1726 Woodbine Street, Ridgewood, NY 11385
Built 1930 · 3-story walk-up · 6 apartments
14 immediately hazardous violations open. 55 open in all.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 5514 · 32 · 9
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 35 | 16 |
| 2023 | 18 | 18 |
| 2024 | 77 | 18 |
| 2025 | 3 | 0 |
| 2026 so far | 0 | 0 |
Plus 225 violations from 2005 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Mold and damp 44
- Walls and ceilings 37
- Leaks and plumbing 33
- Open per apartment
- 9.2 (55 open across 6 apartments)
- Inspector last found a problem
- 9 Dec 2025 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 0 days, and inspectors issued 2 violations.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 0 | 0 | 2 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThis building is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous14 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at north
Issued 9 Dec 2025Notice sent out 9 Dec 2025Heat and hot water§ 27-2029
Provide hot water at all hot water fixtures in the entire apartment, 1st story at north
Issued 9 Dec 2025Notice sent out 9 Dec 2025Heat and hot water§ 27-2031
Abate the infestation consisting of roaches at public hall, 1st story
Issued 17 Oct 2024Notice sent out 17 Oct 2024Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 2nd story at east
Issued 16 Aug 2024First no access to re- inspect violation 28 May 2025Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 3rd story at east
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Pests§ 27-2017.4
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from north, 3rd story at west
Issued 5 Apr 2016Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from north, 1st story at east
Issued 24 Jan 2008Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom, 2nd story at west
Issued 1 Jun 2007Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the 1st room from east, 1st story at north
Issued 26 Dec 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 2nd closet from north at east wall door, 3rd closet from north at east wall door in the 3rd room from north, 2nd story at west
Issued 23 Jul 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Show all 14Show fewer
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 2nd door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north, 2nd story at west
Issued 23 Jul 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom, 2nd story at west
Issued 23 Jul 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall, east wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen, 2nd story at west
Issued 23 Jul 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, east wall, west wall in the 2nd room from north, 2nd story at west
Issued 23 Jul 2006Defect letter issued 22 May 2025Lead paint§ 27-2056.6
Hazardous32 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Remove all encumbrances consisting of bike at public hall, 2nd story
Issued 28 May 2025Notice sent out 29 May 2025Fire and safety equipment§ 27-2005 +1
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling at cellar west at cellar, 1st story original violation 17378829 issued 27-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 27 Oct 2024First no access to re- inspect violation 22 Jun 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling at an apartment at basement original violation 17353238 issued 17-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 17 Oct 2024Defect letter issued 22 May 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in lower level bathroom in the bathroom, 1st story at west original violation 17268316 issued 13-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Sept 2024Defect letter issued 22 May 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 4th room from north, 1st story at west original violation 17268313 issued 13-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Sept 2024First no access to re- inspect violation 4 May 2025Mold and damp§ 27-2017.3
Properly repair the source and abate the evidence of a water leak ceiling in the 4th room from north, 1st story at west
Issued 13 Sept 2024Notice sent out 15 Sept 2024Leaks and plumbing§ 27-2026
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the 2nd room from north, 1st story at west original violation 17242922 issued 03-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 3 Sept 2024First no access to re- inspect violation 4 May 2025Mold and damp§ 27-2017.3
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen, 1st story at west
Issued 3 Sept 2024Notice sent out 3 Sept 2024Leaks and plumbing§ 27-2026
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 1st room from east, 1st story at south original violation 17223894 issued 26-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 26 Aug 2024First no access to re- inspect violation 4 May 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approximately 4 sqft at ceiling in the 1st bathroom from east, 3rd story at east original violation 16162471 issued 10-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 10 Aug 2023First no access to re- inspect violation 28 Sept 2024Mold and damp§ 27-2017.3
Show all 32Show fewer
Trace and repair the source and abate the visible mold condition... approximately 4 sqft at ceiling at laundry closet, 3rd story at south original violation 16162387 issued 10-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 10 Aug 2023First no access to re- inspect violation 28 Sept 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approximately 1 sqft at ceiling in the 2nd room from east, 3rd story at south original violation 16162413 issued 10-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 10 Aug 2023First no access to re- inspect violation 28 Sept 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approximately 1 sqft at ceiling in the 1st room from east at center, 3rd story at east original violation 16162434 issued 10-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 10 Aug 2023First no access to re- inspect violation 28 Sept 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approximately 4 sqft at