ByTenantsByTenants home

1675 Woodbine Street, Ridgewood, NY 11385

Built 1930 · 3-story walk-up · 6 apartments

19 immediately hazardous violations open. 21 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
2119 · 2
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202300
202400
202500
2026 so far210

Plus 156 violations from 2005 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 9
  • Heat and hot water 6
  • Doors and windows 2
Open per apartment
3.5 (21 open across 6 apartments)
Inspector last found a problem
7 Feb 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 1 day, and inspectors issued 6 violations.

WinterDaysComplaintsViolations
2025–26126

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous19 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Replace or repair the self-closing doors that is missing or defective latch set at fire door to basement at public hall, 1st story

    Issued 7 Feb 2026Notice sent out 8 Feb 2026Fire and safety equipment§ 27-2005 +3

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at east

    Issued 7 Feb 2026Invalid certification 12 Feb 2026Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st story

    Issued 7 Feb 2026Notice sent out 8 Feb 2026Heat and hot water§ 27-2033

  • Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door at public hall, 3rd story

    Issued 7 Feb 2026Notice sent out 8 Feb 2026Fire and safety equipment§ 27-2005 +3

  • Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at east

    Issued 2 Feb 2026Invalid certification 12 Feb 2026Heat and hot water§ 27-2029

  • Abate the nuisance consisting of key operated lock installed at door to room with fire escape window in the 1st room from north at east, 2nd story at east

    Issued 2 Feb 2026Notice sent out 2 Feb 2026Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective door and frame at stair bulkhead at public hall, 3rd story

    Issued 2 Feb 2026Invalid certification 12 Feb 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door and frame at vestibule at public hall, 1st story

    Issued 2 Feb 2026Notice sent out 2 Feb 2026Fire and safety equipment§ 27-2005 +3

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north, 1st story at east, section ''11''

    Issued 10 Jul 2018Certification postponment granted 12 Aug 2018Lead paint§ 27-2056.6

  • Provide ready access to buildings heating system lock door at boiler room

    Issued 15 Mar 2018Notice sent out 18 Mar 2018Heat and hot water§ 27-2033

Show all 19
  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story at north

    Issued 15 Mar 2018Notice sent out 18 Mar 2018Heat and hot water§ 27-2031

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall wall in the 2nd room from north, 1st story at east

    Issued 18 Feb 2014Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen, 1st story at east

    Issued 13 Jun 2006Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 3rd room from east, 1st story at north

    Issued 24 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 2nd room from east, 1st story at north

    Issued 24 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the kitchen, 1st story at north

    Issued 24 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from west at north wall in the bathroom, 1st story at north

    Issued 18 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchenette, 1st story at north

    Issued 18 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the 2nd room from north, 1st story at north

    Issued 18 Sept 2005Defect letter issued 20 Sept 2017Lead paint§ 27-2056.6

Non-hazardous2 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the bathroom, the kitchen, the 2nd room from north, 1st story at east, section ''11''

    Issued 10 Jul 2018Notice sent out 11 Jul 2018Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department, 1st door frame from east at south wall in the 3rd room from north, 1st story at east, section ''11''

    Issued 10 Jul 2018Notice sent out 11 Jul 2018Doors and windows§ 27-2013

157 closed violations, plus 2 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story

    Issued 7 Feb 2026Violation dismissed 21 May 2026Floors and stairs§ 27-2005

  • Remove all encumbrances consisting of construction material at public hall, 1st story

    Issued 7 Feb 2026Violation dismissed 21 May 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair or replace the broken or defective latch set at fire door to basement at public hall, 1st story

    Issued 7 Feb 2026Violation dismissed 21 May 2026Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch set at bulkhead door at public hall, 3rd story

    Issued 7 Feb 2026Violation dismissed 21 May 2026Doors and windows§ 27-2005

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 2nd story at east

    Issued 2 Feb 2026Violation dismissed 21 May 2026Fire and safety equipment§ 27-2045 +3

  • Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 2nd story at east

    Issued 2 Feb 2026Violation dismissed 21 May 2026Leaks and plumbing§ 27-2026

  • Provide adequate supply of cold water for the fixtures.. in the entire apartment, 2nd story at east

    Issued 2 Feb 2026Violation dismissed 26 Apr 2026§ 27-2024

  • Provide adequate supply of hot water for the fixtures. in the entire apartment, 2nd story at east

    Issued 2 Feb 2026Violation dismissed 26 Apr 2026Heat and hot water§ 27-2024

  • ×2Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at east

    2 issued 2 Feb 2026 to 7 Feb 2026Violation closedFire and safety equipment§ 27-2005 +3

  • Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at east

    Issued 7 Feb 2026Violation closed 2 Mar 2026Heat and hot water§ 27-2029

  • Provide adequate supply of cold water for the fixtures. in the entire apartment, 3rd story at east

    Issued 2 Feb 2026Violation closed 26 Feb 2026§ 27-2024

  • Provide adequate supply of hot water for the fixtures. in the entire apartment, 3rd story at east

    Issued 2 Feb 2026Violation closed 26 Feb 2026Heat and hot water§ 27-2024

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north, 1st story at east, section ''11''

    Issued 10 Jul 2018Violation dismissed 8 Nov 2018Leaks and plumbing§ 27-2026

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story

    Issued 29 May 2018Violation dismissed 13 Sept 2018Heat and hot water§ 27-2031

  • Provide an adequate supply of gas to the fixtures at range in the kitchen, 2nd story at north

    Issued 15 Mar 2018Violation closed 12 Sept 2018Appliances§ 27-2070

  • Provide ready access to buildings heating system at locked cellar

    Issued 29 May 2018Violation dismissed 14 Aug 2018Heat and hot water§ 27-2033

  • Abate the nuisance consisting of free standing radiator at 1st story public hall

    Issued 7 May 2018Violation closed 29 May 2018Heat and hot water§ 27-2005 +1

  • ×2Provide hot water at all hot water fixtures in the entire apartment, 1st story at east

    2 issued 15 Feb 2014 to 7 Nov 2016Violation closedHeat and hot water§ 27-2031

  • Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 1st story at east

    Issued 10 Nov 2016Violation dismissed 19 Sept 2017Heat and hot water§ 27-2028 +1

  • Provide ready access to buildings heating system, at cellar

    Issued 7 Nov 2016Violation closed 13 Sept 2017Heat and hot water§ 27-2033

  • ×2Abate the nuisance consisting of mice in the entire apartment, 2nd story

    2 issued 27 Mar 2013 to 31 May 2015Violation closedPests§ 27-2018

  • Repair or replace the carbon monoxide detecting device(s)...missing, at least 2 required, 1st story

    Issued 14 Sept 2012Violation closed 13 Sept 2017Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing, at least 2 required, 1st story

    Issued 14 Sept 2012Violation closed 13 Sept 2017Fire and safety equipment§ 27-2045

  • Replace with new the broken or defective wood window sashes at both windows in the kitchen, 1st story

    Issued 14 Sept 2012Violation closed 13 Sept 2017Doors and windows§ 27-2005

  • Replace with new the broken or defective wood window sashes in the 3rd room from north, 1st story

    Issued 14 Sept 2012Violation closed 13 Sept 2017Doors and windows§ 27-2005

  • Properly repair the broken or defective inoperative bell and return buzer system from 1sty vestibule to, 2nd story

    Issued 9 Jul 2012Violation closed 13 Sept 2017Entry, buzzer and mail§ 27-2005

  • Properly repair the broken or defective apartment entrance door frame in the 4th room from east, 1st story at south

    Issued 30 Jan 2012Violation closed 13 Sept 2017Doors and windows§ 27-2005

  • Replace with new the broken or defective glass pane at window lower sash in the 4th room from east, 1st story at south

    Issued 30 Jan 2012Violation closed 13 Sept 2017Doors and windows§ 27-2005

  • Properly repair the broken or defective rotted and inoperative window sashes in the kitchen, 1st story at south

