ByTenantsByTenants home

32-85 33 Street, Astoria, NY 11106

Built 1929 · 6-story elevator building · 48 apartments

1 immediately hazardous violation open. 4 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
41 · 3
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202300
202451
2025200
2026 so far00

Plus 49 violations from 2010 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 13
  • Doors and windows 5
  • Roof and outside the building 2
Open per apartment
less than 0.1 (4 open across 48 apartments)
Inspector last found a problem
14 Nov 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 5 days, and inspectors issued 2 violations.

WinterDaysComplaintsViolations
2025–26572

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous1 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Remove the illegal fastening consisting of slide bolt with eye capable of being padlocked at fire door leading to rear yard at public hall, 1st story

    Issued 26 Nov 2024Not complied with 14 Jan 2025Roof and outside the building§ 27-2005 +1

Hazardous3 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair or replace the broken or defective riser at 6th tread from bottom at public hall stairs, 4th story

    Issued 26 Feb 2025Notice sent out 2 Mar 2025Floors and stairs§ 27-2005

  • Remove all encumbrances consisting of ladder at public hall stairs leading to bulkhead, 6th story

    Issued 26 Feb 2025Notice sent out 2 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective cement floor at vestibule area, 1st story

    Issued 26 Feb 2025Notice sent out 2 Mar 2025Floors and stairs§ 27-2005

71 closed violations

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west

    Issued 14 Nov 2025Violation dismissed 29 Jan 2026Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system locked door at basement at boiler room

    Issued 14 Nov 2025Violation dismissed 29 Jan 2026Heat and hot water§ 27-2033

  • Remove device preventing door from being self-closing kick down door stopper installed at exit door at west at basement

    Issued 14 Nov 2025Violation closed 16 Jan 2026Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges and latch set at laundry room door at basement story at public hall

    Issued 23 Jun 2025Violation closed 16 Jan 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to rear yard at public hall, 1st story

    Issued 26 Nov 2024Violation closed 28 Oct 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinge at yard door east wall at public hall, 1st story

    Issued 15 Nov 2024Violation closed 28 Oct 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at compactor door south wall at public hall, 1st story

    Issued 15 Nov 2024Violation closed 28 Oct 2025Fire and safety equipment§ 27-2005 +3

  • Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Issued 23 Jun 2025Violation dismissed 7 Oct 2025Garbage and cleanliness§ 27-2021

  • Properly repair or replace the broken or defective latch set at laundry room door at basement story at public hall

    Issued 23 Jun 2025Violation dismissed 24 Sept 2025Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges at recycling room door at basement story at public hall

    Issued 23 Jun 2025Violation closed 19 Jul 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at compactor door at public hall, 4th story

    Issued 6 Jan 2025Violation closed 15 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at compactor door at public hall, 6th story

    Issued 6 Jan 2025Violation closed 15 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Fire escape defective. properly secure 3rd tread from bottom at 4th story balcony at building front at north at fire escape

    Issued 26 Feb 2025Violation closed 22 May 2025Fire and safety equipment§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective latch at compactor closet at public hall, 1st story

    Issued 14 Jan 2025Violation closed 22 May 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at compactor door at public hall, 1st story

    Issued 6 Jan 2025Violation closed 22 May 2025Fire and safety equipment§ 27-2005 +3

  • And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconys all stories front of the building at fire escape

    Issued 15 Nov 2024Violation dismissed 13 Apr 2025Fire and safety equipment§ 27-2014

  • Remove the illegal fastening consisting of lockable slidebolt installed at door to north yard at public hall, 1st story

    Issued 14 Jan 2025Violation dismissed 3 Apr 2025Roof and outside the building§ 27-2005 +1

  • Properly repair or replace the broken or defective latch at compactor closet at public hall, 1st story

    Issued 14 Jan 2025Violation dismissed 3 Apr 2025§ 27-2005

  • Properly repair or replace the broken or defective latch set at compactor door at public hall, 4th story

    Issued 6 Jan 2025Violation dismissed 3 Apr 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch set at compactor door at public hall, 6th story

    Issued 6 Jan 2025Violation dismissed 3 Apr 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch set at compactor door at public hall, 1st story

    Issued 6 Jan 2025Violation dismissed 3 Apr 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch at compactor door south wall at public hall, 1st story

    Issued 15 Nov 2024Violation dismissed 19 Feb 2025Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant plaster on east wall at vestibule hallway, 1st story

    Issued 24 Mar 2020Violation closed 8 Sept 2021Walls and ceilings§ 27-2005

  • Properly repair the broken or defective inoperative intercom system in the entrance, 2nd story at west

    Issued 24 Mar 2020Violation closed 18 Apr 2021Entry, buzzer and mail§ 27-2005

  • Paint with light colored paint to the satisfaction of this department east wall at vestibule hallway, 1st story

    Issued 24 Mar 2020Violation closed 18 Apr 2021Walls and ceilings§ 27-2013

  • Repair or replace the carbon monoxide detecting device(s). defective, 2nd story at west

    Issued 24 Mar 2020Violation closed 18 Apr 2021Fire and safety equipment§ 27-2046.1

  • Properly repair the broken or defective light fixture at ceiling in the kitchen, 6th story at west

    Issued 3 Jan 2020Violation closed 18 Apr 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective vinyl tile on floor in the kitchen, 6th story at west

    Issued 3 Jan 2020Violation closed 18 Apr 2021Floors and stairs§ 27-2005

  • Remove the illegal double cylinder key operated locking device at door.. in the entrance, 2nd story at west

    Issued 2 Nov 2019Violation closed 18 Apr 2021Doors and windows§ 27-2005

  • Provide an adequate supply of gas to the fixtures at gas range in the kitchen, 5th story at east

