ByTenantsByTenants home

1825 Cornelia Street, Ridgewood, NY 11385

Built 1911 · 3-story walk-up · 6 apartments

2 immediately hazardous violations open. 23 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
232 · 15 · 6
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202264
202320
202471
2025174
2026 so far31

Plus 42 violations from 2011 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 12
  • Heat and hot water 7
  • Mold and damp 7
Open per apartment
3.8 (23 open across 6 apartments)
Inspector last found a problem
6 Apr 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous2 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Provide an adequate supply of heat for the apartment in the 4th room from east, 3rd story at south

    Issued 23 Jan 2025First no access to re- inspect violation 14 Nov 2025Heat and hot water§ 27-2029

  • Abate the infestation consisting of mice in the entire apartment, 1st story at west

    Issued 15 Jan 2025First no access to re- inspect violation 14 Nov 2025Pests§ 27-2017.4

Hazardous15 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • ×2Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 1st story at west

    2 issued 15 Jan 2025 to 6 Apr 2026Notice sent outFloors and stairs§ 27-2005

  • Trace and repair the source and abate the visible mold condition... less than 10sq.feet at ceiling in the bathroom, 1st story at west original violation 18766110 issued 06-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Issued 6 Apr 2026Notice of issuance sent to tenant 4 Aug 2026Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom, 1st story at west

    Issued 6 Apr 2026Notice sent out 6 Apr 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling and south wall in the kitchen, 3rd story at south

    Issued 23 Jan 2025First no access to re- inspect violation 14 Nov 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 3rd story at south

    Issued 23 Jan 2025First no access to re- inspect violation 14 Nov 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tile in the bathroom, 3rd story at south

    Issued 23 Jan 2025First no access to re- inspect violation 14 Nov 2025Floors and stairs§ 27-2005

  • Trace and repair the source and abate the visible mold condition... greater than 10sq ft at ceiling and north wall in the bathroom, 1st story at west

    Issued 15 Jan 2025First no access to re- inspect violation 22 Jun 2025Mold and damp§ 27-2017.3

  • Repair or replace the smoke detector defective in the entire apartment, 1st story at west

    Issued 15 Jan 2025First no access to re- inspect violation 14 Nov 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at west

    Issued 15 Jan 2025First no access to re- inspect violation 14 Nov 2025Fire and safety equipment§ 27-2046.1

  • Properly repair with similar material the broken or defective wood floor near steam riser in the kitchen, 1st story at west

    Issued 15 Jan 2025Notice sent out 15 Jan 2025Heat and hot water§ 27-2005

Show all 15
  • Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom, 1st story at west

    Issued 15 Jan 2025Notice sent out 22 Jan 2025Leaks and plumbing§ 27-2026

  • Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom, 2nd story at east original violation 17085848 issued 01-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 1 Jul 2024First no access to re- inspect violation 22 Jun 2025Mold and damp§ 27-2017.3

  • Abate the nuisance consisting of motion sensor at light fixture, north wall at public hall, 2nd story

    Issued 23 Jun 2024Not complied with 14 Nov 2025Walls and ceilings§ 27-2005 +1

  • Trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling and north wall in the bathroom, 2nd story at east original violation 15363136 issued 08-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 8 Sept 2022Not complied with 3 Aug 2023Mold and damp§ 27-2017.3

Non-hazardous6 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 2nd room from east, 1st story at west

    Issued 15 Jan 2025Notice sent out 15 Jan 2025Walls and ceilings§ 300

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen, 1st story at west

    Issued 15 Jan 2025Notice sent out 15 Jan 2025Walls and ceilings§ 27-2005

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 1st room from east, 1st story at west

    Issued 15 Jan 2025Notice sent out 15 Jan 2025Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 3rd room from east, 1st story at west

    Issued 15 Jan 2025Notice sent out 15 Jan 2025Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at drop ceiling in the 1st room from east, 2nd story at south

    Issued 8 Feb 2018Notice sent out 8 Feb 2018Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at drop ceiling in the 2nd room from east, 2nd story at south

    Issued 8 Feb 2018Notice sent out 8 Feb 2018Walls and ceilings§ 300

64 closed violations, plus 7 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Trace and repair the source and abate the visible mold condition... less than 10sq.feet at ceiling in the bathroom, 1st story at west

    Issued 6 Apr 2026Violation closed 4 Aug 2026Mold and damp§ 27-2017.3

  • Replace or repair the self-closing doors that is missing or defective hinges at fire door to basement at public hall, 1st story