    Issued 30 Jan 2012Violation closed 13 Sept 2017Doors and windows§ 27-2005

  • Properly repair the broken or defective bell buzzer system, from building entrance to wallmount in the entire apartment, 1st story at south

    Issued 5 May 2011Violation closed 13 Sept 2017Entry, buzzer and mail§ 27-2005

  • Remove the illegal fastening double cylinder key operated lock installed in the entrance, 1st story

    Issued 28 Dec 2009Violation closed 13 Sept 2017§ 27-2005 +1

  • Remove the illegal fastening double cylinder locks key operated in the entrance, 1st story

    Issued 17 Dec 2005Violation closed 13 Sept 2017§ 27-2005 +1

  • Remove the illegal fastening double cylinder lock key operatred in the entrance, 1st story

    Issued 1 Aug 2005Violation closed 13 Sept 2017§ 27-2005 +1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the bathroom, 1st story at east

    Issued 10 Nov 2016Violation closed 22 Jan 2017Fire and safety equipment§ 27-2043.1

  • Properly repair with similar material the broken or defective torn floor covering at all sty at public hall

    Issued 10 Aug 2015Violation closed 15 Oct 2015Floors and stairs§ 27-2005

  • Replace with new the broken or defective ceramic tile all sty at public hall stairs

    Issued 10 Aug 2015Violation closed 15 Oct 2015Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective fire retarding material at east wall in the public hall located at public parts 3r, 3rd story, 1st public parts from west at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Arrange and make self-closing the doors bulkhead in the public hall located at public parts 3r, 3rd story, 1st public parts from west at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Fire and safety equipment§ 27-2005 +1

  • Properly secure the loose ceiling fan in the 4th room from east, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling fan in the 4th room from east, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Electrical§ 27-2005

  • Properly repair with similar material the broken or defective window casing in the 4th room from east, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Doors and windows§ 27-2005

  • Replace with new the broken or defective sink in the kitchen, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Properly repair the broken or defective lock assembly at vestibule door, 1st story

    Issued 10 Aug 2015Violation closed 15 Oct 2015Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at east wall in the kitchen, 3rd story at north

    Issued 10 Aug 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling in the kitchen, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic tiles at walls vestibule 1st story public hall

    Issued 31 May 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Cleanse to the satisfaction of this department the floor all stories public hall

    Issued 31 May 2015Violation closed 15 Oct 2015Floors and stairs§ 27-2011

  • Abate the nuisance consisting of roaches in the entire apartment, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Pests§ 27-2018

  • Remove the illegal double cylinder key operated locking device at door at door in the 5th room from east, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from east, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 2nd story

    Issued 31 May 2015Violation closed 15 Oct 2015Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of rodents rats.(feces observed near gas-range) in the entire apartment, 2nd story at west

    Issued 24 Jun 2013Violation closed 15 Oct 2015Pests§ 27-2018

  • Repair or replace the smoke detector missing, 3rd story at north

    Issued 5 Jul 2012Violation closed 15 Oct 2015Fire and safety equipment§ 27-2045

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 3rd story at north

    Issued 5 Jul 2012Violation closed 15 Oct 2015Fire and safety equipment§ 27-2046.1

  • Properly repair the broken or defective door bell system in the entire apartment, 2nd story

    Issued 22 Jun 2012Violation closed 15 Oct 2015Entry, buzzer and mail§ 27-2005

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the entire apartment, 2nd story

    Issued 10 Nov 2009Violation closed 15 Oct 2015Walls and ceilings§ 300

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing in vestibule at public hall, 1st story

    Issued 12 Dec 2007Violation closed 15 Oct 2015Heat and hot water§ 27-2033

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard

    Issued 31 May 2015Violation closed 10 Aug 2015Garbage and cleanliness§ 27-2010

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required. light fixture present

