18-78 Himrod Street, Ridgewood, NY 11385
Built 1930 · 3-story walk-up · 6 apartments
10 immediately hazardous violations open. 27 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 2710 · 9 · 8
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 0 | 0 |
| 2023 | 26 | 7 |
| 2024 | 0 | 0 |
| 2025 | 3 | 0 |
| 2026 so far | 0 | 0 |
Plus 5 violations from 2008 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Doors and windows 8
- Fire and safety equipment 8
- Lead paint 7
- Open per apartment
- 4.5 (27 open across 6 apartments)
- Inspector last found a problem
- 18 Nov 2025 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 1 day.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 1 | 1 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous10 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Abate the infestation consisting of mice in the entire apartment, 3rd story at east
Issued 29 Mar 2023Certification postponment denied 10 Apr 2023Pests§ 27-2017.4
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north, 3rd story at east
Issued 22 Mar 2023Notice sent out 22 Mar 2023Lead paint§ 27-2056.6
Abate the infestation consisting of mice in the entire apartment, 3rd story at east
Issued 24 Jan 2023Invalid certification 16 Feb 2023Pests§ 27-2017.4
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six, 3rd story at east
Issued 24 Jan 2023Certification postponment denied 22 Feb 2023Lead paint§ 27-2056.7 +2
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at east
Issued 24 Jan 2023Notice sent out 25 Jan 2023Heat and hot water§ 27-2029
Provide ready access to buildings heating system locked door to basement at boiler room
Issued 24 Jan 2023Notice certified late 16 Feb 2023Heat and hot water§ 27-2033
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the kitchen, 3rd story at east
Issued 24 Jan 2023Certification postponment denied 22 Feb 2023Lead paint§ 27-2056.6
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment, 3rd story at east
Issued 21 Jan 2023Notice sent out 22 Jan 2023Fire and safety equipment§ 27-2043.1
Remove the illegal fastening double cylinder key operated lock at entrance door, 2nd story
Issued 5 May 2011Notice sent out 8 May 2011Doors and windows§ 27-2005 +1
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall, west wall in the 2nd room from north, 3rd story at east
Issued 20 Aug 2008Notice sent out 25 Aug 2008Lead paint§ 27-2056.6
Hazardous9 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Properly repair or replace the broken or defective window lock at 1st window from west at north in the 1st room from north, 3rd story at east
Issued 12 Jul 2023Notice sent out 12 Jul 2023Doors and windows§ 27-2005
Properly repair or replace the broken or defective outlet cover at the east wall in the kitchen, 3rd story at east
Issued 12 Jul 2023Notice sent out 12 Jul 2023Electrical§ 27-2005
Properly repair or replace the broken or defective 2nd window from west at north upper sash counter balance in the 1st room from north, 3rd story at east
Issued 12 Jul 2023Notice sent out 12 Jul 2023Doors and windows§ 27-2005
Properly repair the broken or defective pocket door off track at south in the 1st room from north, 3rd story at east
Issued 29 Mar 2023Certification postponment denied 10 Apr 2023Doors and windows§ 27-2005
Properly repair with similar material the broken or defective wood floor in the 3rd room from north, 3rd story at east
Issued 29 Mar 2023Certification postponment denied 10 Apr 2023Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor in the 2nd room from north, 3rd story at east
Issued 15 Mar 2023Certification postponment denied 10 Apr 2023Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood door in the 1st room from north, 3rd story at east
Issued 15 Mar 2023Certification postponment denied 10 Apr 2023Doors and windows§ 27-2005
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts
Issued 9 Jun 2009Notice sent out 10 Jun 2009Electrical§ 27-2040
Repair or replace the smoke detector missing, 3rd story at east
Issued 20 Aug 2008Notice sent out 25 Aug 2008Fire and safety equipment§ 27-2045
Non-hazardous8 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment, 3rd story at east
Issued 29 Mar 2023Certification postponment denied 10 Apr 2023Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the north wall in the 2nd room from north, 3rd story at east
Issued 22 Mar 2023Notice sent out 23 May 2023Walls and ceilings§ 27-2013
Paint with light colored paint to the satisfaction of this department the west wall in the kitchen, 3rd story at east
Issued 22 Mar 2023Notice sent out 23 May 2023Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective wood floor in the kitchen, 3rd story at east
Issued 15 Mar 2023Certification postponment denied 10 Apr 2023Floors and stairs§ 27-2005
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, east wall in the 2nd room from north, 3rd story at east
Issued 24 Jan 2023Certification postponment denied 10 Apr 2023Doors and windows§ 27-2013
