ByTenantsByTenants home

808 Seneca Avenue, Ridgewood, NY 11385

Built 1930 · 3-story walk-up · 6 apartments

6 immediately hazardous violations open. 12 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
126 · 4 · 2
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202281
202300
20244712
202500
2026 so far153

Plus 12 violations from 2015 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Lead paint 23
  • Fire and safety equipment 21
  • Walls and ceilings 14
Open per apartment
2 (12 open across 6 apartments)
Inspector last found a problem
10 Jun 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous6 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the private hallway, 2nd story at south

    Issued 9 Jun 2026Notice sent out 11 Jun 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer, 2nd story at south

    Issued 9 Jun 2026Notice sent out 11 Jun 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the 1st room from north, 2nd story at south

    Issued 9 Jun 2026Notice sent out 11 Jun 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north, 2nd story at south

    Issued 9 Jun 2026Notice sent out 11 Jun 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen, 2nd story at south

    Issued 9 Jun 2026Notice sent out 11 Jun 2026Lead paint§ 27-2056.6

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at south

    Issued 3 Jun 2026Notice of issuance sent to tenant 7 Jun 2026Pests§ 27-2017.4

Hazardous4 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair with similar material the broken or defective wood floor in the 4th room from north, 2nd story at south

    Issued 10 Jun 2026Notice sent out 11 Jun 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 2nd story at south

    Issued 10 Jun 2026Notice sent out 11 Jun 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective laminated wood floor in the 4th room from north, 2nd story at south

    Issued 3 Jun 2026Notice sent out 7 Jun 2026Floors and stairs§ 27-2005

  • Properly repair or replace the broken or defective latch assembly building entrance door, 1st story

    Issued 15 Aug 2024Not complied with 6 Jun 2026Doors and windows§ 27-2005

Non-hazardous2 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department, east wall in the kitchen, 2nd story at south

    Issued 10 Jun 2026Notice sent out 11 Jun 2026Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department, south wall in the 2nd room from north, 2nd story at south

    Issued 10 Jun 2026Notice sent out 11 Jun 2026Walls and ceilings§ 27-2013

Paperwork and notices3 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Issued 7 May 2026Notice sent out 6 May 2026Paperwork and notices

  • Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Issued 4 Apr 2026Not complied with 6 Jun 2026Paperwork and notices§ 27-2104

  • File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Issued 12 Jun 2025First no access to re- inspect violation 11 Jun 2026Paperwork and notices

86 closed violations, plus 21 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the bathroom, 2nd story at south

    Issued 30 Aug 2024Violation closed 12 Oct 2026Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; in the entire apartment, 2nd story at south

    Issued 3 Jun 2026Violation dismissed 15 Sept 2026Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment, 2nd story at south

    Issued 4 Apr 2026Violation dismissed 15 Sept 2026Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 1; in the entire apartment, 3rd story at south

    Issued 22 Aug 2024Violation dismissed 11 Jun 2026Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 2; in the entire apartment, 3rd story at south

    Issued 11 Jul 2024Violation dismissed 11 Jun 2026Fire and safety equipment§ 27-2043.1

  • Replace or repair the self-closing doors that is missing or defective hinges on secondary exit door to public hall in the 1st room from north, 3rd story at south

    Issued 22 Aug 2024Violation closed 10 Jun 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at south

    Issued 22 Aug 2024Violation closed 10 Jun 2026Fire and safety equipment§ 27-2005 +3

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustical tile ceiling in the 1st room from north, 2nd story at south

    Issued 15 Aug 2024Violation closed 7 Jun 2026Walls and ceilings§ 300

  • Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall. in the bathroom, 2nd story at west

    Issued 12 Mar 2026Violation closed 6 Jun 2026Mold and damp§ 27-2017.3

  • Remove the illegal double cylinder key operated locking device at door, in the entrance, 2nd story at south

    Issued 5 Mar 2026Violation closed 6 Jun 2026Doors and windows§ 27-2005

  • Properly repair the source and abate the evidence of a water leak south wall south wall in the bathroom, 2nd story at south