    Issued 8 Oct 2014Violation closed 1 Jun 2015Electrical§ 27-2040

  • Replace with new the broken or defective outer glass at the lower sash at the north 2 window at kitchen, 1st story, apartment

    Issued 15 Nov 2013Violation closed 1 Jun 2015Doors and windows§ 27-2005

  • Replace with new the broken or defective outer glass at the lower sash at the north 2 window in the kitchen, 1st story at east

    Issued 15 Nov 2013Violation closed 1 Jun 2015Doors and windows§ 27-2005

  • Properly repair the broken or defective light fixture at ceiling in the 1st room from north, 3rd story

    Issued 27 Mar 2013Violation closed 1 Jun 2015Walls and ceilings§ 27-2005

  • Replace with new the broken or defective apartment entry door in the entrance, 1st story

    Issued 14 Sept 2012Violation closed 1 Jun 2015Doors and windows§ 27-2005

  • Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate.. in the kitchen, 1st story

    Issued 14 Sept 2012Violation closed 1 Jun 2015Fire and safety equipment§ 27-2005 +1

  • Abate the nuisance consisting of no electricity at ceiling light fixture in the 2nd room from east, 3rd story

    Issued 30 Dec 2011Violation closed 1 Jun 2015Electrical§ 27-2005 +1

  • Replace with new the broken or defective lower window pane in the kitchen, 1st story

    Issued 17 Oct 2011Violation closed 1 Jun 2015Doors and windows§ 27-2005

  • Replace with new the broken or defective glass at lower sash, outer lite at north window in the kitchen, 1st story

    Issued 5 May 2011Violation closed 1 Jun 2015Doors and windows§ 27-2005

  • Abate the nuisance consisting of roaches in the entire apartment, 1st story at west

    Issued 28 Dec 2009Violation closed 1 Jun 2015Pests§ 27-2018

  • Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate.. in the entire apartment, 1st story at west

    Issued 2 Oct 2009Violation closed 1 Jun 2015Fire and safety equipment§ 27-2005 +1

  • Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate... in the entire apartment, 1st story at west

    Issued 2 Feb 2008Violation closed 1 Jun 2015Fire and safety equipment§ 27-2005 +1

  • Abate the nuisance consisting of vermin roaches in the entire apartment, 1st story at west

    Issued 7 Sept 2007Violation closed 1 Jun 2015Pests§ 27-2018

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dropped ceiling in the 2nd room from north, 2nd story at west

    Issued 16 Apr 2010Violation closed 30 May 2015Walls and ceilings§ 300

  • Repair the broken or defective plastered surfaces and paint in a uniform color, south wall, east wall, ceiling, north wall in the 2nd room from north, 1st story at east

    Issued 18 Feb 2014Violation closed 18 May 2014Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north, the 3rd room from north, the bathroom, 1st story at east

    Issued 18 Feb 2014Violation closed 18 May 2014Walls and ceilings§ 27-2013

  • Paint metal in accordance with dept. regulation, 1st riser from north at east wall in the 2nd room from north, 1st story at east

    Issued 18 Feb 2014Violation closed 18 May 2014Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department, 1st door frame from south at west wall, 1st window frame from east at south wall, 1st closet from west at north wall door frame in the 2nd room from north, 1st story at east

    Issued 18 Feb 2014Violation closed 18 May 2014Doors and windows§ 27-2013

  • Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 1st story at east

    Issued 15 Feb 2014Violation closed 18 May 2014Heat and hot water§ 27-2028 +1

  • Replace with new the broken or defective air valve at radiator in the entire apartment, 2nd story

    Issued 17 Jan 2014Violation closed 18 May 2014Heat and hot water§ 27-2005

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following one or more lights with an aggregate of not less than 100 watts incandescent or equivalent at front areaway

    Issued 15 Nov 2013Violation closed 18 May 2014Electrical§ 27-2040

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet.. in the bathroom, 2nd story at west

    Issued 24 Jun 2013Violation closed 18 May 2014§ 27-2026

  • Properly repair the broken or defective mailbox for an apartment at public hall, 2nd story

