336 Starr Street, Brooklyn, NY 11237
Built 1931 · 3-story walk-up · 6 apartments
14 immediately hazardous violations open. 28 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 2814 · 12 · 2
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 34 | 2 |
| 2023 | 8 | 1 |
| 2024 | 10 | 0 |
| 2025 | 2 | 1 |
| 2026 so far | 15 | 3 |
Plus 214 violations from 2002 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Walls and ceilings 17
- Fire and safety equipment 15
- Heat and hot water 14
- Open per apartment
- 4.7 (28 open across 6 apartments)
- Inspector last found a problem
- 13 Jul 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 2 days.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 2 | 2 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous14 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Replace or repair the self-closing doors that is missing or defective at latch set assembly, at bulkhead door at public hall stairs, 3rd story
Issued 13 Jul 2026Not complied with 5 Aug 2026Fire and safety equipment§ 27-2005 +3
Replace or repair the self-closing doors that is missing or defective hinge at bulkhead at public hall, 3rd story
Issued 29 Apr 2026Not complied with 21 May 2026Fire and safety equipment§ 27-2005 +3
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on the wall at public hall, 1st story
Issued 3 Sept 2024Not complied with 18 Sept 2024Heat and hot water§ 27-2033
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Issued 7 Oct 2023Notice sent out 16 Oct 2023Heat and hot water§ 27-2033
Abate the infestation consisting of roaches in the entire apartment, 2nd story at north
Issued 12 Jul 2020Defect letter issued 18 Aug 2021Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen, 2nd story at east
Issued 22 Feb 2020Notice sent out 23 Feb 2020Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen, 2nd story at east
Issued 15 Feb 2020Notice sent out 23 Feb 2020Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom, 2nd story at east
Issued 15 Feb 2020Notice sent out 23 Feb 2020Lead paint§ 27-2056.6
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Issued 8 Jan 2020Not complied with 18 Aug 2021Heat and hot water§ 27-2033
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from north at west, 2nd story at south
Issued 17 Nov 2019Notice sent out 20 Nov 2019Lead paint§ 27-2056.6
Show all 14Show fewer
Abate the infestation consisting of roaches in the entire apartment, 2nd story at east
Issued 3 Oct 2019Defect letter issued 18 Aug 2021Pests§ 27-2017.4
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system, at public hall, 1st story
Issued 5 Jan 2019Not complied with 18 Aug 2021Heat and hot water§ 27-2033
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door from west at north wall, 1st door frame from west at north wall, north wall, west wall, 1st window frame from east at south wall in the 4th room from north at west, 2nd story at south
Issued 5 Aug 2008Notice sent out 7 Aug 2008Lead paint§ 27-2056.6
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall 1 story
Issued 9 Oct 2002Not complied with 18 Aug 2021Heat and hot water§ 27-2033
Hazardous12 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 3rd story at north
Issued 13 Jul 2026Civ14 mailed 1 Sept 2026Fire and safety equipment§ 27-2045 +3
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 3rd story at north
Issued 13 Jul 2026Civ14 mailed 1 Sept 2026Fire and safety equipment§ 27-2045 +2
Repair the roof so that it will not leak above ceiling and at north wall at public hall, 3rd story
Issued 13 Jul 2026Notice certified on time 31 Aug 2026Leaks and plumbing§ 27-2005
Replace with new the missing heavy duty lock set assembly at bulkhead door at public hall stairs, 3rd story
Issued 13 Jul 2026Notice certified on time 31 Aug 2026Doors and windows§ 27-2005
Repair the roof so that it will not leak above ceiling in the 3rd room from north at west, 3rd story at north
Issued 13 Jul 2026Civ14 mailed 1 Sept 2026Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective fire retardent material at ceiling and north wall at public hall, 3rd story
Issued 13 Jul 2026Notice certified on time 31 Aug 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north wall in the bathroom, 3rd story at south
Issued 23 Dec 2022Notice sent out 26 Dec 2022Walls and ceilings§ 27-2005
Properly repair the broken or defective lock at mailbox of an apartment at vestibule, 1st story
Issued 23 Dec 2022Notice sent out 26 Dec 2022Entry, buzzer and mail§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from north at east, 3rd story at south
Issued 14 Mar 2022Notice sent out 20 Mar 2022Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... at ceiling approx. 12 sq.ft at cellar original violation 15051527 issued 14-mar-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 14 Mar 2022First no access to re- inspect violation 2 Sept 2024Mold and damp§ 27-2017.3
Show all 12Show fewer
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the south yard
Issued 19 Feb 2020First no access to re- inspect violation 18 Aug 2021Electrical§ 27-2040
Properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at front, center and rear
Issued 19 Feb 2020Not complied with 18 Aug 2021Walls and ceilings§ 185 +1
Non-hazardous2 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 3rd room from north at west, 3rd story at north
Issued 12 Jul 2026Civ14 mailed 29 Oct 2026Mold and damp§ 27-2017.3
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hall, 3rd story
Issued 12 Jul 2026Notice certified on time 29 Oct 2026Walls and ceilings§ 27-2013
Paperwork and notices5 open
The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.
