ByTenantsByTenants home

19-13 Linden Street, Ridgewood, NY 11385

Built 1915 · 3-story walk-up · 6 apartments

8 immediately hazardous violations open. 29 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
298 · 17 · 4
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

None issued since 2022. 62 violations before that, the first in 2013.

See every violation
Open per apartment
4.8 (29 open across 6 apartments)
Inspector last found a problem
12 Dec 2020 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous8 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 1st story at west

    Issued 12 Dec 2020Notice sent out 14 Dec 2020Lead paint§ 27-2056.8

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st window frame from west at north wall in the kitchen, 3rd story at north

    Issued 4 Nov 2018Violation reopen 15 Oct 2020Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from north, 3rd story at north

    Issued 4 Oct 2018Notice certified late 6 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom, 3rd story at north

    Issued 4 Oct 2018Notice certified late 6 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the kitchen, 3rd story at north

    Issued 4 Oct 2018Notice certified late 6 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer, 3rd story at north

    Issued 4 Oct 2018Notice certified late 6 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) floor, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from north, 3rd story at north

    Issued 4 Oct 2018Notice certified late 6 Dec 2018Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 1;, 3rd story at north

    Issued 9 Sept 2016Not complied with 14 Dec 2016Fire and safety equipment§ 27-2043.1

Hazardous17 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at east wall at public hall, 3rd story

    Issued 3 Dec 2018Notice certified late 29 Apr 2019Electrical§ 27-2005

  • Repair the roof so that it will not leak at ceiling in the kitchen, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the kitchen, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Walls and ceilings§ 27-2005

  • Replace with new the missing saddle in the bathroom, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019§ 27-2005

  • Trace and repair the source and abate the nuisance consisting of mold... approx 20 sq ft at east wall (ceramic tiles) in the bathroom, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Mold and damp§ 27-2005

  • Replace with new the missing ceramic floor tiles in the bathroom, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Floors and stairs§ 27-2005

  • Provide a safe and adequate supply of electric service to the fixtures switch socket outlet at west wall in the bathroom, 3rd story at north

    Issued 4 Nov 2018Notice sent out 6 Nov 2018Electrical§ 27-2037

  • Properly repair the broken or defective door panel in the entrance, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Doors and windows§ 27-2005

  • Properly repair the broken or defective lower sash; counter balance at second window from west at north wall in the kitchen, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Doors and windows§ 27-2005

Show all 17
  • Provide a safe and adequate supply of electric service to the fixtures switch socket at north wall in the 2nd room from north, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Electrical§ 27-2037

  • Properly repair with similar material the broken or defective wood floor in the foyer, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color... ceiling in the kitchen, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of south entrance door leading to public hall sealed shut in the 5th room from north, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Doors and windows§ 27-2005 +1

  • Remove all obstructions and repair all defects in waste line at wash basin in the bathroom, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Floors and stairs§ 27-2005

  • Properly repair the broken or defective bell/buzzer system from first story public hall to box in the foyer, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Entry, buzzer and mail§ 27-2005

Non-hazardous4 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 2nd room from north, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 4th room from north, 3rd story at north

    Issued 4 Nov 2018Notice certified late 29 Apr 2019Heat and hot water§ 27-2005

  • Paint metal in accordance with dept. regulation.. 1st riser from south at west wall in the bathroom, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department.. floor in the foyer, 3rd story at north

    Issued 4 Oct 2018Notice certified late 29 Apr 2019Floors and stairs§ 27-2013

33 closed violations, plus 2 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Issued 12 Dec 2020Violation closed 29 Mar 2021Lead paint§ 27-2056.4

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 24 Aug 2020Violation closed 8 Dec 2020Lead paint§ 27-2056.4 +1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, east wall in the 2nd room from north, 3rd story at north

    Issued 4 Oct 2018Violation closed 18 Apr 2019Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer, 3rd story at north

    Issued 4 Nov 2018Violation closed 19 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom, 3rd story at north

    Issued 4 Nov 2018Violation closed 19 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from north, 3rd story at north

    Issued 4 Nov 2018Violation closed 19 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 4th room from north, 3rd story at north

    Issued 4 Nov 2018Violation closed 19 Dec 2018Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 5th room from north, 3rd story at north

    Issued 4 Nov 2018Violation closed 19 Dec 2018Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 4; one way screws in the entire apartment, 3rd story at north

    Issued 14 Dec 2016Violation dismissed 23 Mar 2017Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer, 3rd story at north

    Issued 9 Sept 2016Violation closed 22 Dec 2016Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen, 3rd story at north

    Issued 9 Sept 2016Violation closed 22 Dec 2016Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 22 Dec 2016Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 22 Dec 2016Lead paint§ 27-2056.6

  • Abate the nuisance consisting of roaches, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Pests§ 27-2018

  • Remove the illegal fastening locking device at door in the 5th room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Doors and windows§ 27-2005 +1

  • Paint metal in accordance with dept. regulation the ceiling in the kitchen, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the east wall in the kitchen, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the 2nd room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Doors and windows§ 27-2013

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration subspended acoustic tile ceiling in the 2nd room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration subspended acoustic tile ceiling in the bathroom, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration subspended acoustic tile ceiling in the 4th room from north, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration subspended acoustic tile ceiling in the foyer, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 300

  • Repair or replace the carbon monoxide detecting device(s). missing, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Fire and safety equipment§ 27-2045

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, 3rd story at north

    Issued 9 Sept 2016Violation closed 14 Dec 2016Walls and ceilings§ 27-2013

  • Refit windows in kitchen, room east one and room east 4, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Doors and windows§ 27-2005

  • Provide a safe and adequate supply of electric service to the fixtures ceiling private hall, room east one and room east two in the entire apartment, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Electrical§ 27-2037

  • Properly repair the broken or defective entrance door in the bathroom, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Doors and windows§ 27-2005

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Fire and safety equipment§ 27-2046.1

  • Refit door in the entrance, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Doors and windows§ 27-2005

  • Repair the broken or defective connection waste pipe at wash basin in the bathroom, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Leaks and plumbing§ 27-2026

  • Properly repair the broken or defective base cabinet in the kitchen, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling kitchen, room east one and room east four, 3rd story at west

    Issued 15 Aug 2013Violation dismissed 24 Nov 2013Walls and ceilings§ 27-2005

64 violations on record in total, 29 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

1 complaint in three years, 0 of them in the last twelve months.

  • Garbage and cleanliness0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

1 case, all closed.

  • Lead False Certification

    Opened 14 Jan 2019

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 6 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 2021No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)
  • 2020No infested units reported (2019 report)
  • 2019No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record and managing agent

    LINDEN MANAGEMENT LLC

    Public records list LINDEN MANAGEMENT LLC as the owner of record and the registered managing agent for this address as of 26 Aug 2025. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 8 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1915 and has 7 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4033920066 · Block 3392, Lot 66 · Building class C2