    Issued 27 Mar 2013Violation closed 18 May 2014Entry, buzzer and mail§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet....... in the bathroom, 2nd story

    Issued 27 Mar 2013Violation closed 18 May 2014§ 27-2026

  • Properly repair the broken or defective mailbox doors and locks at public hall, 1st story

    Issued 14 Sept 2012Violation closed 18 May 2014Entry, buzzer and mail§ 27-2005

  • Remove all encumbrances consisting of toys, luggage and other personal belongings stored at public hall, 3rd story

    Issued 5 Jul 2012Violation closed 18 May 2014Fire and safety equipment§ 27-2005 +1

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***

    Issued 8 Dec 2011Violation closed 18 May 2014Electrical§ 27-2040

  • Replace with new the broken or defective furnance cement at breeching in boiler room at cellar

    Issued 31 Oct 2011Violation closed 18 May 2014Heat and hot water§ 27-2005

  • Properly repair the broken or defective building entry door lockset, 1st story

    Issued 20 Oct 2011Violation closed 18 May 2014Doors and windows§ 27-2005

  • Replace with new the broken or defective shut off vavle at radiator in the 2nd room from east, 2nd story

    Issued 10 Jan 2011Violation closed 18 May 2014Heat and hot water§ 27-2005

  • Properly repair the broken or defective mail-box at public hall, 1st story

    Issued 1 Oct 2009Violation closed 18 May 2014§ 27-2005

  • Properly repair the broken or defective mailbox door in vestibule at public hall, 1st story

    Issued 12 Dec 2007Violation closed 18 May 2014Entry, buzzer and mail§ 27-2005

  • The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Issued 13 Nov 2007Violation dismissed 16 Jun 2013§ 27-2153

  • Provide an adequate supply of gas to the fixtures.....gas range in the kitchen, 3rd story

    Issued 27 Mar 2013Violation closed 13 Jun 2013Appliances§ 27-2070

  • Properly repair the broken or defective counter balance lower sash at window in the kitchen, 2nd story

    Issued 27 Mar 2013Violation closed 9 Jun 2013Doors and windows§ 27-2005

  • Properly repair the broken or defective inoperable light fixture at ceiling in the kitchen, 3rd story at north

    Issued 5 Jul 2012Violation closed 19 Dec 2012Walls and ceilings§ 27-2005

Showing the 100 most recent of 157.

180 violations on record in total, 21 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

10 complaints in three years, 7 of them in the last twelve months.

  • Leaks and plumbing3 / 3
  • Noise1 / 3
  • Garbage and cleanliness1 / 2
  • Heat and hot water2 / 2

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

10 cases, all closed.

  • Heat and Hot Water

    Opened 17 Mar 2026

  • Heat and Hot Water

    Opened 11 Apr 2018

  • Tenant Action

    Opened 13 Feb 2018

  • Heat and Hot Water

    Opened 19 Dec 2016

  • Heat and Hot Water

    Opened 14 Nov 2011

  • Comp Supplemental Cases

    Opened 12 Apr 2007

  • Comprehensive

    Opened 9 Aug 2006

  • Comprehensive

    Opened 28 Apr 2006

  • Tenant Action

    Opened 17 Mar 2006

  • Heat and Hot Water

    Opened 28 Dec 2005

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 5 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 20231 of 6 units reported infested (2021 report)
  • 2021No infested units reported (2019 report)
  • 2019No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    AE DUKE MANAGEMENT

    Public records list AE DUKE MANAGEMENT as the registered managing agent for this address as of 17 Jul 2025. Source: HPD registration.

    Other buildings listed under this agent (1 in the records we hold)

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    1675 WOODBINE PORTFOLIO, LLC

    Public records list 1675 WOODBINE PORTFOLIO, LLC as the owner of record for this address as of 17 Jul 2025. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 19 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  3. This building dates from 1930 and has 9 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  4. Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 3 complaints in the last twelve months.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4034490041 · Block 3449, Lot 41 · Building class C2