1412 Dekalb Avenue, Brooklyn, NY 11237
Built 1931 · 3-story walk-up · 6 apartments
16 immediately hazardous violations open. 19 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 1916 · 2 · 1
- Public record
- Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 2 | 0 |
| 2024 | 30 | 8 |
| 2025 | 1 | 0 |
| 2026 so far | 0 | 0 |
Plus 49 violations from 1986 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Walls and ceilings 11
- Leaks and plumbing 5
- Fire and safety equipment 5
- Open per apartment
- 3.2 (19 open across 6 apartments)
- Inspector last found a problem
- 8 Oct 2025 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 2 days.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 2 | 2 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous16 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 1st story at north
Issued 10 Jan 2021Notice sent out 11 Jan 2021Lead paint§ 27-2056.8
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 1st story at south
Issued 10 Jan 2021Notice sent out 11 Jan 2021Lead paint§ 27-2056.8
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Issued 16 Nov 2020Notice sent out 17 Nov 2020Lead paint§ 27-2056.4
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Issued 27 Jul 2020Notice sent out 14 Sept 2020Lead paint§ 27-2056.4 +1
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner
Issued 7 May 2019Notice sent out 23 Jun 2019§ 27-2056.7
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 3rd closet from east at south wall door, 1st door frame from east at south wall in the 2nd room from east, 1st story at north
Issued 24 Apr 2019Defect letter issued 10 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen, 1st story at north
Issued 24 Apr 2019Defect letter issued 10 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen, 3rd story at east
Issued 12 Oct 2013Defect letter issued 3 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north, 3rd story at east
Issued 12 Oct 2013Defect letter issued 3 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east, 3rd story at south
Issued 18 Jul 2013Defect letter issued 3 Jun 2025Lead paint§ 27-2056.6
Show all 16Show fewer
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east, 3rd story at south
Issued 18 Jul 2013Defect letter issued 3 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from north at east, 1st story at east
Issued 11 Aug 2008Defect letter issued 10 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd door from west at north wall in the 3rd room from north, 1st story at east
Issued 11 Aug 2008Defect letter issued 10 Jun 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north, 1st story at east
Issued 11 Aug 2008Defect letter issued 10 Jun 2025Lead paint§ 27-2056.6
Remove or cover in a manner approved by the department the peeling lead paint west wall 2 sty west an apartment front room nancy rivera.
Issued 13 Sept 1988Defect letter issued 3 Jun 2025Lead paint§ 27-2013
Remove or cover in a manner approved by the department the peeling lead paint walls 3 sty east an apartment bathroom minerva baez 919 8055., section '' ''
Issued 13 Sept 1988Defect letter issued 3 Jun 2025Lead paint§ 27-2013
Hazardous2 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Trace and repair the source and abate the visible mold condition... less than 10sq feet at east wall and ceiling at public hall, 3rd story original violation 17166167 issued 01-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 1 Aug 2024First no access to re- inspect violation 30 Jun 2025Mold and damp§ 27-2017.3
Properly repair the broken or defective wood floor in the kitchen, 1st story at north
Issued 24 Apr 2019Not complied with 10 Jun 2025Floors and stairs§ 27-2005
Non-hazardous1 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Properly repair the broken or defective lock at door vestibule 1 sty public hall
Issued 26 Oct 1989Not complied with 3 Jun 2025Doors and windows§ 27-2005
71 closed violations, plus 20 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Provide recycling bins
Issued 8 Oct 2025Violation dismissed 4 Feb 2026Garbage and cleanliness§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story
Issued 24 Apr 2019Violation closed 10 Jun 2025Fire and safety equipment§ 27-2046.1
Cleanse to the satisfaction of this department the mold at east wall 2 sq ft in the bathroom, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Mold and damp§ 27-2011
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 2nd room from east, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Doors and windows§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 2nd room from east, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Walls and ceilings§ 27-2005
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the kitchen, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Heat and hot water§ 27-2005
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, 1st door from east at south wall in the kitchen, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Doors and windows§ 27-2013
Repair or replace the smoke detector missing in the entire apartment, 1st story
Issued 24 Apr 2019Violation closed 10 Jun 2025Fire and safety equipment§ 27-2045
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the bathroom, 1st story at north
Issued 24 Apr 2019Violation closed 10 Jun 2025Walls and ceilings§ 27-2005
Replace with new the missing knob & lock assembly entrance door 3 sty west an apartment bathroom.
Issued 13 Sept 1988Violation closed 10 Jun 2025Doors and windows§ 27-2005
Replace with new the broken or defective glass french door 3 sty west an apartment 2 room from front.
Issued 13 Sept 1988Violation closed 10 Jun 2025Doors and windows§ 27-2005
Replace or repair the self-closing the doors that is missing or defective entrance 3 sty west an apartment.
Issued 13 Sept 1988Violation closed 10 Jun 2025Fire and safety equipment§ 27-2044
Refit door entrance 3 sty west an apartment.
