1862 Woodbine Street, Ridgewood, NY 11385
Built 1913 · 3-story walk-up · 6 apartments
14 immediately hazardous violations open. 97 open in all.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 9714 · 71 · 12
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 2 | 0 |
| 2024 | 0 | 0 |
| 2025 | 80 | 15 |
| 2026 so far | 12 | 2 |
Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Walls and ceilings 28
- Leaks and plumbing 22
- Fire and safety equipment 18
- Open per apartment
- 16.2 (97 open across 6 apartments)
- Inspector last found a problem
- 2 Jun 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 1 day.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 1 | 1 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThis building is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous14 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Abate the infestation consisting of mice in the entire apartment, 3rd story at west
Issued 2 Jun 2026Notice of issuance sent to tenant 2 Jun 2026Pests§ 27-2017.4
×2Abate the infestation consisting of roaches in the entire apartment, 3rd story at west
2 issued 24 Sept 2025 to 2 Jun 2026Notice of issuance sent to tenantPests§ 27-2017.4
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 2nd story at west
Issued 5 Aug 2025Notice sent out 5 Aug 2025Fire and safety equipment§ 27-2005 +3
Provide an adequate supply of heat for the apartment in the 1st room from north, 3rd story at west
Issued 26 Mar 2025Notice sent out 26 Mar 2025Heat and hot water§ 27-2029
Provide ready access to buildings heating system door locked at cellar at boiler room
Issued 26 Mar 2025Notice sent out 26 Mar 2025Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the 1st room from north, 1st story at west
Issued 26 Mar 2025Notice sent out 26 Mar 2025Heat and hot water§ 27-2029
Provide hot water at all hot water fixtures in the 1st room from east, 3rd story at south
Issued 7 Mar 2025Notice sent out 9 Mar 2025Heat and hot water§ 27-2031
Provide ready access to buildings heating system door lock at boiler room, 1st story
Issued 7 Mar 2025Notice sent out 9 Mar 2025Heat and hot water§ 27-2033
Provide ready access to buildings heating system boiler room door is locked at cellar story. at boiler room
Issued 17 Feb 2025Notice sent out 17 Feb 2025Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the 5th room from east, 1st story at south
Issued 17 Feb 2025Notice sent out 17 Feb 2025Heat and hot water§ 27-2029
Show all 14Show fewer
Remove the illegal fastening consisting of lockable slide bolt at door to roof at bulkhead at public hall, 3rd story
Issued 16 Feb 2025Notice sent out 19 Feb 2025Roof and outside the building§ 27-2005 +1
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Issued 12 Feb 2025Notice sent out 13 Feb 2025Heat and hot water§ 27-2033
Provide ready access to buildings heating system door lock at 1st story public hall
Issued 12 Feb 2025Notice sent out 13 Feb 2025Heat and hot water§ 27-2033
Hazardous71 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Properly repair with similar material the broken or defective ceiling and all walls. at public hall stairs, 3rd story
Issued 2 Jun 2026Notice sent out 3 Jun 2026Floors and stairs§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from north, 3rd story at west
Issued 2 Jun 2026Notice sent out 2 Jun 2026Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom, 3rd story at west
Issued 2 Jun 2026Notice sent out 2 Jun 2026Walls and ceilings§ 27-2005
Repair the broken or defective connection sink in the kitchen, 3rd story at west
Issued 2 Jun 2026Notice sent out 2 Jun 2026Leaks and plumbing§ 27-2026
Properly repair or replace the broken or defective sink faucet in the kitchen, 3rd story at west
Issued 2 Jun 2026Notice sent out 2 Jun 2026Leaks and plumbing§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north, 3rd story at west
Issued 2 Jun 2026Notice sent out 2 Jun 2026Leaks and plumbing§ 27-2026
×2Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 3rd story at west
2 issued 24 Sept 2025 to 2 Jun 2026Notice sent outFire and safety equipment§ 27-2045 +2
×2Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 3rd story at west
2 issued 24 Sept 2025 to 2 Jun 2026Notice sent outFire and safety equipment§ 27-2045 +3
×2Abate the infestation consisting of bedbugs in the entire apartment, 3rd story at west
2 issued 24 Sept 2025 to 2 Jun 2026Notice sent outPests§ 27-2017.4
Trace and repair the source and abate the visible mold condition... less than 10sq.feet at south and west walls in the bathroom, 3rd story at west original violation 18974555 issued 02-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Issued 1 Jun 2026Notice of issuance sent to tenant 30 Sept 2026Mold and damp§ 27-2017.3
Show all 71Show fewer
×2Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 3rd story at west
