ByTenantsByTenants home

1701 Woodbine Street, Ridgewood, NY 11385

Built 1930 · 4-story walk-up · 16 apartments

36 immediately hazardous violations open. 66 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
6636 · 27 · 3
Public record
Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
2022264
202330
2024321
202500
2026 so far10

Plus 118 violations from 2006 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 20
  • Doors and windows 19
  • Walls and ceilings 14
Open per apartment
4.1 (66 open across 16 apartments)
Inspector last found a problem
4 Jan 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 4 days.

WinterDaysComplaintsViolations
2025–26450

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous36 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 4th story at north

    Issued 20 Nov 2024Notice sent out 24 Nov 2024Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective west 1 window lower sash glass in the 5th room from north, 3rd story at south

    Issued 20 Nov 2024Notice sent out 24 Nov 2024Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective fire escape window lower sash counter balance in the 5th room from north, 3rd story at south

    Issued 20 Nov 2024Notice sent out 24 Nov 2024Fire and safety equipment§ 27-2005

  • Properly repair or replace the broken or defective west 1 window upper sash glass in the 1st room from north, 3rd story at south

    Issued 20 Nov 2024Notice sent out 24 Nov 2024Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at south

    Issued 20 Nov 2024Certification postponment denied 9 Dec 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective frame and latch in the entrance, 4th story at north

    Issued 20 Nov 2024Certification postponment denied 9 Dec 2024Fire and safety equipment§ 27-2005 +3

  • Trace and repair the source and abate the visible mold condition... greater than 30sq feet at ceiling,north wall,south wall,east wall,west wall in the bathroom, 4th story at north

    Issued 20 Nov 2024Notice of issuance sent to tenant 24 Nov 2024Mold and damp§ 27-2017.3

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment, 3rd story at north

    Issued 5 Jul 2024Violation will be reinspected 17 Nov 2024Fire and safety equipment§ 27-2043.1

  • ×2Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    2 issued 24 Sept 2021 to 30 Nov 2022Notice sent outLead paint§ 27-2056.4

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 30 Nov 2022Notice sent out 29 Jan 2023Lead paint§ 27-2056.7

Show all 36
  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st dumb waiter from west at north wall in the foyer, 4th story at east

    Issued 8 Apr 2022Certification postponment denied 4 May 2022Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from east at north, 4th story at east

    Issued 8 Apr 2022Certification postponment denied 4 May 2022Lead paint§ 27-2056.6

  • Abate the infestation consisting of mice in the entire apartment, 4th story at east

    Issued 8 Apr 2022Notice of issuance sent to tenant 12 Apr 2022Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 3rd story at north

    Issued 7 Oct 2021Defect letter issued 14 Aug 2024Lead paint§ 27-2056.6

  • Abate the infestation consisting of roaches, 3rd story at north

    Issued 7 Oct 2021Defect letter issued 21 Nov 2024Pests§ 27-2017.4

  • Abate the infestation consisting of mice, 3rd story at north

    Issued 7 Oct 2021Defect letter issued 21 Nov 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen, 3rd story at north

    Issued 7 Oct 2021Defect letter issued 14 Aug 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from north, 3rd story at north

    Issued 7 Oct 2021Certification postponment denied 4 Nov 2021Lead paint§ 27-2056.6

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 22 Jul 2021Notice sent out 12 Sept 2021Lead paint§ 27-2056.4 +1

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at west

    Issued 10 Jun 2021Defect letter issued 21 Nov 2024Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at west

    Issued 10 Jun 2021Defect letter issued 21 Nov 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from north, 3rd story at north

    Issued 10 Jun 2020Notice sent out 11 Jun 2020Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom, 3rd story at north

    Issued 10 Jun 2020Defect letter issued 14 Aug 2024Lead paint§ 27-2056.6

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at north

    Issued 10 Jun 2020Defect letter issued 21 Nov 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the kitchen, 3rd story at north

    Issued 10 Jun 2020Defect letter issued 14 Aug 2024Lead paint§ 27-2056.6

  • Trace and repair the source and abate the visible mold condition... approx 40 square feet at all walls in the bathroom, 1st story at west

    Issued 26 Mar 2019Defect letter issued 1 Dec 2024Mold and damp§ 27-2017.3

  • Abate the infestation consisting of mice in the entire apartment, 1st story at west

    Issued 26 Mar 2019Defect letter issued 1 Dec 2024Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at north

    Issued 13 Mar 2019Defect letter issued 1 Dec 2024Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 1st story at north

