ByTenantsByTenants home

60-16 Woodbine Street, Ridgewood, NY 11385

Built 1911 · 3-story walk-up · 12 apartments

22 immediately hazardous violations open. 33 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
3322 · 10 · 1
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202300
202400
2025111
2026 so far00

Plus 94 violations from 1985 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 7
  • Doors and windows 2
  • Roof and outside the building 1
Open per apartment
2.8 (33 open across 12 apartments)
Inspector last found a problem
10 Jun 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous22 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Properly repair or replace the broken or defective counter balance lower sash of 2nd window from west at north in the kitchen, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Doors and windows§ 27-2005

  • Remove device preventing door from being self-closing consisting of hook and eye installed on vestibule door to public hall, 1st story

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges and latch bulkhead to roof at public hall, 3rd story

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 2nd story at south

    Issued 5 Feb 2020Notice sent out 6 Feb 2020Lead paint§ 27-2056.8

  • Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Issued 5 Feb 2020Notice sent out 6 Feb 2020Lead paint§ 27-2056.4

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 1st story at west

    Issued 5 Feb 2020Notice sent out 6 Feb 2020Lead paint§ 27-2056.8

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 16 Oct 2019Notice sent out 2 Dec 2019Lead paint§ 27-2056.7

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom, 1st story at east

    Issued 27 Aug 2019Notice sent out 29 Aug 2019Lead paint§ 27-2056.6

  • Abate the infestation consisting of mice in the entire apartment, 1st story at east

    Issued 27 Aug 2019Notice of issuance sent to tenant 29 Aug 2019Pests§ 27-2017.4

Show all 22
  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the 2nd room from north, 1st story at east

    Issued 15 Aug 2019Notice sent out 18 Aug 2019Lead paint§ 27-2056.6

  • Arrange and make self-closing the doors.... in the entrance, 1st story at east

    Issued 15 Aug 2019Notice sent out 18 Aug 2019Fire and safety equipment§ 27-2005 +1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the kitchen, 1st story at east

    Issued 15 Aug 2019Notice sent out 18 Aug 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, east wall, west wall, 1st window frame from north at east wall in the bathroom, 1st story at east

    Issued 15 Aug 2019Notice sent out 18 Aug 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall in the bathroom, 1st story at north

    Issued 13 Aug 2019Notice sent out 14 Aug 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the kitchen, 1st story at north

    Issued 13 Aug 2019Notice sent out 14 Aug 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north, 1st story at north

    Issued 13 Aug 2019Notice sent out 14 Aug 2019Lead paint§ 27-2056.6

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Issued 18 Jul 2019False certification 11 Aug 2019Heat and hot water§ 27-2033

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from east at south wall, 1st door frame from south at west wall, 1st riser from north at east wall, east wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen, 1st story at east

    Issued 18 Jun 2019Not complied with 28 Jul 2019Lead paint§ 27-2056.6

  • Trace and repair the source and abate the visible mold condition... 10 sq.ft. at south and west walls in the bathroom, 1st story at east original violation 13129742 issued 18-jun-19 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).

    Issued 18 Jun 2019Notice of issuance sent to tenant 25 Aug 2019Mold and damp§ 27-2017.3

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at east

    Issued 18 Jun 2019Not complied with 11 Aug 2019Pests§ 27-2017.4

  • Abate the nuisance consisting of telephone lines across roof trip hazard at frnt.

    Issued 12 Sept 1985Not complied with 22 Aug 2018Roof and outside the building§ D26-10.01 +1

Hazardous10 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair or replace the broken or defective latch assembly on bulkhead door to roof at public hall, 3rd story

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Roof and outside the building§ 27-2005

  • Remove all encumbrances consisting of household items at public hall, 1st story

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plants pots and household items 2nd story balcony building front at fire escape

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2005 +1

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Fire and safety equipment§ 27-2045

  • Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the bathroom, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood sink base cabinet in the kitchen, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective wooden floor(hole) in the 2nd room from north, 3rd story at north

    Issued 12 May 2018Not complied with 21 Aug 2018Floors and stairs§ 27-2005

  • Properly repair the broken or defective intercom system from building entrance ( vestibule ) to kitchen, 3rd story at north