ceiling in the 2nd bathroom from east, 3rd story at south original violation 16162383 issued 10-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 10 Aug 2023First no access to re- inspect violation 28 Sept 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 1 square feet at ceiling in the 2nd room from north at west, 3rd story at south original violation 15204609 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 2 square feet at ceiling in the closet in the kitchen, 3rd story at south original violation 15204607 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 2 square feet at ceiling in the kitchen, 3rd story at south original violation 15204604 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 1 square feet at ceiling in the 2nd room from north at center, 3rd story at south original violation 15204620 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 4 square feet at ceiling in the 2nd bathroom from north, 3rd story at south original violation 15204624 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 4 square feet at ceiling in the 1st bathroom from north, 3rd story at south original violation 15204601 issued 13-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Jun 2022Defect letter issued 22 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... 4 square feet ceiling in the 2nd bathroom, 3rd story at east original violation 14817996 issued 11-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... 6 square feet at ceiling in the 1st bathroom, 3rd story at east original violation 14817991 issued 11-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... 7 square feet ceiling in the 2nd room from east, 3rd story at east original violation 14817993 issued 11-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... 3 square feet ceiling in the 1st room from east at north, 3rd story at east original violation 14817999 issued 11-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... 4 square feet ceiling in the 1st room from east at south, 3rd story at east original violation 14818000 issued 11-feb-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 11 Feb 2022Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... at ceiling in the 1st room from north, 1st story at west original violation 14585239 issued 28-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 28 Sept 2021Defect letter issued 15 Aug 2024Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... at bathroom ceiling at cellar original violation 14585242 issued 28-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 28 Sept 2021Defect letter issued 22 May 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... at ceiling at cellar original violation 14559221 issued 17-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 17 Sept 2021Defect letter issued 22 May 2025Mold and damp§ 27-2017.3
Abate the nuisance consisting of sleeping in cellar
Issued 15 Dec 2020Not complied with 15 Aug 2024§ 27-2005 +1
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections wash basin and water closet
Issued 15 Dec 2020Not complied with 15 Aug 2024Leaks and plumbing§ 27-2081
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at water closet and wash basin at front cellar at west at cellar
Issued 12 Sept 2019Not complied with 15 Aug 2024Leaks and plumbing§ 27-2081
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at water closet and wash basin at cellar at east at cellar
Issued 12 Sept 2019Not complied with 15 Aug 2024Leaks and plumbing§ 27-2081
Non-hazardous9 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration electric stove being use for cooking instead of a gas stove in the kitchen, 1st story at south
Issued 27 Oct 2024Notice sent out 6 Nov 2024Appliances§ 300
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen, 1st story at south
Issued 27 Oct 2024Notice sent out 27 Oct 2024Walls and ceilings§ 27-2013
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration opening created at floor with staircase erected to create duplex apartment between an apartment and cellar at cellar, 1st story
Issued 27 Oct 2024Notice sent out 6 Nov 2024Floors and stairs§ 300
Properly repair the source and abate the evidence of a water leak ceiling and west wall in the kitchen, 1st story at west
Issued 17 Oct 2024Notice sent out 17 Oct 2024Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen, 2nd story at east
Issued 16 Aug 2024First no access to re- inspect violation 28 May 2025Walls and ceilings§ 27-2005
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration opening at floor created and staircase erected leading to cellar, creating a duplex apartment at 1st story east an apartment
Issued 12 Sept 2019Not complied with 15 Aug 2024Floors and stairs§ 300
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition walls erected creating rooms for living being used inconjuntion with apartment first story east an apartment
Issued 12 Sept 2019Not complied with 15 Aug 2024Walls and ceilings§ 300
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration opening at floor created and staircase erected leading to cellar, creating a duplex apartment at 1st story west an apartment
Issued 12 Sept 2019Not complied with 15 Aug 2024Floors and stairs§ 300
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition walls erected creating rooms for living being used inconjuntion with apartment first story west an apartment
Issued 12 Sept 2019Not complied with 15 Aug 2024Walls and ceilings§ 300
355 closed violations, plus 27 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Abate the infestation consisting of rodents yard
Issued 13 Sept 2024Violation closed 2 Jun 2025Pests§ 27-2017.4
×7Abate the infestation consisting of mice in the entire apartment, 1st story at west
7 issued 12 Dec 2021 to 13 Sept 2024Violation closedPests§ 27-2017.4
Abate the infestation consisting of rodents rats front yard
Issued 13 Sept 2024Violation closed 2 Jun 2025Pests§ 27-2017.4
×4Abate the infestation consisting of mice in the entire apartment, 1st story at south
4 issued 1 Sept 2021 to 9 Sept 2024Violation closedPests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 1st story at north