    Issued 13 Mar 2019Defect letter issued 1 Dec 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the bathroom, 2nd story at north

    Issued 10 Nov 2009First no access to re- inspect violation 1 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway, 2nd story at north

    Issued 10 Nov 2009First no access to re- inspect violation 1 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd bathroom from north, 2nd story at north

    Issued 25 Jul 2006Defect letter issued 1 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom, 6th story at south

    Issued 28 Jun 2006Not complied with 21 Nov 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st dumb waiter from south at west wall in the private hallway, 2nd story at north

    Issued 26 May 2006Defect letter issued 1 Dec 2024Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the bathroom, 2nd story at north

    Issued 26 May 2006Defect letter issued 1 Dec 2024Lead paint§ 27-2056.6

Hazardous27 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color pls give the stop as correction at public hall, 1st story

    Issued 4 Jan 2026Notice sent out 4 Jan 2026Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 1st story at south

    Issued 27 Nov 2024Notice sent out 2 Dec 2024Floors and stairs§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at east

    Issued 1 Feb 2023Notice sent out 2 Feb 2023Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at east

    Issued 1 Feb 2023Notice sent out 2 Feb 2023Lead paint§ 27-2056.7 +2

  • Repair the roof so that it will not leak at ceiling in the 2nd room from east at north, 4th story at east

    Issued 8 Apr 2022Notice sent out 11 Apr 2022Leaks and plumbing§ 27-2005

  • Properly repair the broken or defective bell / buzzer at east wall in the foyer, 4th story at east

    Issued 8 Apr 2022Notice sent out 12 Apr 2022Entry, buzzer and mail§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall in the foyer, 4th story at east

    Issued 8 Apr 2022Notice sent out 11 Apr 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north, 4th story at east

    Issued 8 Apr 2022Notice sent out 11 Apr 2022Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of key operated lock installed at door in the room leading to fire escape window in the 1st room from east at south, 4th story at east

    Issued 8 Apr 2022Notice sent out 12 Apr 2022Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen, 4th story at east

    Issued 8 Apr 2022Notice sent out 12 Apr 2022Walls and ceilings§ 27-2005

Show all 27
  • Repair the roof so that it will not leak at ceiling in the kitchen, 4th story at east

    Issued 8 Apr 2022Notice sent out 12 Apr 2022Leaks and plumbing§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at south

    Issued 7 Oct 2021Certification postponment granted 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at north

    Issued 30 Sept 2021Certification postponment granted 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north

    Issued 30 Sept 2021Certification postponment granted 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at north

    Issued 24 Sept 2021Certification postponment denied 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at south

    Issued 24 Sept 2021Certification postponment denied 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at north

    Issued 24 Sept 2021Certification postponment denied 4 Nov 2021Lead paint§ 27-2056.7 +1

  • Trace and repair the source and abate the visible mold condition... 1 sq ft at ceiling in the bathroom, 3rd story at west original violation 14385731 issued 10-jun-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 10 Jun 2021Defect letter issued 21 Nov 2024Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom, 1st story at west

    Issued 26 Mar 2019Notice sent out 26 Mar 2019Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... approx 25 square feet at all walls in the bathroom, 1st story at north

    Issued 13 Mar 2019Defect letter issued 1 Dec 2024Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective.. in the entrance, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Fire and safety equipment§ 27-2005 +2

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & all walls in the 1st room from north, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from north, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective.. in the entrance, 1st story at north

    Issued 27 Oct 2018Not complied with 1 Dec 2024Fire and safety equipment§ 27-2005 +2

  • Replace or repair the self-closing doors that is missing or defective at the entrance to apartment, 1st story at east

    Issued 26 Aug 2015Not complied with 1 Dec 2024Fire and safety equipment§ 27-2005 +2

Non-hazardous3 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 1st room from east at south, the kitchen, the private hallway, 4th story at east

    Issued 8 Apr 2022Notice sent out 12 Apr 2022Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the foyer, 4th story at east

    Issued 8 Apr 2022Notice sent out 11 Apr 2022Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all window frames in the entire apartment, 2nd story at north

    Issued 31 Oct 2018Notice sent out 4 Nov 2018Doors and windows§ 27-2013

119 closed violations, plus 10 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Properly secure the loose electrical light fixture at ceiling in the bathroom, 4th story at north

    Issued 20 Nov 2024Violation dismissed 24 Mar 2025Electrical§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom, 4th story at north

    Issued 20 Nov 2024Violation dismissed 24 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 4th story at north

    Issued 20 Nov 2024Violation dismissed 24 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north, 4th story at north

