ByTenantsByTenants home

23-06 21 Street, Astoria, NY 11105

Built 1929 · 6-story elevator building · 59 apartments

20 immediately hazardous violations open. 22 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
2220 · 2
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202330
2024272
202500
2026 so far10

Plus 52 violations from 2020 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 13
  • Walls and ceilings 7
  • Leaks and plumbing 5
Open per apartment
0.4 (22 open across 59 apartments)
Inspector last found a problem
17 Aug 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 19 days.

WinterDaysComplaintsViolations
2025–2619430

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous20 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Replace or repair the self-closing doors that is missing or defective hinges on door to building rear at public hall, 1st story

    Issued 3 Jul 2024Notice sent out 7 Jul 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door and frame at door to rear yard at public hall, 1st story

    Issued 27 Jun 2024Notice sent out 30 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door to west yard at public hall, 1st story

    Issued 19 Jun 2024Certification postponment denied 30 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at fire door separating north and south sections at public hall, 6th story

    Issued 27 Dec 2023Not complied with 7 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 1st story at south

    Issued 1 Dec 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 1st story at north

    Issued 1 Dec 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment,, in the entire apartment, 1st story at east

    Issued 1 Dec 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment,, in the entire apartment, 4th story at north

    Issued 1 Dec 2020First no access to re- inspect violation 23 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, in the entire apartment, 1st story at west

    Issued 1 Dec 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 3rd story at south

    Issued 9 Oct 2020First no access to re- inspect violation 23 May 2021Lead paint§ 27-2056.8

Show all 20
  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 2nd story at west

    Issued 9 Oct 2020First no access to re- inspect violation 23 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment in the entire apartment, 6th story at south

    Issued 9 Oct 2020First no access to re- inspect violation 23 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 5th story at south

    Issued 9 Oct 2020Notice certified late 9 Dec 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 6th story at west

    Issued 9 Oct 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 5th story at east

    Issued 9 Oct 2020Lead docs submitted, not acceptable 8 Jan 2024Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 5th story at west

    Issued 9 Oct 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 5th story at west

    Issued 9 Oct 2020Not complied with 2 May 2021Lead paint§ 27-2056.8

  • ×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment.. in the entire apartment, 4th story at south

    2 issued 9 Oct 2020First no access to re- inspect violationLead paint§ 27-2056.8

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 5 Aug 2020Notice sent out 30 Sept 2020Lead paint§ 27-2056.7

Hazardous2 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair the broken or defective paving tiles at building front yard

    Issued 17 Aug 2026Notice certified on time 30 Aug 2026Roof and outside the building§ 27-2005

  • Refit door and frame at door to rear yard at public hall, 1st story

    Issued 27 Jun 2024Notice sent out 30 Jun 2024Roof and outside the building§ 27-2005

63 closed violations, plus 2 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies and all parts at north building front at fire escape

    Issued 27 Jun 2024Violation dismissed 25 Dec 2024Fire and safety equipment§ 27-2014

  • Replace with new the missing escutcheon plate at 1st steam riser from south at west in the bathroom, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 10 Dec 2024Heat and hot water§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Fire and safety equipment§ 27-2046.1

  • Properly repair or replace the broken or defective latch set at door to 1st closet from west at north in the private hallway, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south wall and west wall in the 1st room from east, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective broken wall cabinet at west in the kitchen, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Fire and safety equipment§ 27-2045

  • Properly repair or replace the broken or defective deteriorated countertop of base cabinet at sink in the kitchen, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective broken base cabinet at sink in the kitchen, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective latch set and door knob assembly at entrance door in the 1st room from east, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Doors and windows§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at the ceiling and south wall in the 1st room from east, 3rd story at south, section ''west''

    Issued 2 Sept 2024Violation dismissed 1 Dec 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective reglaze at bathtub in the bathroom, 3rd story at east, section at south

    Issued 27 Jun 2024Violation dismissed 10 Oct 2024Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and at east wall in the bathroom, 3rd story at south

    Issued 5 Jul 2024Violation dismissed 1 Oct 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and at north wall in the 2nd room from north at east, 3rd story at south

    Issued 5 Jul 2024Violation dismissed 1 Oct 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling and north wall in the bathroom, 3rd story at east, section at south

    Issued 27 Jun 2024Violation dismissed 1 Oct 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen, 3rd story at east, section at south

    Issued 27 Jun 2024Violation dismissed 1 Oct 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallway, 3rd story at east, section at south

    Issued 27 Jun 2024Violation dismissed 1 Oct 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom, 3rd story at east, section at south

    Issued 27 Jun 2024Violation dismissed 24 Sept 2024Walls and ceilings§ 27-2005

  • Remove the illegal fastening consisting of key operated double cylinder lock installed at door to rear yard at public hall, 1st story

    Issued 27 Jun 2024Violation dismissed 11 Sept 2024Roof and outside the building§ 27-2005 +1