    Issued 31 Aug 2024Violation closed 6 Jun 2026Leaks and plumbing§ 27-2026

  • Remove all encumbrances consisting of household items at public hall, 1st story

    Issued 15 Aug 2024Violation closed 6 Jun 2026Fire and safety equipment§ 27-2005 +1

  • Remove all encumbrances consisting of household items at public hall, 2nd story

    Issued 15 Aug 2024Violation closed 6 Jun 2026Fire and safety equipment§ 27-2005 +1

  • Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling, west, north and east wall in the bathroom, 2nd story at south

    Issued 5 Mar 2026Violation dismissed 28 May 2026Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom, 2nd story at south

    Issued 5 Mar 2026Violation dismissed 28 May 2026Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 2nd story at south

    Issued 5 Mar 2026Violation closed 4 Apr 2026Fire and safety equipment§ 27-2005 +3

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway, 2nd story at south

    Issued 31 Aug 2024Violation closed 17 Mar 2026Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the bathroom, 2nd story at south

    Issued 15 Aug 2024Violation dismissed 23 Feb 2025Fire and safety equipment§ 27-2043.1

  • Trace and repair the source and abate the visible mold condition... less than 10 square feet at west wall west wall in the bathroom, 2nd story at south

    Issued 31 Aug 2024Violation dismissed 22 Dec 2024Mold and damp§ 27-2017.3

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st door from north at east wall, 1st window frame from north at east wall in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the kitchen, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at west wall in the private hallway, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 2nd closet from west at north wall door frame in the private hallway, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) chair rails at south wall in the foyer, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the 2nd room from east, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 2nd door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from north at east wall, north wall in the foyer, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall in the 2nd room from east, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 16 Dec 2024Lead paint§ 27-2056.6

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at south

    Issued 6 Jun 2019Violation closed 5 Sept 2024Pests§ 27-2017.4

  • ×2Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at south

    2 issued 11 Jul 2024Violation closedFire and safety equipment§ 27-2046.1

  • ×2Repair or replace the smoke detector missing in the entire apartment, 3rd story at south

    2 issued 11 Jul 2024Violation closedFire and safety equipment§ 27-2045

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at west

    Issued 13 May 2024Violation closed 16 Aug 2024Lead paint§ 27-2056.7 +2

  • Remove the illegal fastening self lockable panic bar installed on bulkhead door to roof at public hall, 3rd story

    Issued 11 Jul 2024Violation closed 15 Aug 2024Roof and outside the building§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges on bulkhead door to roof at public hall, 3rd story

    Issued 11 Jul 2024Violation closed 15 Aug 2024Fire and safety equipment§ 27-2005 +3

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Issued 10 Jun 2024Violation closed 15 Aug 2024Heat and hot water§ 27-2033

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2013

  • ×2Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the kitchen, 2nd story at west

    2 issued 13 May 2024Violation closedHeat and hot water§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall in the bathroom, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Heat and hot water§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at east wall, ceiling in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Leaks and plumbing§ 27-2026

  • ×2Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 1st door frame from south at west wall in the 2nd room from east, 2nd story at west

    2 issued 13 May 2024Violation closedDoors and windows§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Heat and hot water§ 27-2005

  • Properly secure the loose light fixture at ceiling in the 2nd room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at west wall and ceiling in the 2nd room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Electrical§ 27-2005

  • Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Electrical§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall and ceiling in the private hallway, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Electrical§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the foyer, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Electrical§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall and ceiling in the kitchen, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Electrical§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall, chair rails at north wall in the foyer, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Doors and windows§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 2nd closet from west at north wall door, baseboard at north wall in the private hallway, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Doors and windows§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Fire and safety equipment§ 27-2005 +3

  • Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also heavy duty deadbolt locking device on door in the entrance, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Doors and windows§ 27-2043

  • Replace or repair the self-closing doors that is missing or defective hindges on door, 2nd means of egress in the 1st room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Fire and safety equipment§ 27-2005 +3

