept 2021Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department.. 1st window frame from south at west wall, 1st door from north at east wall in the 2nd room from east at south, 2nd story at west
Issued 10 Sept 2013Violation closed 15 Sept 2021Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen, the foyer, the private hallway, the 2nd room from east at south, the 2nd room from east at north, 2nd story at west
Issued 16 Jul 2013Violation closed 15 Sept 2021Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective fire retardant plaster at ceiling & east wall at bulkhead, roof.
Issued 19 May 2021Violation will be reinspected 2 Sept 2021Roof and outside the building§ 27-2005
Paint with light colored paint to the satisfaction of this department ceiling & east wall at bulkhead, roof.
Issued 19 May 2021Violation will be reinspected 2 Sept 2021Roof and outside the building§ 27-2013
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 3rd story at north
Issued 1 Mar 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 2nd story
Issued 1 Mar 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 3rd story
Issued 1 Mar 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment,, in the entire apartment, 1st story at north
Issued 1 Mar 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment,, in the entire apartment, 4th story at west
Issued 1 Mar 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.8
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Issued 22 Feb 2020Violation closed 1 Mar 2021Lead paint§ 27-2056.4
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Issued 19 Dec 2019Violation closed 1 Mar 2021Lead paint§ 27-2056.7
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen, 2nd story at west
Issued 20 May 2020Violation dismissed 10 Sept 2020Walls and ceilings§ 27-2013
Paint metal in accordance with dept. regulation the ceiling, 1st riser from west at north wall, 1st door from east at south wall in the 4th room from east, 3rd story at north
Issued 1 Mar 2020Violation dismissed 30 Aug 2020Doors and windows§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the bathroom, 3rd story at north
Issued 1 Mar 2020Violation dismissed 30 Aug 2020Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen, the 1st room from north at west, 1st story at north
Issued 1 Mar 2020Violation dismissed 30 Aug 2020Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall in the 4th room from east, 3rd story at north
Issued 1 Mar 2020Violation dismissed 30 Aug 2020Walls and ceilings§ 27-2005
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east
Issued 28 May 2020Violation dismissed 26 Aug 2020Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 2nd story at east
Issued 28 May 2020Violation dismissed 26 Aug 2020Pests§ 27-2017.4
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom, 3rd story at west
Issued 20 May 2020Violation dismissed 26 Aug 2020Leaks and plumbing§ 27-2026
Showing the 100 most recent of 181.
221 violations on record in total, 35 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
47 complaints in three years, 17 of them in the last twelve months.
- Walls and ceilings4 / 10
- Pests0 / 9
- Leaks and plumbing3 / 7
- Heat and hot water1 / 5
- Doors and windows2 / 4
- Mold and damp0 / 3
- Construction and illegal work2 / 3
- Floors and stairs2 / 2
- Entry, buzzer and mail2 / 2
- Garbage and cleanliness0 / 1
- Electrical1 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case pending, 2 closed.
ComprehensivePending
Opened 12 Aug 2020
Heat and Hot Water
Opened 16 Apr 2014
Tenant Action
Opened 23 Jan 2014
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No permit currently in force. 1 permit filed in the last five years.
Show 1 expired or finishedShow fewer
Boiler Equipment
Replacement of existing oil-fired heating boiler and burner with new oil-fired heating boiler and burner. No change use, occupancy or egress
Issued 23 May 2022Expired 31 May 2022
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2026No infested units reported (2024 report)
Show 8 earlier reportsShow fewer
- 2025No infested units reported (2024 report)
- 2024No infested units reported (2023 report)
- 2023No infested units reported (2022 report)
- 2023No infested units reported (2021 report)
- 20211 of 16 units reported infested (2020 report)
- 20201 of 16 units reported infested (2019 report)
- 20192 of 16 units reported infested (2018 report)
- 20192 of 16 units reported infested (2017 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
N/A
Public records list N/A as the registered managing agent for this address as of 19 Jul 2026. Source: HPD registration.
Other buildings listed under this agent (7 in the records we hold)
- 41-11 28 Avenue11 open violations · no reviews yet
- 182 Irving Avenue5 open violations · no reviews yet
- 44-13 28 Avenue4 open violations · no reviews yet
Show 4 moreShow fewer
- 126 Irving Avenueno open violations · no reviews yet
- 1646 Dekalb Avenueno open violations · no reviews yet
- 30-34 49 Streetno open violations · no reviews yet
- 31-31 47 Streetno open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
21-45 23RD STREET LLC
Public records list 21-45 23RD STREET LLC as the owner of record for this address as of 19 Jul 2026. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
21-45 23 Street, Astoria, NY 11105
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 25 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- HPD has 1 case pending against the owner in Housing Court (comprehensive). Ask what it is about and whether the work has been done.
- The city recorded 1 mould violation here, most recently in 2025, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 35 open housing violations: 25 immediately hazardous, 9 hazardous and 1 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (17), walls and ceilings (13) and lead paint (12).
On 1 Oct 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 4 days, and HPD issued 1 heat violation.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4008790015 · Block 879, Lot 15 · Building class C1