×2Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
2 issued 4 Dec 2017 to 6 Sept 2018Not complied withPaperwork and notices§ 26-1103
Paint or post a sign indicating floors all stories at public hall
Issued 6 Sept 2018Not complied with 18 Aug 2021Paperwork and notices§ 27-2048
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Issued 6 Sept 2018Not complied with 18 Aug 2021Paperwork and notices§ 27-2005
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Issued 4 Dec 2017Not complied with 18 Aug 2021Paperwork and notices§ 27-2005
263 closed violations, plus 9 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Abate the infestation consisting of roaches in the entire apartment, 3rd story at north
Issued 12 Jul 2026Violation dismissed 25 Oct 2026Pests§ 27-2017.4
Repair the roof so that it will not leak over ceiling in the 6th room from north, 3rd story at north
Issued 29 Apr 2026Violation dismissed 25 Aug 2026Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from north, 3rd story at north
Issued 29 Apr 2026Violation dismissed 25 Aug 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west, 3rd story at north
Issued 13 Jul 2026Violation closed 9 Aug 2026Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east, 1st story at north
Issued 11 Feb 2026Violation dismissed 14 Jun 2026Walls and ceilings§ 27-2005
Remove all obstructions and repair all defects in water closet at bathroom at basement in the bathroom lower level, 1st story at north
Issued 11 Feb 2026Violation dismissed 14 Jun 2026§ 27-2026
Properly repair or replace the broken or defective two window lower sashs at north wall in the 2nd room from east, 1st story at north
Issued 11 Feb 2026Violation dismissed 14 Jun 2026Doors and windows§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east, 1st story at north
Issued 11 Feb 2026Violation dismissed 14 Jun 2026Leaks and plumbing§ 27-2026
×2Abate the infestation consisting of roaches in the entire apartment, 1st story at east
2 issued 23 Oct 2024 to 13 Dec 2025Violation dismissedPests§ 27-2017.4
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at east
Issued 13 Dec 2025Violation closed 27 Feb 2026Fire and safety equipment§ 27-2005 +3
Replace with new the missing garbage cans lids
Issued 13 May 2025Violation dismissed 5 Nov 2025Garbage and cleanliness§ 27-2005
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd story balcony at fire escape stack at north wall
Issued 23 Oct 2024Violation dismissed 25 Feb 2025Fire and safety equipment§ 27-2005 +1
Adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at... in the entrance, 2nd story at west
Issued 23 Oct 2024Violation dismissed 25 Feb 2025Doors and windows§ 25-171
Abate the infestation consisting of roaches in the entire apartment, 2nd story at west
Issued 23 Oct 2024Violation dismissed 26 Jan 2025Pests§ 27-2017.4
Replace or repair the self-closing doors that is missing or defective door in the entrance, 1st story at east
Issued 23 Oct 2024Violation dismissed 20 Jan 2025Fire and safety equipment§ 27-2005 +3
Replace or repair the self-closing doors that is missing or defective door at vestibule at public hall, 1st story
Issued 7 Oct 2023Violation closed 2 Dec 2024Fire and safety equipment§ 27-2005 +3
Abate the infestation consisting of roaches in the bathroom, 2nd story at south
Issued 24 Mar 2024Violation dismissed 2 Jul 2024Pests§ 27-2017.4
Provide hot water at all hot water fixtures in the 4th bathroom from north, 2nd story at south
Issued 24 Mar 2024Violation dismissed 12 Jun 2024Heat and hot water§ 27-2031
Provide ready access to buildings heating system locked door at boiler room
Issued 24 Mar 2024Violation dismissed 12 Jun 2024Heat and hot water§ 27-2033
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees in the kitchen, 2nd story at south
Issued 24 Mar 2024Violation dismissed 12 Jun 2024Heat and hot water§ 27-2005 +1
Rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line at roof
Issued 7 Oct 2023Violation dismissed 7 Apr 2024Fire and safety equipment§ 62
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east
Issued 22 Nov 2023Violation dismissed 13 Feb 2024Heat and hot water§ 27-2031
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at east
Issued 22 Nov 2023Violation dismissed 13 Feb 2024Heat and hot water§ 27-2029
Provide ready access to buildings heating system door locked at basement
Issued 22 Nov 2023Violation dismissed 13 Feb 2024Heat and hot water§ 27-2033
Repair or replace the smoke detector missing in the entire apartment, 3rd story at east
Issued 7 Oct 2023Violation dismissed 4 Feb 2024Fire and safety equipment§ 27-2045
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd and 2nd story at rear. at fire escape
Issued 7 Oct 2023Violation dismissed 4 Feb 2024Fire and safety equipment§ 27-2005 +1
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at east
Issued 7 Oct 2023Violation dismissed 4 Feb 2024Fire and safety equipment§ 27-2046.1