2 issued 16 Feb 2025 to 24 Sept 2025Notice sent outWalls and ceilings§ 27-2005
×2Repair the roof so that it will not leak ceiling in the kitchen, 3rd story at west
2 issued 16 Feb 2025 to 24 Sept 2025Notice sent outLeaks and plumbing§ 27-2005
Properly repair the source and abate the evidence of a water leak west wall in the bathroom, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color east west and south walls in the bathroom, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Walls and ceilings§ 27-2005
Replace with new the missing escutcheon plate heat riser pipe in the bathroom, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Heat and hot water§ 27-2005
Properly repair with similar material the broken or defective porcelain enamel glaze bathtub in the bathroom, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective sink base cabinet in the kitchen, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Leaks and plumbing§ 27-2005
Remove all encumbrances consisting of construction items at public hall, 3rd story
Issued 24 Sept 2025Notice sent out 25 Sept 2025Fire and safety equipment§ 27-2005 +1
Trace and repair the source and abate the visible mold condition... less than 10 square feet ceiling in the kitchen, 3rd story at west original violation 18248955 issued 24-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Issued 24 Sept 2025First no access to re- inspect violation 7 Jul 2026Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet south wall in the bathroom, 3rd story at west original violation 18248951 issued 24-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Issued 24 Sept 2025First no access to re- inspect violation 7 Jul 2026Mold and damp§ 27-2017.3
×2Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north, 3rd story at west
2 issued 16 Feb 2025 to 24 Sept 2025Notice sent outWalls and ceilings§ 27-2005
Provide adequate lighting for light fixtures at ceiling not less than 60 watts incandescent or eequivalent at public hall, 1st story
Issued 19 Sept 2025Notice sent out 21 Sept 2025Electrical§ 27-2038
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 1st story at south
Issued 19 Sept 2025Notice sent out 21 Sept 2025Fire and safety equipment§ 27-2045 +2
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 1st story at south
Issued 19 Sept 2025Notice sent out 21 Sept 2025Fire and safety equipment§ 27-2045 +3
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom, 2nd story at west
Issued 5 Aug 2025Notice sent out 5 Aug 2025Leaks and plumbing§ 27-2026
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 2nd story at west
Issued 5 Aug 2025Notice sent out 5 Aug 2025Fire and safety equipment§ 27-2045 +3
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom, 2nd story at west
Issued 5 Aug 2025Notice sent out 5 Aug 2025Walls and ceilings§ 27-2005
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 2nd story at west
Issued 5 Aug 2025Notice sent out 5 Aug 2025Fire and safety equipment§ 27-2045 +2
Properly repair with similar material the broken or defective fire retardant ceiling and all walls at public hall, 3rd story
Issued 6 May 2025Notice sent out 7 May 2025Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Issued 1 May 2025Notice sent out 5 May 2025Leaks and plumbing§ 27-2005
Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling and south wall in the bathroom, 3rd story at west
Issued 26 Mar 2025First no access to re- inspect violation 22 Jun 2025Mold and damp§ 27-2017.3
Repair the broken or defective connection at wasteline at sink in the kitchen, 3rd story at west
Issued 26 Mar 2025Notice sent out 26 Mar 2025Leaks and plumbing§ 27-2026
×2Repair the leaky and/or defective faucets at sink in the kitchen, 3rd story at west
2 issued 12 Feb 2025 to 26 Mar 2025Notice sent outLeaks and plumbing§ 27-2026
Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling in the kitchen, 3rd story at west
Issued 26 Mar 2025First no access to re- inspect violation 22 Jun 2025Mold and damp§ 27-2017.3
Repair the roof so that it will not leak ceiling in the kitchen, 3rd story at south
Issued 7 Mar 2025Notice sent out 9 Mar 2025Leaks and plumbing§ 27-2005
Repair the roof so that it will not leak ceiling in the 2nd room from east, 3rd story at south
Issued 7 Mar 2025Notice sent out 9 Mar 2025Leaks and plumbing§ 27-2005
×2Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 3rd story at south
2 issued 17 Feb 2025 to 7 Mar 2025Notice sent outWalls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... less than square 10 feet at ceiling in the kitchen, 3rd story at south original violation 17746373 issued 07-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 7 Mar 2025First no access to re- inspect violation 7 Jul 2026Mold and damp§ 27-2017.3
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east, 3rd story at south