    Issued 12 May 2018Not complied with 21 Aug 2018Entry, buzzer and mail§ 27-2005

  • Abate the nuisance consisting of mice, 3rd story at north

    Issued 12 May 2018Not complied with 21 Aug 2018Pests§ 27-2018

Non-hazardous1 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Properly repair or replace the broken or defective latch assembly entrance door in the bathroom, 3rd story at north

    Issued 10 Jun 2025Notice sent out 10 Jun 2025Doors and windows§ 27-2005

Paperwork and notices3 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • ×2File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    2 issued 12 Jun 2025 to 7 May 2026Notice sent outPaperwork and notices

  • Owner failed to file a valid registration statement with the department as required by adm code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Issued 21 Nov 2025Info notice sent out 20 Nov 2025Paperwork and notices§ 27-2107

73 closed violations, plus 10 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 18 Dec 2019Violation closed 6 Feb 2020Lead paint§ 27-2056.4 +1

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 1st story at east

    Issued 21 Oct 2019Violation dismissed 26 Jan 2020Leaks and plumbing§ 27-2026

  • Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the kitchen, 1st story at east

    Issued 21 Oct 2019Violation dismissed 26 Jan 2020Electrical§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the bathroom, 1st story at east

    Issued 21 Oct 2019Violation dismissed 26 Jan 2020Electrical§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall in the bathroom, 1st story at east

    Issued 21 Oct 2019Violation dismissed 26 Jan 2020Walls and ceilings§ 27-2005

  • Properly repair the broken or defective mail box lock for an apartment at public hall, 1st story

    Issued 20 Aug 2019Violation dismissed 26 Jan 2020§ 27-2005

  • Reset, so as to secure a proper and tight connection, the water closet bowl.. in the bathroom, 1st story at east

    Issued 20 Aug 2019Violation dismissed 26 Jan 2020§ 27-2026

  • Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the bathroom, 1st story at east

    Issued 15 Aug 2019Violation dismissed 26 Jan 2020Heat and hot water§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the bathroom, 1st story at east

    Issued 15 Aug 2019Violation dismissed 26 Jan 2020Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 1st story at north

    Issued 13 Aug 2019Violation dismissed 26 Jan 2020Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the bathroom, 1st story at north

    Issued 13 Aug 2019Violation dismissed 26 Jan 2020Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation the 2nd riser from west at north wall, 3rd riser from west at north wall, 1st radiator from west at north wall in the bathroom, 1st story at north

    Issued 13 Aug 2019Violation dismissed 26 Jan 2020Heat and hot water§ 27-2005

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the bathroom, 1st story at north

    Issued 13 Aug 2019Violation dismissed 26 Jan 2020Walls and ceilings§ 300

  • ×3Abate the infestation consisting of roaches in the entire apartment, 1st story at east

    3 issued 26 Jul 2019 to 21 Oct 2019Violation dismissedPests§ 27-2017.4

  • ×3Abate the infestation consisting of mice in the entire apartment, 1st story at east

    3 issued 26 Jul 2019 to 21 Oct 2019Violation dismissedPests§ 27-2017.4

  • Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also a chain-guard in the kitchen, 1st story at north

    Issued 8 Aug 2019Violation dismissed 8 Jan 2020Doors and windows§ 27-2043

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration (the suspended accoustic ceiling) in the bathroom, 1st story at north

    Issued 8 Aug 2019Violation dismissed 8 Jan 2020Walls and ceilings§ 300

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north, 1st story at east

    Issued 18 Jun 2019Violation dismissed 8 Dec 2019Walls and ceilings§ 27-2013

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the bathroom, 1st story at east

    Issued 18 Jun 2019Violation dismissed 8 Dec 2019Walls and ceilings§ 300

  • Paint with light colored paint to the satisfaction of this department the south wall, ceiling in the kitchen, 1st story at east

    Issued 18 Jun 2019Violation dismissed 8 Dec 2019Walls and ceilings§ 27-2013

  • ×2Paint with light colored paint to the satisfaction of this department the west wall in the bathroom, 1st story at east

    2 issued 18 Jun 2019 to 27 Aug 2019Violation dismissedWalls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 1st story at east