Repair the leaky and/or defective faucets at wash basin at north in the bathroom, 2nd story at south
Issued 29 Dec 2022Violation dismissed 30 Apr 2023Leaks and plumbing§ 27-2026
Abate the infestation consisting of roaches in the entire apartment, 3rd story at south
Issued 23 Dec 2022Violation dismissed 9 Apr 2023Pests§ 27-2017.4
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the kitchen, 2nd story at south
Issued 29 Dec 2022Violation dismissed 21 Mar 2023Heat and hot water§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling all wall in the 3rd room from north, 3rd story at north
Issued 3 May 2022Violation dismissed 6 Sept 2022Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all wall in the 1st room from north, 3rd story at north
Issued 3 May 2022Violation dismissed 6 Sept 2022Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at ceiling in the 3rd room from north, 3rd story at north
Issued 3 May 2022Violation dismissed 6 Sept 2022Leaks and plumbing§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at east, the 4th room from north at west, 2nd story at south
Issued 17 Mar 2022Violation dismissed 6 Sept 2022Walls and ceilings§ 27-2013
Trace and repair the source and abate the visible mold condition... at ceiling approx. 12 sq.ft at cellar
Issued 14 Mar 2022Violation closed 18 Jul 2022Mold and damp§ 27-2017.3
Properly repair with similar material the broken or defective fire rated materials at walls and ceiling through out in the entire apartment, 1st story at east
Issued 28 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
Replace with new the missing cover at electrical switch at west wall in the 3rd room from north at east, 3rd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Electrical§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 2nd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north, 3rd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective ceramic tiles floor at entrance at vestibule, 1st story
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Floors and stairs§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from north at east, 3rd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at west, 3rd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the floor at boiler room
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Heat and hot water§ 27-2010
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Garbage and cleanliness§ 27-2010
Properly repair the source and abate the evidence of a water leak at ceiling at cellar
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Leaks and plumbing§ 27-2026
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Garbage and cleanliness§ 27-2010
Remove all encumbrances consisting of bike at public hall, 3rd story
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Fire and safety equipment§ 27-2005 +1
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at rear yard
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Garbage and cleanliness§ 27-2010
Repair the broken or defective plastered surfaces and paint in a uniform color at closet ceiling at east wall in the 1st room from north at west, 3rd story at north
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective ceramic tiles floor at public hall, 1st story
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Floors and stairs§ 27-2005
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment, 2nd story at south
Issued 14 Mar 2022Violation dismissed 21 Jun 2022Fire and safety equipment§ 27-2043.1
Abate the nuisance consisting of extremely hot water exceed 130 degree at all fixtures in the entire apartment, 3rd story at south
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Heat and hot water§ 27-2005 +1
Abate the nuisance consisting of extremely hot water exceed 130 degree at all fixtures in the entire apartment, 3rd story at north
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Heat and hot water§ 27-2005 +1
Abate the nuisance consisting of extremely hot water exceed 130 degree at all fixtures in the entire apartment, 2nd story at north
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Heat and hot water§ 27-2005 +1
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Walls and ceilings§ 27-2005
Abate the nuisance consisting of extremely hot water exceed 130 degree at all fixtures in the entire apartment, 2nd story at south
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Heat and hot water§ 27-2005 +1
Replace or repair the self-closing doors that is missing or defective at entrance at vestibule, 1st story
Issued 14 Mar 2022Violation dismissed 5 Jun 2022Fire and safety equipment§ 27-2005 +2
Properly repair with similar material the broken or defective cement mortar vertical crack at building front between 336 and 338 starr street from ground level to 3rd story
Issued 10 Feb 2022Violation dismissed 8 May 2022§ 27-2005
Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): see viuolation # 15084123 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.