    Issued 20 Nov 2024Violation dismissed 24 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer, 4th story at north

    Issued 20 Nov 2024Violation dismissed 24 Mar 2025Walls and ceilings§ 27-2005

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment, 1st story at south

    Issued 27 Nov 2024Violation dismissed 16 Mar 2025Fire and safety equipment§ 27-2043.1

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 1st story at south

    Issued 27 Nov 2024Violation dismissed 16 Mar 2025Doors and windows§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at south

    Issued 20 Nov 2024Violation dismissed 9 Mar 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 4th story at north

    Issued 20 Nov 2024Violation dismissed 9 Mar 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing in the entire apartment, 4th story at north

    Issued 20 Nov 2024Violation dismissed 9 Mar 2025Fire and safety equipment§ 27-2045

  • Repair or replace the smoke detector missing in the entire apartment, 3rd story at south

    Issued 20 Nov 2024Violation dismissed 9 Mar 2025Fire and safety equipment§ 27-2045

  • Properly repair or replace the broken or defective west 2 window lower sash counter balance in the 4th room from north, 3rd story at south

    Issued 20 Nov 2024Violation dismissed 9 Mar 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 1st story at north

    Issued 27 Nov 2024Violation dismissed 2 Mar 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 2nd story at north

    Issued 27 Nov 2024Violation dismissed 2 Mar 2025Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective latch in the entrance, 1st story at south

    Issued 27 Nov 2024Violation dismissed 2 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch in the entrance, 1st story at north

    Issued 27 Nov 2024Violation dismissed 2 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch in the entrance, 2nd story at north

    Issued 27 Nov 2024Violation dismissed 2 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at, in the entrance, 4th story at north

    Issued 20 Nov 2024Violation dismissed 2 Mar 2025Doors and windows§ 25-171

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 4th story at north

    Issued 20 Nov 2024Violation dismissed 2 Mar 2025Doors and windows§ 27-2005

  • Replace with new the broken or defective steam pipe riser in the bathroom, 1st story at west

    Issued 26 Mar 2019Violation closed 1 Dec 2024Heat and hot water§ 27-2005

  • Reset, so as to secure a proper and tight connection, the water closet bowl.. in the bathroom, 1st story at west

    Issued 26 Mar 2019Violation closed 1 Dec 2024§ 27-2026

  • Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom, 1st story at north

    Issued 13 Mar 2019Violation closed 1 Dec 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all walls in the bathroom, 1st story at north

    Issued 27 Oct 2018Violation closed 1 Dec 2024Walls and ceilings§ 27-2013

  • Abate the nuisance consisting of vermin water bugs, 1st story at north

    Issued 27 Oct 2018Violation closed 1 Dec 2024Pests§ 27-2018

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet.. in the bathroom, 1st story at north

    Issued 27 Oct 2018Violation closed 1 Dec 2024§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 1st story at north

    Issued 27 Oct 2018Violation closed 1 Dec 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 1st story at north

    Issued 5 Sept 2018Violation closed 1 Dec 2024Walls and ceilings§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at north

    Issued 5 Sept 2018Violation closed 1 Dec 2024Fire and safety equipment§ 27-2046.1

  • Abate the nuisance consisting of roaches in the entire apartment, 1st story at north

    Issued 5 Sept 2018Violation closed 1 Dec 2024Pests§ 27-2018

  • Repair or replace the smoke detector defective in the entire apartment, 1st story at north

    Issued 28 Aug 2018Violation closed 1 Dec 2024Fire and safety equipment§ 27-2045

  • Provide an adequate supply of gas to the fixtures at range in the kitchen, 1st story at north

    Issued 28 Aug 2018Violation closed 1 Dec 2024Appliances§ 27-2070

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at north

    Issued 28 Aug 2018Violation closed 1 Dec 2024Fire and safety equipment§ 27-2046.1

  • Replace with new the broken or defective double hung window,top sash, in the 2nd room from north at east, 1st story at east

    Issued 15 Sept 2015Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom, 1st story at east

    Issued 26 Aug 2015Violation closed 1 Dec 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 1st story at east

    Issued 26 Aug 2015Violation closed 1 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at east

    Issued 26 Aug 2015Violation closed 1 Dec 2024Leaks and plumbing§ 27-2026

  • Properly repair the broken or defective counterbalance at lower window sash in the 1st room from east at south, 1st story at east

    Issued 26 Aug 2015Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • ×2Properly repair the broken or defective counter balance lower and upper window sash in the 1st room from north, 2nd story at north