Issued 13 Sept 1988Violation closed 10 Jun 2025Doors and windows§ 27-2005
Abate the nuisance consisting of vermin mice & roaches 3 sty west an apartment thru out.
Issued 13 Sept 1988Violation closed 10 Jun 2025Pests§ 27-2018
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 1 sty an apartment., section '' ''
Issued 21 Aug 1987Violation closed 10 Jun 2025Fire and safety equipment§ D26-20.08 +1
Abate the nuisance consisting of double cylinder key operated lock installed entrance 1 sty an apartment., section '' ''
Issued 21 Aug 1987Violation closed 10 Jun 2025§ D26-10.01 +1
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Issued 1 Aug 2024Violation closed 3 Jun 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Issued 1 Aug 2024Violation closed 3 Jun 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the east wall and south wall at public hall, 1st story
Issued 1 Aug 2024Violation closed 3 Jun 2025Walls and ceilings§ 27-2013
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Issued 1 Aug 2024Violation closed 3 Jun 2025Super and management§ 27-2053
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at east
Issued 10 Jul 2024Violation closed 3 Jun 2025Fire and safety equipment§ 27-2005 +3
Properly repair and abate unsafe electric wiring condition consisting of extension cord running from the elecrical outlet at the 2nd floor ceiling to the 3rd floor ceiling at public hall, 2nd story
Issued 19 Jul 2019Violation closed 3 Jun 2025Electrical§ 27-2005
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes the airconditioner installed at fire escape window in the kitchen, 3rd story at south
Issued 18 Jul 2013Violation closed 3 Jun 2025Fire and safety equipment§ 27-2005 +1
Repair or replace the smoke detector missing, 3rd story at south
Issued 18 Jul 2013Violation closed 3 Jun 2025Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). missing, 3rd story at south
Issued 18 Jul 2013Violation closed 3 Jun 2025Fire and safety equipment§ 27-2046.1
Repair the roof so that it will not leak ceiling over 3 sty. at public hall
Issued 11 Aug 2008Violation closed 3 Jun 2025Leaks and plumbing§ 27-2005
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty north an apartment.
Issued 26 Oct 1989Violation closed 3 Jun 2025Fire and safety equipment§ 27-2045 +1
Abate the nuisance consisting of double cylinder key operated lock entrance door 2 sty right an apartment., section '' ''
Issued 9 Mar 1988Violation closed 3 Jun 2025Doors and windows§ 27-2005 +1
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling 2 sty an apartment kitchen., section '' ''
Issued 3 Sept 1987Violation closed 3 Jun 2025Walls and ceilings§ 300
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door 1 sty west apartment
Issued 21 May 1986Violation closed 3 Jun 2025Doors and windows§ D26-20.01
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at east wall at public hall, 3rd story original violation 17254894 issued 03-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 3 Sept 2024Violation dismissed 30 Apr 2025Mold and damp§ 27-2017.3
Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 1st story
Issued 3 Sept 2024Violation dismissed 2 Mar 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the east wall at public hall, 3rd story
Issued 3 Sept 2024Violation dismissed 2 Mar 2025Walls and ceilings§ 27-2013
Remove all encumbrances consisting of gas stove at public hall, 1st story
Issued 16 Sept 2024Violation dismissed 12 Jan 2025Fire and safety equipment§ 27-2005 +1
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at east wall at public hall, 3rd story
Issued 3 Sept 2024Violation closed 6 Jan 2025Mold and damp§ 27-2017.3
×2Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story
2 issued 1 Aug 2024 to 3 Sept 2024Violation dismissedWalls and ceilings§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st story
Issued 3 Sept 2024Violation dismissed 5 Jan 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak the east wall at public hall, 1st story
Issued 3 Sept 2024Violation dismissed 5 Jan 2025Leaks and plumbing§ 27-2026
×2Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
2 issued 1 Aug 2024 to 3 Sept 2024Violation dismissedWalls and ceilings§ 27-2005
×2Properly repair the source and abate the evidence of a water leak at east wall at public hall, 3rd story
2 issued 1 Aug 2024 to 3 Sept 2024Violation dismissedLeaks and plumbing§ 27-2026
×2Provide approved metal screen below skylight at roof
2 issued 1 Aug 2024 to 3 Sept 2024Violation dismissedRoof and outside the building§ 27-2005
Trace and repair the source and abate the visible mold condition... less than 10sq feet at east wall and ceiling at public hall, 3rd story
Issued 1 Aug 2024Violation closed 2 Dec 2024Mold and damp§ 27-2017.3
Properly repair or replace the broken or defective glass at skylight at roof
Issued 3 Sept 2024Violation dismissed 26 Nov 2024Roof and outside the building§ 27-2005
Abate the nuisance consisting of gas range with door attached at public hall, 1st story
Issued 3 Sept 2024Violation dismissed 26 Nov 2024Appliances§ 27-2005 +1
Properly repair or replace the broken or defective locking mechanism at door at vestibule, 1st story
Issued 3 Sept 2024Violation dismissed 26 Nov 2024Doors and windows§ 27-2005
Properly repair or replace the broken or defective locking mechanism at door at building front at public hall, 1st story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Doors and windows§ 27-2005