Issued 28 Mar 2022Violation closed 22 Apr 2022§ 27-2005
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at south
Issued 2 Dec 2021Violation dismissed 31 Mar 2022Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective in the entire apartment, 2nd story at south
Issued 2 Dec 2021Violation dismissed 31 Mar 2022Fire and safety equipment§ 27-2045
Provide ready access to buildings heating system boiler room door locked at basement
Issued 2 Dec 2021Violation dismissed 23 Feb 2022Heat and hot water§ 27-2033
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at south
Issued 2 Dec 2021Violation dismissed 23 Feb 2022Heat and hot water§ 27-2031
Abate the infestation consisting of mice at public hall, 1st story
Issued 10 Oct 2021Violation dismissed 20 Jan 2022Pests§ 27-2017.4
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained. vacate #156074
Issued 16 Sept 2020Violation closed 19 Aug 2021§ 27-2089
Abate the nuisance consisting of fire damage in the entire apartment, 1st story at north
Issued 8 Sept 2020Violation closed 18 Aug 2021§ 27-2005 +1
Abate the nuisance consisting of fire damage in the entire apartment, 3rd story at north
Issued 8 Sept 2020Violation closed 18 Aug 2021§ 27-2005 +1
Provide a safe and adequate supply of electric service to the fixtures at ceiling fixtures, outlets and light switches in the entire apartment, 1st story at south
Issued 8 Sept 2020Violation closed 18 Aug 2021Electrical§ 27-2037
Abate the nuisance consisting of fire damage in the entire apartment, 2nd story at north
Issued 8 Sept 2020Violation closed 18 Aug 2021§ 27-2005 +1
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Issued 2 Sept 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Issued 2 Sept 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Issued 2 Sept 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
Issued 2 Sept 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2013
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Issued 2 Sept 2020Violation closed 18 Aug 2021Garbage and cleanliness§ 27-2010
Remove all encumbrances consisting of household items at public hall, 1st story
Issued 25 Aug 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 3rd story balcony at east stack at fire escape
Issued 18 Jul 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Remove all encumbrances consisting of construction debris and scaffolding at south east yard
Issued 12 Jul 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Remove the illegal fastening double cylinder lock at gate at fire passage way
Issued 12 Jul 2020Violation closed 18 Aug 2021§ 27-2005 +1
Abate the nuisance consisting of free standing radiator at southeast yard
Issued 12 Jul 2020Violation closed 18 Aug 2021Heat and hot water§ 27-2005 +1
Arrange and make self-closing the doors at apartment entrance, 2nd story at north
Issued 12 Jul 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Abate the nuisance consisting of plexi-glass panels installed at front entrance door to building, 1st story
Issued 25 Jun 2020Violation closed 18 Aug 2021Doors and windows§ 27-2005 +1
Remove the illegal fastening consisting of device arranged to be padlocked at metal gate, building east court yard.