  • Provide hot water at all hot water fixtures in the entire apartment, 6th story at west, section ''west''

    Issued 20 May 2024Violation dismissed 4 Aug 2024Heat and hot water§ 27-2031

  • Remove device preventing door from being self-closing hook and eye installed at door leading to rear court yard at public hall, 1st story

    Issued 20 Jun 2024Violation closed 4 Jul 2024Fire and safety equipment§ 27-2005 +1

  • Remove the illegal fastening hook and eye at fire door separating north and south sections at public hall, 6th story

    Issued 27 Dec 2023Violation dismissed 10 Mar 2024Doors and windows§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 5th story

    Issued 5 Jan 2024Violation closed 31 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 2nd story

    Issued 5 Jan 2024Violation closed 31 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 3rd story

    Issued 5 Jan 2024Violation closed 31 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 4th story

    Issued 5 Jan 2024Violation closed 31 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Remove device preventing door from being self-closing press down door stopper at vestibule door at public hall, 1st story

    Issued 7 Nov 2023Violation closed 28 Nov 2023Fire and safety equipment§ 27-2005 +1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom, 5th story at south

    Issued 9 Oct 2020Violation closed 24 May 2021Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen, 5th story at south

    Issued 9 Oct 2020Violation closed 24 May 2021Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the foyer, 5th story at south

    Issued 9 Oct 2020Violation closed 24 May 2021Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from north at east wall in the 3rd room from north at east, 5th story at south

    Issued 9 Oct 2020Violation closed 24 May 2021Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at west, 5th story at south

    Issued 9 Oct 2020Violation closed 24 May 2021Lead paint§ 27-2056.6

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, baseboard at east wall in the kitchen, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, 1st door from west at north wall in the 3rd room from north at east, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, baseboard at north wall in the 3rd room from north at west, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame, 1st closet from north at east wall door in the foyer, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, 1st door from south at west wall in the bathroom, 5th story at south

    Issued 9 Oct 2020Violation dismissed 10 Mar 2021Doors and windows§ 27-2013

  • Properly repair the broken or defective electrical light switch at west wall in the bathroom, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Electrical§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at north, east walls and ceiling at public hall, 6th story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at north, east walls and ceiling at public hall, 6th story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant materia at south wall at public hall, 6th story, section ''west''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at south wall at public hall, 6th story, section ''west''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story, section ''west''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department fire retardant material at ceiling at public hall, 4th story, section ''west''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 4th story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at north wall and ceiling at public hall, 4th story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 2nd story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at north wall at public hall, 2nd story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, north wall in the 3rd room from north at west, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story, section ''east''

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, ceiling, west wall in the 3rd room from north at east, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Walls and ceilings§ 27-2005

  • Abate the infestation consisting of roaches in the entire apartment, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Pests§ 27-2017.4

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 2; in the entire apartment, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Fire and safety equipment§ 27-2043.1

  • Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector inoperable in the entire apartment, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Fire and safety equipment§ 27-2045

  • Properly repair the broken or defective spring balance upper window sash at east wall in the kitchen, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Doors and windows§ 27-2005

  • Properly repair the broken or defective spring balance upper window sash at 1st and 2nd window from east at south in the 3rd room from north at west, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Doors and windows§ 27-2005

  • Properly repair the broken or defective spring balance upper window sash at south wall in the 3rd room from north at east, 5th story at south

    Issued 9 Oct 2020Violation dismissed 20 Jan 2021Doors and windows§ 27-2005

  • Arrange and make self-closing the doors.. in the entrance, 3rd story at east

    Issued 9 Mar 2020Violation closed 7 Jul 2020Fire and safety equipment§ 27-2005 +1

87 violations on record in total, 22 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

192 complaints in three years, 67 of them in the last twelve months.

  • Heat and hot water43 / 95
  • Noise22 / 68
  • Garbage and cleanliness0 / 10
  • Leaks and plumbing0 / 4
  • Floors and stairs1 / 3
  • Walls and ceilings0 / 3
  • Doors and windows0 / 2
  • Pests1 / 2
  • Construction and illegal work0 / 1
  • Fire and safety equipment0 / 1
  • Entry, buzzer and mail0 / 1
  • Other0 / 1
  • Mold and damp0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 7 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2021No infested units reported (2020 report)
  • 2020No infested units reported (2019 report)
  • 2019No infested units reported (2018 report)
  • 2018No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    BRICK PROPERTY MGMT LLC

    Public records list BRICK PROPERTY MGMT LLC as the registered managing agent for this address as of 23 Aug 2026. Source: HPD registration.

    Other buildings listed under this agent (5 in the records we hold)

    Show 2 more

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    AMORANI PARK VIEW LLC

    Public records list AMORANI PARK VIEW LLC as the owner of record for this address as of 23 Aug 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 20 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 43 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. There was 1 pest complaint here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1929 and has 16 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4008900091 · Block 890, Lot 91 · Building class D1