    2 issued 11 Dec 2010 to 5 Mar 2011Violation closedDoors and windows§ 27-2005

  • ×2Properly repair the broken or defective counter balance lower and upper window sash in the 2nd room from north, 2nd story at north

    2 issued 11 Dec 2010 to 5 Mar 2011Violation closedDoors and windows§ 27-2005

  • ×2Properly repair the broken or defective counter balance lower and upper window sash in the 5th room from north, 2nd story at north

    2 issued 11 Dec 2010 to 5 Mar 2011Violation closedDoors and windows§ 27-2005

  • Properly repair the broken or defective upper & lower sash windows all rooms in the entire apartment, 2nd story at north

    Issued 8 Feb 2011Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Refit windows top and bottom sash through out in the entire apartment, 2nd story at north

    Issued 1 Feb 2011Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective improperly counterbalanced lower & upper sashes windows apartment throughout, 2nd story at north

    Issued 16 Dec 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective counter balance at lower and upper window sash in the 2nd room from north, 2nd story at north

    Issued 20 Oct 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective counter balance at lower and upper window sash in the 1st room from north, 2nd story at north

    Issued 20 Oct 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Replace with new the broken or defective window sash upper and lower in the 1st bedroom from east at south, 2nd story

    Issued 17 Aug 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Replace with new the broken or defective window sash upper and lower in the 1st living room from east at north, 2nd story

    Issued 17 Aug 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Refit wood door in the bathroom, 2nd story at north

    Issued 22 Mar 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective upper and lower sash counter balance at windows throughout in the entire apartment, 2nd story at north

    Issued 22 Mar 2010Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective lower window sash in the entire apartment, 2nd story at north

    Issued 25 Jul 2006Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Refit the window in the 2nd room from north, 2nd story at north

    Issued 26 May 2006Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Refit the 2nd window from west at north in the 1st room from north, 2nd story at north

    Issued 26 May 2006Violation closed 1 Dec 2024Doors and windows§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 3rd story at north

    Issued 5 Jul 2024Violation closed 21 Nov 2024Fire and safety equipment§ 27-2045

  • Properly repair the source and abate the evidence of a water leak 0ver ceiling ceiling in the bathroom, 3rd story at north

    Issued 5 Jul 2024Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom, 3rd story at north

    Issued 5 Jul 2024Violation closed 21 Nov 2024Walls and ceilings§ 27-2013

  • Refit lower window sash in the 4th room from north, 3rd story at north

    Issued 5 Jul 2024Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at north

    Issued 5 Jul 2024Violation closed 21 Nov 2024Fire and safety equipment§ 27-2046.1

  • Properly repair the broken or defective locking device at vestibule door at public hall, 1st story

    Issued 1 Feb 2023Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Replace with new the broken or defective wire glass at lower window sash at public hall stairs, 4th story

    Issued 8 Mar 2022Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective mortise lock at vestibule door to 1st sty public hall, 1st story

    Issued 8 Mar 2022Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Replace with new the broken or defective wire glass at lower window sash at public hall stairs, 3rd story

    Issued 8 Mar 2022Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at east at fire escape

    Issued 8 Mar 2022Violation closed 21 Nov 2024Fire and safety equipment§ 27-2014

  • Replace with new the broken or defective wire glass at lower window sash at public hall stairs, 2nd story

    Issued 8 Mar 2022Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Properly repair the broken or defective locking device at vestibule door

    Issued 27 Jan 2022Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Provide adequate supply of cold water for the fixtures at washbasin in the bathroom, 3rd story at north

    Issued 7 Oct 2021Violation closed 21 Nov 2024§ 27-2024

  • Paint with light colored paint to the satisfaction of this department.. 1st door frame from south at west wall in the 4th room from north, 3rd story at north

    Issued 7 Oct 2021Violation closed 21 Nov 2024Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation.. 1st riser from east at south wall in the kitchen, 3rd story at north

    Issued 7 Oct 2021Violation closed 21 Nov 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color.. ceiling in the bathroom, 3rd story at north

    Issued 7 Oct 2021Violation closed 21 Nov 2024Walls and ceilings§ 27-2005

  • Properly repair the broken or defective mortise lock at door in the entrance, 3rd story at north

    Issued 7 Oct 2021Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the ceiling at the roof bulkhead, 5th story

    Issued 30 Sept 2021Violation closed 21 Nov 2024Roof and outside the building§ 27-2013

  • Repair the roof so that it will not leak over the ceiling at the roof bulkhead, 5th story

    Issued 30 Sept 2021Violation closed 21 Nov 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material over the ceiling at the roof bulkhead, 5th story