Remove all encumbrances consisting of household items at public hall, 3rd story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective vinyl tile floor at public hall, 1st story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Floors and stairs§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Leaks and plumbing§ 27-2026
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Issued 1 Aug 2024Violation dismissed 26 Nov 2024Walls and ceilings§ 27-2005
Remove device preventing door from being self-closing metal wire at vestibule door at public hall, 1st story
Issued 16 Sept 2024Violation closed 19 Nov 2024Fire and safety equipment§ 27-2005 +1
Remove device preventing door from being self-closing rope at entrance door at public hall, 1st story
Issued 16 Sept 2024Violation closed 19 Nov 2024Fire and safety equipment§ 27-2005 +1
Abate the infestation consisting of roaches in the entire apartment, 1st story at east
Issued 10 Jul 2024Violation dismissed 22 Oct 2024Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 1st story at east
Issued 10 Jul 2024Violation dismissed 22 Oct 2024Pests§ 27-2017.4
Properly repair or replace the broken or defective glass at skylight at roof
Issued 1 Aug 2024Violation closed 15 Oct 2024Roof and outside the building§ 27-2005
×2Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
2 issued 1 Aug 2024 to 5 Aug 2024Violation closedHeat and hot water§ 27-2033
Replace with new the missing 1 baluster at public hall stairs, 1st story
Issued 27 Mar 2023Violation dismissed 21 Jun 2023Floors and stairs§ 27-2005
Replace with new the missing 2 balusters at public hall, 2nd story
Issued 27 Mar 2023Violation dismissed 21 Jun 2023§ 27-2005
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the kitchen, 1st story at north
Issued 24 Apr 2019Violation closed 26 Jun 2019Fire and safety equipment§ 27-2043.1
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from east, 3rd story at south
Issued 18 Jul 2013Violation dismissed 14 Oct 2013Doors and windows§ 27-2013
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1;, 3rd story at south
Issued 18 Jul 2013Violation dismissed 14 Oct 2013Fire and safety equipment§ 27-2043.1
Abate the nuisance consisting of mice, 3rd story at south
Issued 18 Jul 2013Violation closed 1 Oct 2013Pests§ 27-2018
Remove the illegal fastening lockable slidebolt installed at apartment entrance door in the kitchen, 3rd story at south
Issued 18 Jul 2013Violation closed 1 Oct 2013Doors and windows§ 27-2005 +1
110 violations on record in total, 19 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
32 complaints in three years, 17 of them in the last twelve months.
- Doors and windows6 / 8
- Leaks and plumbing2 / 4
- Fire and safety equipment1 / 3
- Heat and hot water2 / 3
- Pests2 / 3
- Garbage and cleanliness0 / 2
- Walls and ceilings0 / 2
- Floors and stairs0 / 1
- Appliances0 / 1
- Roof and outside the building1 / 1
- Construction and illegal work1 / 1
- Entry, buzzer and mail0 / 1
- Paperwork and notices1 / 1
- Mold and damp1 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
No HPD Housing Court cases on record for this building.
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
- 20232 evictions
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 5 earlier reportsShow fewer
- 2024No infested units reported (2023 report)
- 2024No infested units reported (2022 report)
- 2023No infested units reported (2022 report)
- 2022No infested units reported (2021 report)
- 2020No infested units reported (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
DEODAT LOWTAN
Public records list DEODAT LOWTAN as the registered managing agent for this address as of 10 Jul 2025. Source: HPD registration.
Other buildings listed under this agent (24 in the records we hold, 10 shown)
- 840 Hart Street77 open violations · no reviews yet
- 309 Palmetto Street46 open violations · no reviews yet
- 282 Himrod Street45 open violations · no reviews yet
Show 7 moreShow fewer
- 191 Stanhope Street41 open violations · no reviews yet
- 152 Grattan Street31 open violations · no reviews yet
- 336 Starr Street29 open violations · no reviews yet
- 1567 Dekalb Avenue28 open violations · no reviews yet
- 338 Starr Street27 open violations · no reviews yet
- 241 Stockholm Street25 open violations · no reviews yet
- 315 Jefferson Street23 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
1412 DEKALB LLC
Public records list 1412 DEKALB LLC as the owner of record for this address as of 10 Jul 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
1412 Dekalb Avenue, Brooklyn, NY 11237
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 16 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There were 2 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- This building dates from 1931 and has 15 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 19 open housing violations: 16 immediately hazardous, 2 hazardous and 1 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for walls and ceilings (11), leaks and plumbing (5) and fire and safety equipment (5).
On 8 Oct 2025. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 2 days, and HPD issued 0 heat violations.
City marshals carried out 2 residential evictions here since 2017. The record says nothing about why, and most follow a case for unpaid rent.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 3032460010 · Block 3246, Lot 10 · Building class C2
