21-39 27 Street, Astoria, NY 11105
Built 1927 · 4-story walk-up · 16 apartments
A court found tenant harassment here in 2022. 5 immediately hazardous violations open. 48 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 485 · 31 · 12
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
None issued since 2022. 52 violations before that, the first in 2016.
See every violation- Open per apartment
- 3 (48 open across 16 apartments)
- Inspector last found a problem
- 15 Jan 2020 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 0 | 0 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous5 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak at ceiling and sourh walls in the 4th room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Replace with new the broken or defective air-valve to radiator at east wall in the 1st room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Heat and hot water§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 4th room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Walls and ceilings§ 27-2005
Remove all obstructions and repair all defects in waste-line at bathtub in the bathroom, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Hazardous31 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
×2Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from north, 4th story at south
2 issued 15 Jan 2020First no access to re- inspect violationWalls and ceilings§ 27-2005
Repair the leaky and/or defective faucets at wash basin in the bathroom, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Replace with new the broken or defective control valve to radiator at east wall in the 1st room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Heat and hot water§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 4th room from north, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroom, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Walls and ceilings§ 27-2005
Repair the leaky and/or defective faucets at washbasin in the bathroom, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets at wash basin in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets at sink in the kitchen, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Trace and repair the source and abate the visible mold condition... approx 2 square feet at east wall around 2nd window from north at east in the 1st room from east, 3rd story at east original violation 13060204 issued 08-may-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 8 May 2019First no access to re- inspect violation 11 Mar 2021Mold and damp§ 27-2017.3
Show all 31Show fewer
Repair the broken or defective plastered surfaces and paint in a uniform color water damaged wall at east in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color west north and southwalls and ceiling in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak ceiling and east wall around top of window reveal in the 4th room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Properly repair the source and abate the evidence of a water leak ceiling and east wall in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Replace with new the missing shut off valve handle to radiator in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Heat and hot water§ 27-2005
Properly repair with similar material the broken or defective window sills at east wall in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Doors and windows§ 27-2005
Replace with new the broken or defective electrical ceiling light swicth at west wall in the 1st room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Electrical§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2026
Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of plant pots at the 2nd, 3rd, and 4th story balconies front of building at fire escape
Issued 6 May 2019Notice sent out 9 May 2019Fire and safety equipment§ 27-2005 +1
Replace with new the broken or defective wire glass lite at the skylight at 1st public hall bulkhead from east, 4th story
Issued 6 May 2019Notice sent out 9 May 2019Roof and outside the building§ 27-2005
Repair the leaky and/or defective faucets at the wash basin in the bathroom, 1st story at east
Issued 6 May 2019Notice sent out 9 May 2019Leaks and plumbing§ 27-2026
Abate the nuisance consisting of protruding air conditioner without brackets at the 1st window from north at the front of building, 4th story
Issued 6 May 2019Notice sent out 9 May 2019Doors and windows§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 4th room from north, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Walls and ceilings§ 27-2005
Repair the leaky and/or defective faucets at washbasin in the bathroom, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets at sink in the kitchen, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Leaks and plumbing§ 27-2026
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall in the kitchen, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Electrical§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Leaks and plumbing§ 27-2026
Properly repair the broken or defective bell-buzzer/intercom system in the entire apartment, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Entry, buzzer and mail§ 27-2005
Non-hazardous12 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Refit the doors to base cabinet at sink in the kitchen, 4th story at south
Issued 15 Jan 2020First no access to re- inspect violation 11 Mar 2021Leaks and plumbing§ 27-2005