    Issued 12 Nov 2025Violation closed 13 Apr 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at boiler room door, at basement at public hall

    Issued 12 Nov 2025Violation closed 6 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Remove all encumbrances consisting of consisting of household items at public hall, 1st story

    Issued 15 Jan 2025Violation closed 14 Nov 2025Fire and safety equipment§ 27-2005 +1

  • Provide ready access to buildings heating system door locked at 1st story public hall at boiler room, 1st story

    Issued 15 Jan 2025Violation closed 14 Nov 2025Heat and hot water§ 27-2033

  • Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from north, 2nd story at east

    Issued 1 Jul 2024Violation closed 14 Nov 2025Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 2nd story at east

    Issued 1 Jul 2024Violation closed 14 Nov 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 2nd story at east

    Issued 1 Jul 2024Violation closed 14 Nov 2025Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north, 2nd story at east

    Issued 1 Jul 2024Violation closed 14 Nov 2025Floors and stairs§ 27-2005

  • Remove all encumbrances consisting of household items at public hall, 3rd story

    Issued 8 Sept 2022Violation closed 14 Nov 2025Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north, 2nd story at east

    Issued 8 Sept 2022Violation closed 14 Nov 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th room from north, 2nd story at east

    Issued 8 Sept 2022Violation closed 14 Nov 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 2nd story at east

    Issued 8 Sept 2022Violation closed 14 Nov 2025Leaks and plumbing§ 27-2026

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at west

    Issued 15 Jan 2025Violation closed 2 Mar 2025Heat and hot water§ 27-2031

  • Abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at all hotwater fixtures in entire apartment in the kitchen, 3rd story at south

    Issued 23 Jan 2025Violation closed 1 Mar 2025§ 27-2005 +1

  • Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom, 2nd story at east

    Issued 1 Jul 2024Violation closed 29 Oct 2024Mold and damp§ 27-2017.3

  • Abate the nuisance consisting of uncap radiator valve at public hall, 1st story

    Issued 4 Mar 2024Violation dismissed 7 May 2024Heat and hot water§ 27-2005 +1

  • Properly repair with similar material the broken or defective crack marble saddle in the bathroom, 2nd story at east

    Issued 8 Sept 2022Violation closed 3 Aug 2023§ 27-2005

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Issued 30 Apr 2023Violation closed 27 Jul 2023Heat and hot water§ 27-2033

  • Replace or repair the self-closing doors that is missing or defective building entrance door not self closing at public hall, 1st story

    Issued 10 Apr 2023Violation closed 27 Jul 2023Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 3rd story

    Issued 8 Sept 2022Violation closed 27 Jul 2023Walls and ceilings§ 27-2005

  • ×2Paint with light colored paint to the satisfaction of this department at west wall at public hall, 3rd story

    2 issued 1 May 2018 to 8 Sept 2022Violation closedWalls and ceilings§ 27-2013

  • Abate the nuisance consisting of free standing disconnected radiator at public hall, 2nd story

    Issued 8 Sept 2022Violation closed 15 Jun 2023Heat and hot water§ 27-2005 +1

  • Trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling and north wall in the bathroom, 2nd story at east

    Issued 8 Sept 2022Violation closed 13 Jan 2023Mold and damp§ 27-2017.3

  • 2011, 2012 adm code cleanse and disinfect to the satisfaction of this department after removing the sludge and stagnant water from the floor in the cellar at boiler room

    Issued 1 May 2018Violation closed 27 Aug 2020Heat and hot water§ 27-2010

  • Arrange and make self-closing the doors... in the entrance, 2nd story at east

    Issued 1 May 2018Violation closed 27 Aug 2020Fire and safety equipment§ 27-2005 +1

  • Repair the roof so that it will not leak at ceiling at skylight public hall

    Issued 1 May 2018Violation closed 19 Jul 2018Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling at skylight public hall

    Issued 1 May 2018Violation closed 19 Jul 2018Roof and outside the building§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant west wall at public hall, 3rd story

    Issued 1 May 2018Violation closed 19 Jul 2018Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story

    Issued 1 May 2018Violation closed 19 Jul 2018Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Issued 1 May 2018Violation closed 19 Jul 2018Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story

    Issued 1 May 2018Violation closed 19 Jul 2018Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Issued 1 May 2018Violation closed 19 Jul 2018Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant west wall at public hall, 2nd story