Issued 7 Mar 2025Notice sent out 9 Mar 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceilling, east, and south walls in the 3rd room from east, 3rd story at south
Issued 17 Feb 2025Notice sent out 17 Feb 2025Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling in the 3rd room from east, 3rd story at south
Issued 17 Feb 2025Notice sent out 17 Feb 2025Leaks and plumbing§ 27-2005
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the kitchen, 3rd story at south
Issued 17 Feb 2025First no access to re- inspect violation 4 May 2025Mold and damp§ 27-2017.3
Properly repair with similar material the broken or defective wood based cabinet at sink in the kitchen, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective ceramic tiles at bathtub in the bathroom, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Leaks and plumbing§ 27-2005
Repair the leaky and/or defective faucets hot water handle at wash basin in the bathroom, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Heat and hot water§ 27-2026
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective in the entire apartment, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Fire and safety equipment§ 27-2045
Repair the roof so that it will not leak over ceiling in the 3rd room from north, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Leaks and plumbing§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at bulkhead at public hall, 3rd story
Issued 16 Feb 2025Notice sent out 19 Feb 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the kitchen, 3rd story at west original violation 17698375 issued 16-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 16 Feb 2025First no access to re- inspect violation 7 Jul 2026Mold and damp§ 27-2017.3
Refit door & frame at door to roof at bulkhead at public hall, 3rd story
Issued 16 Feb 2025Notice sent out 19 Feb 2025Roof and outside the building§ 27-2005
Repair the leaky and/or defective faucets sink handles in the kitchen, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Leaks and plumbing§ 27-2026
Properly repair or replace the broken or defective base cabinet at west wall in the kitchen, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling, south and west walls in the bathroom, 3rd story at west
Issued 12 Feb 2025First no access to re- inspect violation 4 May 2025Mold and damp§ 27-2017.3
×2Properly repair with similar material the broken or defective ceramic wall tiles at north and east walls in the bathroom, 3rd story at west
2 issued 12 Feb 2025Notice sent outWalls and ceilings§ 27-2005
Repair the leaky and/or defective faucets at wash basin at east wall in the bathroom, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Leaks and plumbing§ 27-2026
Refit door in the bathroom, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Doors and windows§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector missing in the entire apartment, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Fire and safety equipment§ 27-2045
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 3rd story
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2005
Non-hazardous12 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall stairs, 3rd story
Issued 2 Jun 2026Notice sent out 3 Jun 2026Floors and stairs§ 27-2013
Paint metal in accordance with dept. regulation riser pipe in the bathroom, 3rd story at west
Issued 24 Sept 2025Notice sent out 25 Sept 2025Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 3rd story
Issued 6 May 2025Notice sent out 7 May 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Issued 1 May 2025Notice sent out 5 May 2025Walls and ceilings§ 27-2013
Properly repair or replace the broken or defective bell buzzer from building front to east wall in the 4th room from north, 3rd story at west
Issued 26 Mar 2025Notice sent out 26 Mar 2025Entry, buzzer and mail§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north, 3rd story at west
Issued 26 Mar 2025Notice sent out 26 Mar 2025Walls and ceilings§ 27-2005
Paint metal in accordance with dept. regulation heat riser in the bathroom, 3rd story at south
Issued 7 Mar 2025Notice sent out 9 Mar 2025Heat and hot water§ 27-2005
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department all walls in the bathroom, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department ceiling and all walls at bulkhead at public hall, 3rd story
Issued 16 Feb 2025Notice sent out 19 Feb 2025Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment, 3rd story at west
Issued 16 Feb 2025Notice sent out 18 Feb 2025Walls and ceilings§ 27-2013
Show all 12Show fewer
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2013
Properly repair or replace the broken or defective vanity cabinet at east wall in the bathroom, 3rd story at west
Issued 12 Feb 2025Notice sent out 13 Feb 2025Walls and ceilings§ 27-2005
Paperwork and notices12 open
The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.