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 4th room from east, 2nd story at west

    Issued 13 May 2024Violation closed 15 Aug 2024Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation heat riser in the bathroom, 2nd story at south

    Issued 6 Jun 2019Violation closed 15 Aug 2024Heat and hot water§ 27-2005

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system.. at public hall, 1st story

    Issued 31 Oct 2017Violation closed 15 Aug 2024Heat and hot water§ 27-2033

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 3 in the entire apartment, 2nd story at west

    Issued 13 May 2024Violation dismissed 1 Aug 2024Fire and safety equipment§ 27-2043.1

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at west

    Issued 13 May 2024Violation dismissed 1 Aug 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from north, 3rd story at south

    Issued 14 May 2022Violation closed 24 Jul 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, west wall in the foyer, 3rd story at south

    Issued 14 May 2022Violation closed 24 Jul 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen, 3rd story at south

    Issued 14 May 2022Violation closed 24 Jul 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the bathroom, 3rd story at south

    Issued 14 May 2022Violation closed 24 Jul 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 2nd door frame from east at south wall, north wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north, 3rd story at south

    Issued 14 May 2022Violation closed 24 Jul 2024Lead paint§ 27-2056.6

  • Repair or replace the carbon monoxide detecting device(s).,missing in the entire apartment, 3rd story at south

    Issued 14 May 2022Violation dismissed 17 Aug 2022Fire and safety equipment§ 27-2046.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 3rd story at south

    Issued 14 May 2022Violation dismissed 17 Aug 2022Fire and safety equipment§ 27-2043.1

  • Repair or replace the smoke detector,missing in the entire apartment, 3rd story at south

    Issued 14 May 2022Violation dismissed 17 Aug 2022Fire and safety equipment§ 27-2045

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north, 3rd story at south

    Issued 14 May 2022Violation dismissed 17 Aug 2022Walls and ceilings§ 27-2013

  • Trace and repair the source and abate the visible mold condition... atceiling and west wall in the bathroom, 2nd story at south

    Issued 6 Jun 2019Violation closed 23 Jan 2020Mold and damp§ 27-2017.3

  • Abate the infestation consisting of bedbugs in the entire apartment, 2nd story at south

    Issued 6 Jun 2019Violation dismissed 3 Sept 2019Pests§ 27-2017.4

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom, 2nd story at south

    Issued 6 Jun 2019Violation dismissed 3 Sept 2019Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at south

    Issued 6 Jun 2019Violation dismissed 3 Sept 2019Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at south

    Issued 6 Jun 2019Violation dismissed 3 Sept 2019Fire and safety equipment§ 27-2046.1

  • Abate the nuisance consisting of mice, 1st story at west

    Issued 11 Sept 2015Violation dismissed 17 Dec 2017Pests§ 27-2018

  • Repair or replace the carbon monoxide detecting device(s). missing, 1st story at west

    Issued 11 Sept 2015Violation dismissed 17 Dec 2017Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective, 1st story at west

    Issued 11 Sept 2015Violation dismissed 17 Dec 2017Fire and safety equipment§ 27-2045

  • Abate the nuisance consisting of roaches, 1st story at west

    Issued 11 Sept 2015Violation dismissed 17 Dec 2017Pests§ 27-2018

122 violations on record in total, 15 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

12 complaints in three years, 2 of them in the last twelve months.

  • Electrical0 / 4
  • Walls and ceilings0 / 3
  • Pests1 / 2
  • Entry, buzzer and mail0 / 1
  • Leaks and plumbing0 / 1
  • Noise1 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2024No infested units reported (2022 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record

    VIOREL FERA

    Public records list VIOREL FERA as the owner of record for this address as of 7 Dec 2025. Source: HPD registration.

    Other buildings listed under this owner (1 in the records we hold)

    No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 6 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. The city recorded 4 mould violations here, most recently in 2026, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. There was 1 pest complaint here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2024). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1930 and has 5 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4034610029 · Block 3461, Lot 29 · Building class C2