72-51 65 Place, Ridgewood, NY 11385
Built 1931 · 3-story walk-up · 6 apartments
19 immediately hazardous violations open. 36 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 3619 · 12 · 5
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 5 | 1 |
| 2024 | 2 | 0 |
| 2025 | 19 | 5 |
| 2026 so far | 0 | 0 |
Plus 6 violations from 1988 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Lead paint 15
- Doors and windows 8
- Walls and ceilings 4
- Open per apartment
- 6 (36 open across 6 apartments)
- Inspector last found a problem
- 12 Jan 2025 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 0 | 0 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous19 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, west wall in the bathroom, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 3rd room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, north wall, 1st window frame from south at west wall in the kitchen, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the kitchen, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Properly repair or replace the broken or defective lower glass pane at the 1st window from north at east in the kitchen, 2nd story at south
Issued 12 Jan 2025Notice certified late 26 Jan 2025Doors and windows§ 27-2005
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 5th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door frame from north at east wall in the 5th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the bathroom, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Lead paint§ 27-2056.6
Show all 19Show fewer
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Issued 4 Dec 2024Notice sent out 26 Jan 2025Lead paint§ 27-2056.4
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Issued 4 Dec 2024Notice sent out 26 Jan 2025Lead paint§ 27-2056.7
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom, 2nd story at south
Issued 12 Jul 2023Certification postponment denied 14 Aug 2023Lead paint§ 27-2056.6
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at south
Issued 12 Jul 2023Certification postponment denied 14 Aug 2023Lead paint§ 27-2056.7 +2
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the kitchen, 2nd story at south
Issued 12 Jul 2023Certification postponment denied 14 Aug 2023Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from south at west wall in the 2nd room from east, 2nd story at south
Issued 12 Jul 2023Certification postponment denied 14 Aug 2023Lead paint§ 27-2056.6
Provide ready access to buildings heating system door lock at 1 sty public hall rear and building front cellar entrance at boiler room, cellar
Issued 1 Nov 2000Notice certified late 17 Sept 2007Heat and hot water§ 27-2033
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall at boiler room, cellar
Issued 1 Nov 2000Notice certified late 17 Sept 2007Heat and hot water§ 27-2033
Abate the nuisance consisting of double cylinder key operated lock installed entrance door to 1 sty apartment northeast an apartment.
Issued 4 Feb 1988Notice certified late 7 Sept 2008Doors and windows§ 27-2005 +1
Hazardous12 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Provide a safe and adequate supply of electric service to the fixtures light at the ceiling in the 2nd room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Electrical§ 27-2037
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector missing in the entire apartment, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Fire and safety equipment§ 27-2045
Properly repair or replace the broken or defective 1st and 2nd windows from south at west upper sash spring balance in the 5th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2005
Properly repair or replace the broken or defective lower glass pane at the 1st window from north at east in the bathroom, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2005
Properly repair with similar material the broken or defective wood floor in the kitchen, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Floors and stairs§ 27-2005
Properly repair or replace the broken or defective spring balance at the 1st window from north at east lower sash in the kitchen, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 5th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... great then 10sq feet at the east, north walls and ceiling in the bathroom, 2nd story at south
Issued 12 Jan 2025First no access to re- inspect violation 21 Jun 2025Mold and damp§ 27-2017.3
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 1st story
Issued 25 Jan 2011Notice sent out 26 Jan 2011Fire and safety equipment§ 27-2046.1
Show all 12Show fewer
Repair or replace the smoke detector inoperative in the entire apartment, 1st story
Issued 25 Jan 2011Notice sent out 26 Jan 2011Fire and safety equipment§ 27-2045
Replace with new the broken or defective air valve at radiator in the 4th room from east, 1st story
Issued 25 Jan 2011Notice sent out 26 Jan 2011Heat and hot water§ 27-2005
Non-hazardous5 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Paint with light colored paint to the satisfaction of this department, north wall, west wall, south wall, 1st closet from north at east wall door frame in the 2nd room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department, 1st door frame from south at west wall in the 3rd room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department, 1st window frame from north at east wall in the 4th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department, 1st door from north at east wall in the 5th room from east, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department, ceiling, east wall, north wall, south wall in the bathroom, 2nd story at south
Issued 12 Jan 2025Notice sent out 12 Jan 2025Walls and ceilings§ 27-2013
2 closed violations, plus 4 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 5th room from east, 2nd story at south
Issued 12 Jul 2023Violation dismissed 10 Dec 2023Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color approx 12 sq ft at the ceiling in the bathroom, 2nd story at south
Issued 12 Jul 2023Violation closed 7 Aug 2023Walls and ceilings§ 27-2005
42 violations on record in total, 36 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
12 complaints in three years, 1 of them in the last twelve months.
- Fire and safety equipment0 / 4
- Floors and stairs0 / 3
- Walls and ceilings0 / 2
- Construction and illegal work0 / 1
- Mold and damp0 / 1
- Noise1 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
No HPD Housing Court cases on record for this building.
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 7 earlier reportsShow fewer
- 2025No infested units reported (2023 report)
- 2024No infested units reported (2022 report)
- 2024No infested units reported (2022 report)
- 2023No infested units reported (2021 report)
- 2022No infested units reported (2021 report)
- 2022No infested units reported (2020 report)
- 2021No infested units reported (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Owner of record and managing agent
SANIJA VULIC
Public records list SANIJA VULIC as the owner of record and the registered managing agent for this address as of 23 Aug 2025. Source: HPD registration.
Other buildings listed under this owner and agent (1 in the records we hold)
- 72-53 65 Place19 open violations · no reviews yet
No combined rating for this owner and agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
BRAHIM VULIC
Public records list BRAHIM VULIC as the owner of record for this address as of 23 Aug 2025. Source: HPD registration.
Other buildings listed under this owner (1 in the records we hold)
- 72-53 65 Place19 open violations · no reviews yet
No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
72-51 65 Place, Ridgewood, NY 11385
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 19 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- This building dates from 1931 and has 15 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 36 open housing violations: 19 immediately hazardous, 12 hazardous and 5 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for lead paint (15), doors and windows (8) and walls and ceilings (4).
On 12 Jan 2025. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
No heat or hot-water complaints or violations were recorded here in the 2025–26 heat season.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4036980005 · Block 3698, Lot 5 · Building class C2