Reset, so as to secure a proper and tight connection, the water closet bowl.. in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019§ 27-2026
Properly repair with similar material the broken or defective calking at wash basin in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019§ 27-2005
Paint metal in accordance with dept. regulation steam pipe riser in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Heat and hot water§ 27-2005
Properly repair with similar material the broken or defective calking around bathtub in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Leaks and plumbing§ 27-2005
Replace with new the missing escutcheon plate for steam pipe riser at ceiling in the bathroom, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Heat and hot water§ 27-2005
Replace with new the missing escutcheon plate for steam pipe riser at ceiling in the 4th room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Heat and hot water§ 27-2005
Properly repair with similar material the broken or defective wood floor around radiator in the 4th room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Heat and hot water§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Walls and ceilings§ 27-2005
Refit doors at upper and lower cabinets in the kitchen, 3rd story at east
Issued 8 May 2019Notice sent out 8 May 2019Doors and windows§ 27-2005
Show all 12Show fewer
Replace with new the missing escutcheon plate for steam riser at ceiling in the 1st room from north, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Heat and hot water§ 27-2005
Properly secure the loose wood cabinet doors in the kitchen, 3rd story at south
Issued 10 Apr 2019Notice sent out 14 Apr 2019Doors and windows§ 27-2005
Paperwork and notices1 open
The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Issued 5 Apr 2016Notice sent out 6 Apr 2016Paperwork and notices§ 26-1103
4 closed violations, plus 6 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Abate the nuisance consisting of scalding hot water (136 degrees f) in the entire apartment, 4th story at south
Issued 15 Jan 2020Violation will be reinspected 10 Mar 2021Heat and hot water§ 27-2005 +1
Trace and repair the source and abate the visible mold condition... approx 2 square feet at east wall around 2nd window from north at east in the 1st room from east, 3rd story at east
Issued 8 May 2019Violation closed 10 Sept 2019Mold and damp§ 27-2017.3
Remove all obstructions and repair all defects in bathtub. in the bathroom, 2nd story at north
Issued 14 Nov 2016Violation dismissed 23 Feb 2017Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the entire apartment, 2nd story at north
Issued 14 Nov 2016Violation dismissed 23 Feb 2017Walls and ceilings§ 27-2005
59 violations on record in total, 49 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
12 complaints in three years, 9 of them in the last twelve months.
- Pests3 / 6
- Construction and illegal work4 / 4
- Noise2 / 2
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
The court found that the owner harassed tenants here (2022).
A finding is against whoever owned the building at the time, which may not be the owner today.
2 cases, all closed.
Tenant Action/Harassment
Opened 20 Dec 2022Harassment found
Tenant Action/Harassment
Opened 18 Oct 2016
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
- 20263 evictions
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2026No infested units reported (2024 report)
Show 3 earlier reportsShow fewer
- 2023No infested units reported (2021 report)
- 2022No infested units reported (2020 report)
- 20211 of 16 units reported infested (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
FIRST MANAGEMENT CORP
Public records list FIRST MANAGEMENT CORP as the registered managing agent for this address as of 24 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (13 in the records we hold, 10 shown)
- 34-17 30 Street41 open violations · no reviews yet
- 31-76 33 Street33 open violations · no reviews yet
- 32-21 37 Street25 open violations · no reviews yet
Show 7 moreShow fewer
- 25-34 Crescent Street21 open violations · no reviews yet
- 30-44 29 Street16 open violations · no reviews yet
- 25-38 Astoria Boulevard14 open violations · no reviews yet
- 31-59 34 Street10 open violations · no reviews yet
- 14-14 28 Avenue9 open violations · no reviews yet
- 25-25 Newtown Avenue4 open violations · no reviews yet
- 27-37 27 Street1 open violation · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
21-39 27TH STREET LP
Public records list 21-39 27TH STREET LP as the owner of record for this address as of 24 Sept 2026. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
21-39 27 Street, Astoria, NY 11105
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 5 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- A court found the owner at the time harassed tenants here (2022). Ask whether the building has changed hands since.
- There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There were 3 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 48 open housing violations: 5 immediately hazardous, 31 hazardous and 12 non-hazardous. Paperwork filings, such as a late registration, are not counted.
On 15 Jan 2020. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
No heat or hot-water complaints or violations were recorded here in the 2025–26 heat season.
City marshals carried out 3 residential evictions here since 2017. The record says nothing about why, and most follow a case for unpaid rent.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4008570018 · Block 857, Lot 18 · Building class C1