Issued 20 Dec 2021Violation closed 2 Jun 2025Pests§ 27-2017.4
×2Abate the infestation consisting of mice in the entire apartment, 1st story at north
2 issued 17 Sept 2021 to 20 Dec 2021Violation closedPests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 1st story at west
Issued 14 Dec 2021Violation closed 2 Jun 2025Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment lower level, 1st story at west
Issued 13 Dec 2021Violation closed 2 Jun 2025Pests§ 27-2017.4
Properly repair the source and abate the evidence of a water leak ceiling, west wall in the 3rd room from north, 1st story at west
Issued 17 Oct 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 1st story at west
Issued 17 Oct 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 3rd room from north, 1st story at west
Issued 17 Oct 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Abate the infestation consisting of vermin flys in the entire apartment, 1st story at west
Issued 17 Oct 2024Violation closed 22 May 2025Pests§ 27-2017.4
Abate the infestation consisting of vermin flies court
Issued 13 Sept 2024Violation closed 22 May 2025Pests§ 27-2017.4
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in lower level bathroom in the bathroom, 1st story at west
Issued 13 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
×2Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 1st story at west
2 issued 13 Aug 2024 to 13 Sept 2024Violation closedWalls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen, 1st story at west
Issued 13 Sept 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 4th room from north, 1st story at west
Issued 13 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Issued 13 Sept 2024Violation closed 22 May 2025Heat and hot water§ 27-2033
Cleanse to the satisfaction of this department the rubbbish 1st yard from north
Issued 13 Sept 2024Violation closed 22 May 2025Roof and outside the building§ 27-2011
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at west
Issued 13 Sept 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2046.1
×4Abate the infestation consisting of vermin flies in the entire apartment, 1st story at west
4 issued 12 Jun 2024 to 13 Sept 2024Violation closedPests§ 27-2017.4
Properly repair the source and abate the evidence of a water leak at ceiling in lower level bathroom in the bathroom, 1st story at west
Issued 13 Sept 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north, 1st story at south
Issued 9 Sept 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from north, 1st story at south
Issued 9 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen, 1st story at south
Issued 9 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north, 1st story at south
Issued 9 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at south
Issued 9 Sept 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2046.1
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from east, 1st story at south
Issued 6 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east, 1st story at south
Issued 6 Sept 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
×2Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from east, 1st story at south
2 issued 26 Aug 2024 to 6 Sept 2024Violation closedLeaks and plumbing§ 27-2026
×2Abate the infestation consisting of vermin flies in the entire apartment, 1st story at south
2 issued 26 Aug 2024 to 6 Sept 2024Violation closedPests§ 27-2017.4
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east, 1st story at south
Issued 6 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north, 1st story at west
Issued 3 Sept 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard, 1st story
Issued 26 Aug 2024Violation closed 22 May 2025Garbage and cleanliness§ 27-2010
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north walls in the 2nd room from east, 1st story at south
Issued 26 Aug 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling and south wall in the 1st room from east, 1st story at south
Issued 26 Aug 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance, 3rd story at west
Issued 22 Aug 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2005 +3
Abate the nuisance consisting of offensive order at cellar story leading to building front entrance
Issued 15 Aug 2024Violation closed 22 May 2025§ 27-2005 +1
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder in landing position at rear yard
Issued 15 Aug 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2005
Abate the nuisance consisting of wire tied to dropp ladder at fire escape at rear yard
Issued 15 Aug 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2005 +1
2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Issued 15 Aug 2024Violation closed 22 May 2025Garbage and cleanliness§ 27-2010
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen, 1st story at west
Issued 13 Aug 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east, 1st story at west
Issued 13 Aug 2024Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east, 1st story at west
Issued 13 Aug 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective electrical light fixture at ceiling at public hall, 1st story
Issued 11 Aug 2024Violation closed 22 May 2025Electrical§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east, 1st story at south
Issued 10 Aug 2024Violation closed 22 May 2025Walls and ceilings§ 27-2005
Abate the infestation consisting of vermin fleas in the entire apartment, 1st story at south
Issued 10 Aug 2024Violation closed 22 May 2025Pests§ 27-2017.4
Abate the infestation consisting of vermin fleas in the entire apartment, 1st story at east
Issued 7 Aug 2024Violation closed 22 May 2025Pests§ 27-2017.4
Remove all encumbrances consisting of household items, bikes, and shoes at public hall, 3rd story
Issued 30 Jul 2024Violation closed 22 May 2025Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective brick and mortar joints, basement, at building front
Issued 30 Jul 2024Violation closed 22 May 2025§ 27-2005
Abate the infestation consisting of vermin flies at basement
Issued 12 Jun 2024Violation closed 22 May 2025Pests§ 27-2017.4
Abate the infestation consisting of vermin consisting of flies in the entire apartment, 1st story at west