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door frame from north at east wall, south wall in the 3rd room from north, 3rd story at east
Issued 24 Jan 2023Notice sent out 5 Mar 2023Doors and windows§ 27-2013
Refit at entrance door in the 1st room from north, 3rd story at east
Issued 21 Jan 2023Certification postponment denied 10 Apr 2023Doors and windows§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the 3rd room from north, the bathroom, 3rd story at east
Issued 20 Aug 2008Notice sent out 25 Aug 2008Walls and ceilings§ 27-2013
14 closed violations, plus 8 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment, 3rd story at east
Issued 18 Nov 2025Violation dismissed 18 Feb 2026Fire and safety equipment§ 27-2043.1
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Issued 18 Nov 2025Violation dismissed 18 Feb 2026Doors and windows§ 27-2005
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Issued 18 Nov 2025Violation closed 23 Jan 2026Fire and safety equipment§ 27-2005 +3
Provide ready access to buildings heating system door leading to boiler room locked at public hall, 1st story
Issued 15 Mar 2023Violation dismissed 30 May 2023Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at east
Issued 15 Mar 2023Violation dismissed 30 May 2023Heat and hot water§ 27-2029
Replace or repair the self-closing doors that is missing or defective hinges at door to apartment in the entrance, 3rd story at east
Issued 29 Mar 2023Violation closed 24 May 2023Fire and safety equipment§ 27-2005 +2
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north, 3rd story at east
Issued 22 Mar 2023Violation closed 22 May 2023Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen, 3rd story at east
Issued 22 Mar 2023Violation closed 22 May 2023Lead paint§ 27-2056.6
×2Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at east
2 issued 21 Jan 2023 to 24 Jan 2023Violation dismissedFire and safety equipment§ 27-2046.1
×2Repair or replace the smoke detector missing in the entire apartment, 3rd story at east
2 issued 21 Jan 2023 to 24 Jan 2023Violation dismissedFire and safety equipment§ 27-2045
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, east wall in the 2nd room from north, 3rd story at east
Issued 24 Jan 2023Violation closed 2 Mar 2023Lead paint§ 27-2056.6
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from north at east wall, south wall in the 3rd room from north, 3rd story at east
Issued 24 Jan 2023Violation closed 2 Mar 2023Lead paint§ 27-2056.6
49 violations on record in total, 27 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
1 complaint in three years, 1 of them in the last twelve months.
- Heat and hot water1 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case pending, 0 closed.
Heat and Hot WaterPending
Opened 8 May 2023
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No permit currently in force. 1 permit filed in the last five years.
Show 1 expired or finishedShow fewer
General Construction
Proposed Interior Renovation of Apartment 3R as per plans filed.
Issued 1 Aug 2025Expired 24 Mar 2026
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2026No infested units reported (2024 report)
Show 7 earlier reportsShow fewer
- 2026No infested units reported (2024 report)
- 2025No infested units reported (2024 report)
- 2025No infested units reported (2023 report)
- 2025No infested units reported (2023 report)
- 2024No infested units reported (2022 report)
- 2022No infested units reported (2021 report)
- 2022No infested units reported (2020 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
JAMES PAPPAS
Public records list JAMES PAPPAS as the registered managing agent for this address as of 16 Nov 2025. Source: HPD registration.
Other buildings listed under this agent (2 in the records we hold)
- 1822 Harman Street14 open violations · no reviews yet
- 1820 Harman Street4 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
HIMROD 1878 REALTY LLC
Public records list HIMROD 1878 REALTY LLC as the owner of record for this address as of 16 Nov 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
18-78 Himrod Street, Ridgewood, NY 11385
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 10 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- HPD has 1 case pending against the owner in Housing Court (heat and hot water). Ask what it is about and whether the work has been done.
- The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- This building dates from 1930 and has 4 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 27 open housing violations: 10 immediately hazardous, 9 hazardous and 8 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for doors and windows (8), fire and safety equipment (8) and lead paint (7).
On 18 Nov 2025. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 1 day, and HPD issued 0 heat violations.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4034030032 · Block 3403, Lot 32 · Building class C2