    Issued 15 Aug 2019Violation dismissed 4 Dec 2019Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the bathroom, 1st story at east

    Issued 15 Aug 2019Violation dismissed 4 Dec 2019Walls and ceilings§ 27-2005

  • Replace with new the broken or defective base cabinet in the kitchen, 1st story at east

    Issued 15 Aug 2019Violation dismissed 4 Dec 2019Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at east

    Issued 15 Aug 2019Violation dismissed 4 Dec 2019Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at east

    Issued 15 Aug 2019Violation dismissed 4 Dec 2019Fire and safety equipment§ 27-2046.1

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 1st story at east

    Issued 15 Aug 2019Violation dismissed 3 Dec 2019Floors and stairs§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 1st story at east

    Issued 27 Aug 2019Violation dismissed 28 Nov 2019Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the kitchen, 1st story at east

    Issued 27 Aug 2019Violation dismissed 28 Nov 2019Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 1st story at east

    Issued 27 Aug 2019Violation dismissed 28 Nov 2019Walls and ceilings§ 27-2005

  • Properly repair the broken or defective base cabinet at east wall in the kitchen, 1st story at east

    Issued 20 Aug 2019Violation dismissed 28 Nov 2019Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective, 1st story at east

    Issued 20 Aug 2019Violation dismissed 28 Nov 2019Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective, 1st story at east

    Issued 20 Aug 2019Violation dismissed 28 Nov 2019Fire and safety equipment§ 27-2046.1

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 1st story at north

    Issued 13 Aug 2019Violation dismissed 28 Nov 2019Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom, 1st story at north

    Issued 13 Aug 2019Violation dismissed 28 Nov 2019Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the kitchen, 1st story at north

    Issued 13 Aug 2019Violation dismissed 28 Nov 2019Walls and ceilings§ 27-2005

  • Replace with new the broken or defective base cabinet at sink in the kitchen, 1st story at north

    Issued 8 Aug 2019Violation dismissed 28 Nov 2019Leaks and plumbing§ 27-2005

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 1st story at east

    Issued 20 Aug 2019Violation dismissed 21 Nov 2019Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment, 1st story at east

    Issued 15 Aug 2019Violation dismissed 21 Nov 2019Fire and safety equipment§ 27-2043.1

  • Abate the infestation consisting of roaches, 1st story at north

    Issued 8 Aug 2019Violation dismissed 7 Nov 2019Pests§ 27-2017.4

  • Abate the infestation consisting of mice, 1st story at north

    Issued 8 Aug 2019Violation dismissed 7 Nov 2019Pests§ 27-2017.4

  • Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen, 1st story at north

    Issued 13 Aug 2019Violation dismissed 6 Nov 2019Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective sheetrock ceiling 16 square feet in the kitchen, 1st story at north

    Issued 13 Aug 2019Violation dismissed 6 Nov 2019Walls and ceilings§ 27-2005

  • ×2Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at north

    2 issued 8 Aug 2019 to 13 Aug 2019Violation dismissedLeaks and plumbing§ 27-2026

  • Remove the illegal double cylinder key operated locking device at door at entrance door at south wall in the kitchen, 1st story at north

    Issued 8 Aug 2019Violation dismissed 6 Nov 2019Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen, 1st story at north

    Issued 8 Aug 2019Violation dismissed 6 Nov 2019Walls and ceilings§ 27-2005

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system, at public hall, 1st story

    Issued 8 Aug 2019Violation dismissed 29 Oct 2019Heat and hot water§ 27-2033

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1;and properly secure air conditioner uit with one way screws., 1st story at north

    Issued 8 Aug 2019Violation dismissed 29 Oct 2019Fire and safety equipment§ 27-2043.1

  • Arrange and make self-closing the doors... in the entrance, 1st story at east

    Issued 26 Jul 2019Violation dismissed 29 Oct 2019Fire and safety equipment§ 27-2005 +1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; in the entire apartment, 1st story at east

    Issued 18 Jun 2019Violation closed 13 Oct 2019Fire and safety equipment§ 27-2043.1

  • Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen, 1st story at east

    Issued 18 Jun 2019Violation dismissed 3 Oct 2019Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective faucets at wash/basin in the bathroom, 1st story at east