Issued 1 Jun 2024Violation closed 22 May 2025Pests§ 27-2017.4
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Issued 10 Aug 2023Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair the roof so that it will not leak at ceiling at laundry closet, 3rd story at south
Issued 10 Aug 2023Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair the roof so that it will not leak over ceiling in the 2nd bathroom from east, 3rd story at south
Issued 10 Aug 2023Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Fire and safety equipment§ 27-2046.1
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from north, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling in the 2nd bathroom from north, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the closet in the kitchen, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the roof so that it will not leak over ceiling in the 1st bathroom from north, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from north, 3rd story at south
Issued 13 Jun 2022Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at ceiling in the 1st bathroom, 3rd story at east
Issued 11 Feb 2022Violation closed 22 May 2025Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. at lower level. in the bathroom, 1st story at west
Issued 20 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall. in the 4th room from north, 1st story at west
Issued 14 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north lower level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north lower level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north upper level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the broken or defective mechanical ventilation system in the 2nd bathroom lower level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 2nd bathroom lower level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 2nd bathroom lower level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from north upper level, 1st story at west
Issued 13 Dec 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east, 1st story at south
Issued 6 Dec 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east, 1st story at south
Issued 6 Dec 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at lower level in the bathroom, 1st story at south
Issued 11 Nov 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east, 1st story at south
Issued 11 Nov 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling lower level in the 2nd bathroom from north, 1st story at south
Issued 1 Sept 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling,lower level in the 2nd bathroom from north, 1st story at south
Issued 1 Sept 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak over ceiling in basement bathroom in the bathroom, 1st story at south
Issued 28 May 2021Violation closed 22 May 2025Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 1st story at south
Issued 28 May 2021Violation closed 22 May 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling at cellar west at cellar, 1st story
Issued 27 Oct 2024Violation closed 6 Mar 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling at an apartment at basement
Issued 17 Oct 2024Violation closed 14 Feb 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in lower level bathroom in the bathroom, 1st story at west
Issued 13 Sept 2024Violation closed 14 Jan 2025Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 4th room from north, 1st story at west
Issued 13 Sept 2024Violation closed 14 Jan 2025Mold and damp§ 27-2017.3
Remove all encumbrances consisting of household items and bicycles at public hall, 3rd story
Issued 13 Sept 2024Violation dismissed 1 Jan 2025Fire and safety equipment§ 27-2005 +1
Showing the 100 most recent of 355.
437 violations on record in total, 55 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
111 complaints in three years, 8 of them in the last twelve months.
- Pests0 / 45
- Garbage and cleanliness0 / 16
- Leaks and plumbing6 / 16
- Walls and ceilings0 / 8
- Mold and damp1 / 8
- Fire and safety equipment0 / 6
- Doors and windows0 / 3
- Heat and hot water0 / 3
- Construction and illegal work0 / 3
- Electrical1 / 1
- Floors and stairs0 / 1
- Noise0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
6 cases, all closed.
Tenant Action/Harassment
Opened 16 Sept 2024No harassment found
Tenant Action/Harassment
Opened 27 Jul 2023
Heat and Hot Water
Opened 7 Mar 2022
Access Warrant - Non-Lead
Opened 22 Nov 2021
Heat and Hot Water
Opened 21 Apr 2021
Tenant Action
Opened 30 Mar 2021
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 5 earlier reportsShow fewer
- 2024No infested units reported (2023 report)
- 2023No infested units reported (2022 report)
- 2023No infested units reported (2021 report)
- 2021No infested units reported (2019 report)
- 2019No infested units reported (2017 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
AE DUKE MANAGMENT
Public records list AE DUKE MANAGMENT as the registered managing agent for this address as of 17 Jul 2025. Source: HPD registration.
Owner of record
1726 WOODBINE PORTFOLIO, LLC
Public records list 1726 WOODBINE PORTFOLIO, LLC as the owner of record for this address as of 17 Jul 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
1726 Woodbine Street, Ridgewood, NY 11385
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 14 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There are 25 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- This building dates from 1930 and has 9 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 55 open housing violations: 14 immediately hazardous, 32 hazardous and 9 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for mold and damp (44), walls and ceilings (37) and leaks and plumbing (33).
On 9 Dec 2025. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
It is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.
In the 2025–26 heat season the city received heat or hot-water complaints on 0 days, and HPD issued 2 heat violations.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4034570025 · Block 3457, Lot 25 · Building class C2