×2File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
2 issued 12 Jun 2025 to 7 May 2026Notice sent outPaperwork and notices
Owner failed to file a valid registration statement with the department as required by adm code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Issued 21 Nov 2025Info notice sent out 20 Nov 2025Paperwork and notices§ 27-2107
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Issued 24 Sept 2025Notice sent out 25 Sept 2025Paperwork and notices§ 27-2045 +2
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Issued 24 Sept 2025Notice sent out 25 Sept 2025Paperwork and notices§ 27-2005
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Issued 24 Sept 2025Notice sent out 25 Sept 2025Paperwork and notices§ 26-1103
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Issued 19 Sept 2025Notice sent out 21 Sept 2025Paperwork and notices§ 27-2005
×2Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
2 issued 12 Feb 2025 to 19 Sept 2025Notice sent outPaperwork and notices§ 26-1103
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Issued 19 Sept 2025Notice sent out 21 Sept 2025Paperwork and notices§ 27-2045 +2
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Issued 12 Feb 2025Notice sent out 13 Feb 2025Paperwork and notices§ 27-2005
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Issued 12 Feb 2025Notice sent out 13 Feb 2025Paperwork and notices§ 27-2046.1
14 closed violations, plus 9 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Trace and repair the source and abate the visible mold condition... less than 10sq.feet at south and west walls in the bathroom, 3rd story at west
Issued 1 Jun 2026Violation closed 30 Sept 2026Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet ceiling in the kitchen, 3rd story at west
Issued 24 Sept 2025Violation closed 23 Jan 2026Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet south wall in the bathroom, 3rd story at west
Issued 24 Sept 2025Violation closed 23 Jan 2026Mold and damp§ 27-2017.3
Provide adequate supply of hot water for the fixtures. in the entire apartment, 1st story at south
Issued 19 Sept 2025Violation closed 24 Oct 2025Heat and hot water§ 27-2024
Replace or repair the self-closing doors that is missing or defective hinges vestibule to public hall, 1st story
Issued 1 May 2025Violation closed 10 Sept 2025Fire and safety equipment§ 27-2005 +3
Trace and repair the source and abate the visible mold condition... less than square 10 feet at ceiling in the kitchen, 3rd story at south
Issued 7 Mar 2025Violation closed 7 Jul 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the kitchen, 3rd story at west
Issued 16 Feb 2025Violation closed 18 Jun 2025Mold and damp§ 27-2017.3
Replace or repair the self-closing doors that is missing or defective door & frame at door to roof at bulkhead at public hall, 3rd story
Issued 16 Feb 2025Violation closed 9 Apr 2025Fire and safety equipment§ 27-2005 +3
Remove the illegal fastening lockable slide bolt at bulkhead door at public hall, 3rd story
Issued 12 Feb 2025Violation closed 9 Apr 2025Doors and windows§ 27-2005 +1
Provide an adequate supply of gas to the fixtures gas range in the kitchen, 3rd story at west
Issued 16 Feb 2025Violation closed 17 Mar 2025Appliances§ 27-2070
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 3rd story at west
Issued 16 Feb 2025Violation closed 11 Mar 2025Heat and hot water§ 27-2028 +1
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at west
Issued 12 Feb 2025Violation closed 9 Mar 2025Heat and hot water§ 27-2029
Remove device preventing door from being self-closing kick down door stopper installed at entrance door at public hall, 1st story
Issued 10 Dec 2023Violation closed 20 Mar 2024Fire and safety equipment§ 27-2005 +1
Remove device preventing door from being self-closing kick down door stopper installed at vestibule door at public hall, 1st story
Issued 10 Dec 2023Violation closed 20 Mar 2024Fire and safety equipment§ 27-2005 +1
132 violations on record in total, 109 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
99 complaints in three years, 18 of them in the last twelve months.
- Heat and hot water1 / 28
- Mold and damp1 / 19
- Pests3 / 14
- Leaks and plumbing3 / 13
- Walls and ceilings1 / 10
- Electrical3 / 3
- Entry, buzzer and mail0 / 2
- Floors and stairs2 / 2
- Doors and windows2 / 2
- Noise0 / 2
- Cooking gas0 / 1
- Roof and outside the building1 / 1
- Garbage and cleanliness1 / 1
- Appliances0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case, all closed.
Heat and Hot Water
Opened 2 Apr 2025
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2024No infested units reported (2022 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
The most recent registration on file for this address expired 31 Aug 2025 and has not been renewed since, so it is more than a full cycle old. Whoever is named below may no longer be responsible for the building.
Owner of record
NATALIA MIL
Public records list NATALIA MIL as the owner of record for this address as of 19 Feb 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
1862 Woodbine Street, Ridgewood, NY 11385
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 14 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There are 9 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There were 3 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2024). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 3 complaints in the last twelve months.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 97 open housing violations: 14 immediately hazardous, 71 hazardous and 12 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for walls and ceilings (28), leaks and plumbing (22) and fire and safety equipment (18).
On 2 Jun 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
It is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.
In the 2025–26 heat season the city received heat or hot-water complaints on 1 day, and HPD issued 0 heat violations.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4034700008 · Block 3470, Lot 8 · Building class C2