    Issued 30 Sept 2021Violation closed 21 Nov 2024Roof and outside the building§ 27-2005

  • Refit first window from west at north in the 2nd room from east, 3rd story at west

    Issued 10 Jun 2021Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east, 3rd story at west

    Issued 10 Jun 2021Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Repair or replace the carbon monoxide detecting device(s). defective, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Fire and safety equipment§ 27-2046.1

  • Replace with new the broken or defective glass in window at east wall in the kitchen, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Remove all obstructions and repair all defects in sink drain pipe in the kitchen, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective faucets shower head in the bathroom, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Replace with new the broken or defective glass at door to the bathroom, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Replace with new the missing mortise lock at door in the 1st room from north, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Replace with new the missing lock at door in the 4th room from north, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Repair or replace the smoke detector defective, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Fire and safety equipment§ 27-2045

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall in the 4th room from north, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, 1st door frame from south at west wall in the bathroom, 3rd story at north

    Issued 10 Jun 2020Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective north and east wall with fire retardant plaster at 2nd story, 3rd story and bulkhead at public hall stairs

    Issued 13 Dec 2018Violation closed 21 Nov 2024Floors and stairs§ 27-2005

  • Properly secure the loose knob at vestibule door, 1st story

    Issued 13 Dec 2018Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department north and east walls at 2nd story, 3rd story and bulkhead at public hall stairs

    Issued 13 Dec 2018Violation closed 21 Nov 2024Floors and stairs§ 27-2013

  • Remove all encumbrances consisting of construction material at bulkhead at public hall stairs

    Issued 13 Dec 2018Violation closed 21 Nov 2024Fire and safety equipment§ 27-2005 +1

  • Remove all encumbrances consisting of household items at public hall, 3rd story

    Issued 13 Dec 2018Violation closed 21 Nov 2024Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 4th story balcony at east at fire escape

    Issued 13 Dec 2018Violation closed 21 Nov 2024Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective connection,waste line at wash basin in the bathroom, 3rd story at north

    Issued 3 Nov 2018Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak,at ceiling in the bathroom, 3rd story at north

    Issued 3 Nov 2018Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak,at ceiling in the kitchen, 3rd story at north

    Issued 3 Nov 2018Violation closed 21 Nov 2024Leaks and plumbing§ 27-2026

  • Repair or replace the carbon monoxide detecting device(s).,missing in the entire apartment, 3rd story at north

    Issued 3 Nov 2018Violation closed 21 Nov 2024Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector,missing in the entire apartment, 3rd story at north

    Issued 3 Nov 2018Violation closed 21 Nov 2024Fire and safety equipment§ 27-2045

  • Replace with new the broken or defective mortise lock at vestibule door, 1st story

    Issued 27 Oct 2018Violation closed 21 Nov 2024Doors and windows§ 27-2005

  • Remove the illegal fastening slide bold with eye capable of padlocking at exterior of entrance door in the entrance, 4th story at north

    Issued 28 Sept 2017Violation closed 21 Nov 2024Doors and windows§ 27-2005 +1

Showing the 100 most recent of 119.

195 violations on record in total, 66 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

36 complaints in three years, 8 of them in the last twelve months.

  • Appliances0 / 5
  • Heat and hot water5 / 5
  • Leaks and plumbing0 / 5
  • Pests0 / 3
  • Doors and windows1 / 3
  • Floors and stairs0 / 3
  • Mold and damp0 / 3
  • Walls and ceilings0 / 3
  • Entry, buzzer and mail0 / 2
  • Fire and safety equipment1 / 2
  • Noise1 / 2

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

6 cases, all closed.

  • Tenant Action

    Opened 23 Oct 2024

  • Tenant Action

    Opened 1 Oct 2024

  • Tenant Action

    Opened 19 Jul 2023

  • Comprehensive

    Opened 23 May 2011

  • False Certification Non-Lead

    Opened 13 Oct 2010

  • Access Warrant - Non-Lead

    Opened 26 Jan 2007

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20241 eviction

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 8 earlier reports
  • 2025No infested units reported (2023 report)
  • 2024No infested units reported (2022 report)
  • 2024No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2022No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)
  • 2020No infested units reported (2018 report)
  • 2019No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record and managing agent

    1701 WOODBINE LLC

    Public records list 1701 WOODBINE LLC as the owner of record and the registered managing agent for this address as of 26 Jun 2025. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 36 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 5 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. There are 4 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4034560001 · Block 3456, Lot 1 · Building class C1