    Issued 18 Jun 2019Violation dismissed 3 Oct 2019Leaks and plumbing§ 27-2026

  • Replace the broken or defective water closet tank in the bathroom, 1st story at east

    Issued 18 Jun 2019Violation dismissed 3 Oct 2019§ 27-2026

  • Repair or replace the smoke detector inoperable in the entire apartment, 1st story at east

    Issued 18 Jun 2019Violation dismissed 3 Oct 2019Fire and safety equipment§ 27-2045

  • Properly repair with similar material the broken or defective wood floor around the south one door in the 2nd room from north, 1st story at east

    Issued 18 Jun 2019Violation dismissed 3 Oct 2019Doors and windows§ 27-2005

  • Trace and repair the source and abate the visible mold condition... 10 sq.ft. at south and west walls in the bathroom, 1st story at east

    Issued 18 Jun 2019Violation closed 23 Aug 2019Mold and damp§ 27-2017.3

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 1st story at east

    Issued 18 Jun 2019Violation closed 28 Jul 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 2nd room from north, 1st story at east

    Issued 18 Jun 2019Violation closed 28 Jul 2019Lead paint§ 27-2056.6

  • Abate the nuisance consisting of roaches, 2nd story at north

    Issued 22 Aug 2018Violation dismissed 16 Dec 2018Pests§ 27-2018

  • Arrange and make self-closing the doors at bulkhead to roof at public hall, 3rd story

    Issued 22 Aug 2018Violation dismissed 16 Dec 2018Fire and safety equipment§ 27-2005 +1

  • Repair or replace the smoke detector missing, 2nd story at north

    Issued 22 Aug 2018Violation dismissed 16 Dec 2018Fire and safety equipment§ 27-2045

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 2nd story at north

    Issued 22 Aug 2018Violation dismissed 16 Dec 2018Fire and safety equipment§ 27-2046.1

  • Abate the nuisance consisting of air conditioner in the window, obstructing exit to fire escape in the kitchen, 2nd story at north

    Issued 22 Aug 2018Violation dismissed 16 Dec 2018Fire and safety equipment§ 27-2005 +1

  • Abate the nuisance consisting of telephone lines at roof, triping hazard

    Issued 22 Aug 2018Violation closed 2 Oct 2018Roof and outside the building§ 27-2005 +1

  • Properly repair the broken or defective door lock in the bathroom, 3rd story at north

    Issued 12 May 2018Violation closed 21 Aug 2018Doors and windows§ 27-2005

  • Replace with new the missing ceramic floor tiles in the bathroom, 3rd story at north

    Issued 12 May 2018Violation closed 21 Aug 2018Floors and stairs§ 27-2005

  • Abate the nuisance consisting of east clothesline pole and west clothesline pole leaning about to collapse rear court yard er1.

    Issued 19 Dec 1990Violation closed 21 Aug 2018Roof and outside the building§ 27-2005 +1

119 violations on record in total, 36 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

6 complaints in three years, 0 of them in the last twelve months.

  • Doors and windows0 / 2
  • Garbage and cleanliness0 / 1
  • Leaks and plumbing0 / 1
  • Mold and damp0 / 1
  • Walls and ceilings0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

2 cases, all closed.

  • Lead False Certification

    Opened 22 Aug 2019

  • Tenant Action

    Opened 30 Jul 2019

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20171 eviction

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2024No infested units reported (2022 report)
Show 1 earlier report
  • 2023No infested units reported (2021 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

The most recent registration on file for this address expired 31 Aug 2025 and has not been renewed since, so it is more than a full cycle old. Whoever is named below may no longer be responsible for the building.

  • Registered managing agent

    MADELINE HOCEVAR

    Public records list MADELINE HOCEVAR as the registered managing agent for this address as of 22 Sept 2024. Source: HPD registration.

  • Owner of record

    ESTATE OF FRIEDA HOCEVAR

    Public records list ESTATE OF FRIEDA HOCEVAR as the owner of record for this address as of 22 Sept 2024. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 22 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. The owner has filed a bedbug report for this building (most recently for the year ending 2024). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1911 and has 12 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4035290018 · Block 3529, Lot 18 · Building class C1