    Issued 2 Nov 2019Violation closed 18 Apr 2021Appliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures gas range, 4th story

    Issued 26 Feb 2020Violation closed 9 Jun 2020Appliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures at gas stove in the kitchen, 1st story at west

    Issued 2 Mar 2020Violation closed 27 May 2020Appliances§ 27-2070

  • ×2Provide an adequate supply of gas to the fixtures at range in the kitchen, 1st story at east

    2 issued 9 Mar 2020Violation closedAppliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures gas range, 5th story

    Issued 26 Feb 2020Violation closed 12 May 2020Appliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures at stove in the kitchen, 6th story at west

    Issued 3 Jan 2020Violation closed 12 May 2020Appliances§ 27-2070

  • ×2Provide an adequate supply of gas to the fixtures at gas range in the kitchen, 2nd story at west

    2 issued 2 Nov 2019 to 24 Mar 2020Violation closedAppliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures at gas range in the kitchen, 6th story at west

    Issued 2 Nov 2019Violation closed 12 May 2020Appliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures at gas range in the entire apartment, 4th story at east

    Issued 2 Nov 2019Violation closed 12 May 2020Appliances§ 27-2070

  • Properly repair the broken or defective window lower sash south window in the bedroom, 3rd story

    Issued 17 Dec 2012Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bedroom, 3rd story

    Issued 17 Dec 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the nuisance consisting of mold... north wall approx 8 sq. ft. east wall approx 6 sq. ft. in the bathroom, 3rd story at west

    Issued 22 Jun 2012Violation closed 2 Dec 2013Mold and damp§ 27-2005

  • Paint with light colored paint to the satisfaction of this department walls and ceiling in the foyer, 3rd story at west

    Issued 22 Jun 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom, 3rd story at west

    Issued 22 Jun 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom, 3rd story at west

    Issued 22 Jun 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood frame at front entrance door, 3rd story at west

    Issued 16 May 2012Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Trace and repair the source and abate the nuisance consisting of mold... & mildew at west wall in the bathroom, 3rd story at west

    Issued 16 May 2012Violation closed 2 Dec 2013Mold and damp§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom, 3rd story at west

    Issued 16 May 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom, 3rd story at west

    Issued 16 May 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department walls & ceiling in the private hallway, 3rd story at west

    Issued 16 May 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2013

  • Replace with new the missing light switch pull-chain in the bathroom, 3rd story

    Issued 9 Apr 2012Violation closed 2 Dec 2013§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet bowl in the bathroom, 3rd story

    Issued 9 Apr 2012Violation closed 2 Dec 2013§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom, 3rd story

    Issued 9 Apr 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective door jam lock-side. in the entrance, 3rd story

    Issued 9 Apr 2012Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Abate the nuisance consisting of roaches in the entire apartment, 3rd story

    Issued 9 Apr 2012Violation closed 2 Dec 2013Pests§ 27-2018

  • Abate the nuisance consisting of roaches in the entire apartment, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Pests§ 27-2018

  • Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the nuisance consisting of mold... mildew at ceiling in the bathroom, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Mold and damp§ 27-2005

  • Properly repair the broken or defective door frame in the entrance, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Properly repair the broken or defective light fixture at ceiling in the bathroom, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet.. in the bathroom, 3rd story at west

    Issued 21 Mar 2012Violation closed 2 Dec 2013§ 27-2026

  • Properly repair with similar material the broken or defective wood frame at door in the entrance, 3rd story

    Issued 24 Jan 2012Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Trace and repair the source and abate the nuisance consisting of mold... walls in the bathroom, 3rd story

    Issued 24 Jan 2012Violation closed 2 Dec 2013Mold and damp§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet flushometer in the bathroom, 3rd story

    Issued 24 Jan 2012Violation closed 2 Dec 2013§ 27-2026

  • Properly repair the broken or defective jamb at entrance door (lock side), 3rd story at east

    Issued 22 Nov 2011Violation closed 2 Dec 2013Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom, 3rd story at west

    Issued 18 Aug 2010Violation closed 2 Dec 2013Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment, 2nd story at east

    Issued 22 Jun 2012Violation dismissed 25 Oct 2012Walls and ceilings§ 27-2013

  • Properly repair the broken or defective locking device on door in the 1st room from east at south, 2nd story at east

    Issued 22 Jun 2012Violation dismissed 25 Oct 2012Doors and windows§ 27-2005

  • Properly repair the broken or defective locking device on door in the bathroom, 2nd story at east

    Issued 22 Jun 2012Violation dismissed 25 Oct 2012Doors and windows§ 27-2005

75 violations on record in total, 4 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

25 complaints in three years, 8 of them in the last twelve months.

  • Heat and hot water7 / 18
  • Entry, buzzer and mail1 / 2
  • Leaks and plumbing0 / 2
  • Garbage and cleanliness0 / 1
  • Doors and windows0 / 1
  • Noise0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 7 earlier reports
  • 2024No infested units reported (2023 report)
  • 2024No infested units reported (2022 report)
  • 2022No infested units reported (2021 report)
  • 2022No infested units reported (2020 report)
  • 2020No infested units reported (2019 report)
  • 2019No infested units reported (2018 report)
  • 2018No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    BELL REALTY

    Public records list BELL REALTY as the registered managing agent for this address as of 8 Sept 2026. Source: HPD registration.

    Other buildings listed under this agent (5 in the records we hold)

    Show 2 more

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    32-85 ASTORIA LLC

    Public records list 32-85 ASTORIA LLC as the owner of record for this address as of 8 Sept 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has one open immediately-hazardous violation on this building. Ask which apartment it concerns, whether it has been corrected, and when HPD re-inspects.
  2. There were 7 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. The city recorded 4 mould violations here, most recently in 2012, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4006210001 · Block 621, Lot 1 · Building class D1