Issued 9 May 2020Violation closed 18 Aug 2021Roof and outside the building§ 27-2005 +1
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of shopping cart and flower pots on balcony at south at fire escape, 2nd story
Issued 9 Apr 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Remove all encumbrances consisting of household items at public hall, 2nd story
Issued 19 Feb 2020Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Replace with new the broken or defective plywood at ceiling with sheetrock in the kitchen, 3rd story at south
Issued 19 Feb 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective flashing at exterior of bulkhead wall at north at roof
Issued 19 Feb 2020Violation closed 18 Aug 2021Roof and outside the building§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof
Issued 19 Feb 2020Violation closed 18 Aug 2021Garbage and cleanliness§ 27-2010
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st bathroom from north, 3rd story at south
Issued 19 Feb 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2005
Replace with new the broken or defective plywood at ceiling with sheetrock in the 2nd room from north at east, 3rd story at south
Issued 19 Feb 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling in the 1st bathroom from north, 3rd story at south
Issued 19 Feb 2020Violation closed 18 Aug 2021Leaks and plumbing§ 27-2005
Repair the roof so that it will not leak over ceiling in the 2nd room from north at east, 3rd story at south
Issued 19 Feb 2020Violation closed 18 Aug 2021Leaks and plumbing§ 27-2005
Replace with new the missing glass pane at center of vestibule door at public hall, 1st story
Issued 19 Feb 2020Violation closed 18 Aug 2021Doors and windows§ 27-2005
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 2nd story
Issued 19 Feb 2020Violation closed 18 Aug 2021Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective ceramic floor tiles at vestibule at public hall, 1st story
Issued 8 Jan 2020Violation closed 18 Aug 2021Floors and stairs§ 27-2005
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim at all stories at public hall
Issued 8 Jan 2020Violation closed 18 Aug 2021Walls and ceilings§ 27-2013
Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line,pad lock at gate to yard
Issued 17 Nov 2019Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Remove all encumbrances consisting of construction and household items at 1st and 2nd stories at public hall
Issued 14 Nov 2019Violation closed 18 Aug 2021Fire and safety equipment§ 27-2005 +1
Replace with new the broken or defective glass panes at building street entrance door
Issued 3 Oct 2019Violation closed 18 Aug 2021Doors and windows§ 27-2005
Abate the nuisance consisting of a padlocked gate at the east yard
Issued 30 May 2019Violation closed 18 Aug 2021Roof and outside the building§ 27-2005 +1
Showing the 100 most recent of 263.
305 violations on record in total, 33 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
70 complaints in three years, 24 of them in the last twelve months.
- Garbage and cleanliness12 / 26
- Pests1 / 13
- Fire and safety equipment0 / 7
- Leaks and plumbing6 / 6
- Noise0 / 6
- Heat and hot water2 / 5
- Doors and windows1 / 3
- Entry, buzzer and mail0 / 1
- Mold and damp1 / 1
- Walls and ceilings1 / 1
- Construction and illegal work0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case pending, 3 closed.
Tenant ActionPending
Opened 23 Sept 2020
Comprehensive
Opened 4 May 2021
Access Warrant - Non-Lead
Opened 10 May 2020
Tenant Action
Opened 28 Jul 2008
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No permit currently in force. 2 permits filed in the last five years.
Show 2 expired or finishedShow fewer
Plumbing
PLUMBING WORK AT CELLAR AND 1st FLOOR AS PER PLAN.
Issued 20 Apr 2023Expired 20 Apr 2024
Equipment work
Issued 13 Apr 2021Expired 13 Apr 2022
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 6 earlier reportsShow fewer
- 2024No infested units reported (2023 report)
- 2024No infested units reported (2022 report)
- 2023No infested units reported (2022 report)
- 2022No infested units reported (2021 report)
- 2021No infested units reported (2020 report)
- 2021No infested units reported (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
DEODAT LOWTAN
Public records list DEODAT LOWTAN as the registered managing agent for this address as of 3 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (24 in the records we hold, 10 shown)
- 840 Hart Street77 open violations · no reviews yet
- 309 Palmetto Street46 open violations · no reviews yet
- 282 Himrod Street45 open violations · no reviews yet
Show 7 moreShow fewer
- 191 Stanhope Street37 open violations · no reviews yet
- 152 Grattan Street31 open violations · no reviews yet
- 1567 Dekalb Avenue28 open violations · no reviews yet
- 338 Starr Street26 open violations · no reviews yet
- 241 Stockholm Street25 open violations · no reviews yet
- 315 Jefferson Street23 open violations · no reviews yet
- 834 Hart Street23 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
336 REALTY LLC
Public records list 336 REALTY LLC as the owner of record for this address as of 3 Sept 2026. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
336 Starr Street, Brooklyn, NY 11237
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 14 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- HPD has 1 case pending against the owner in Housing Court (tenant action). Ask what it is about and whether the work has been done.
- There are 2 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There was 1 pest complaint here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 28 open housing violations: 14 immediately hazardous, 12 hazardous and 2 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for walls and ceilings (17), fire and safety equipment (15) and heat and hot water (14).
On 13 Jul 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 2 days, and HPD issued 0 heat violations.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 3032010020 · Block 3201, Lot 20 · Building class C2