    Issued 1 May 2018Violation closed 19 Jul 2018Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at west wall at public hall, 2nd story

    Issued 1 May 2018Violation closed 19 Jul 2018Walls and ceilings§ 27-2013

  • Abate the nuisance consisting of free standing radiator in 1st story public hall

    Issued 20 Apr 2018Violation closed 31 May 2018Heat and hot water§ 27-2005 +1

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Fire and safety equipment§ 27-2046.1

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east, 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east, 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 1st room from east, 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at corner with west and north wall in the 4th room from east, 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector missing, 2nd story at south

    Issued 8 Feb 2018Violation dismissed 13 May 2018Fire and safety equipment§ 27-2045

  • Paint with light colored paint to the satisfaction of this department ceiling bulkhead area

    Issued 30 Apr 2014Violation closed 27 Apr 2016Walls and ceilings§ 27-2013

  • Provide wire screen under skylight at public hall

    Issued 30 Apr 2014Violation closed 13 Aug 2015Roof and outside the building§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant materail ceiling bulkhead area

    Issued 30 Apr 2014Violation closed 13 Aug 2015Walls and ceilings§ 27-2005

  • Make safe by properly repairing the structural defect consisting of 3 damaged wood beams rotten at ceiling at cellar, section at north

    Issued 30 Apr 2014Violation closed 13 Aug 2015Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective furnace cement around flue pipe at boiler room

    Issued 30 Apr 2014Violation closed 13 Aug 2015Heat and hot water§ 27-2005

  • Arrange and make self-closing the doors.. at boiler room

    Issued 30 Apr 2014Violation closed 13 Aug 2015Fire and safety equipment§ 27-2005 +1

  • Paint with light colored paint to the satisfaction of this department ceiling and walls 3rd story public hall

    Issued 30 Apr 2014Violation closed 13 Aug 2015Walls and ceilings§ 27-2013

  • Arrange and make self-closing the doors bulkhead door to roof

    Issued 30 Apr 2014Violation closed 13 Aug 2015Fire and safety equipment§ 27-2005 +1

  • Remove the illegal fastening hasp capable of being padlock bulkhead door to roof

    Issued 30 Apr 2014Violation closed 13 Aug 2015Roof and outside the building§ 27-2005 +1

  • Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Walls and ceilings§ 27-2013

  • Properly repair the broken or defective lower sash counter balance window in the kitchen, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Doors and windows§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Leaks and plumbing§ 27-2026

  • Repair the roof so that it will not leak over ceilng at public hall, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retarding plaster ceiling at public hall, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the kitchen, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Walls and ceilings§ 27-2005

  • Properly repair the broken or defective oven at gas range in the kitchen, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Appliances§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the 3rd room from east, 3rd story

    Issued 31 Mar 2011Violation closed 13 Aug 2015Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over ceiling 3rd story public hall

    Issued 30 Apr 2014Violation closed 5 May 2015Leaks and plumbing§ 27-2005

  • Abate the nuisance consisting of free standing radiator at public hall, 2nd story

    Issued 30 Apr 2014Violation dismissed 1 Jun 2014Heat and hot water§ 27-2005 +1

94 violations on record in total, 23 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

37 complaints in three years, 13 of them in the last twelve months.

  • Leaks and plumbing3 / 6
  • Paperwork and notices6 / 6
  • Walls and ceilings1 / 5
  • Heat and hot water0 / 5
  • Pests0 / 5
  • Mold and damp1 / 4
  • Doors and windows1 / 2
  • Floors and stairs0 / 2
  • Roof and outside the building1 / 1
  • Garbage and cleanliness0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

2 cases, all closed.

  • Tenant Action

    Opened 28 Dec 2017

  • Access Warrant - Non-Lead

    Opened 25 Aug 2014

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 5 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2021No infested units reported (2019 report)
  • 2019No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    AE DUKE MANAGEMENT LLC

    Public records list AE DUKE MANAGEMENT LLC as the registered managing agent for this address as of 17 Jul 2025. Source: HPD registration.

    Other buildings listed under this agent (5 in the records we hold)

    Show 2 more

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    1823-25 CORNELIA STREET, LLC

    Public records list 1823-25 CORNELIA STREET, LLC as the owner of record for this address as of 17 Jul 2025. Source: HPD registration.

    Other buildings listed under this owner (1 in the records we hold)

    No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 2 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There are 4 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 3 complaints in the last twelve months.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4034630038 · Block 3463, Lot 38 · Building class C2