24-20 27 Street, Astoria, NY 11102
Built 1931 · 3-story walk-up · 6 apartments
8 immediately hazardous violations open. 21 open in all. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 218 · 10 · 3
- Public record
- Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 5 | 1 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 so far | 0 | 0 |
Plus 89 violations from 2012 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Heat and hot water 4
- Electrical 1
- Walls and ceilings 1
- Open per apartment
- 3.5 (21 open across 6 apartments)
- Inspector last found a problem
- 15 Jan 2022 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 0 | 0 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous8 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west
Issued 15 Jan 2022Notice sent out 17 Jan 2022Heat and hot water§ 27-2031
Provide ready access to buildings heating system ''locked door to cellar''
Issued 8 Jan 2022Notice sent out 9 Jan 2022Heat and hot water§ 27-2033
Provide ready access to buildings heating system door locked leading to boiler room at cellar
Issued 21 Dec 2021Invalid certification 30 Dec 2021Heat and hot water§ 27-2033
Provide ready access to buildings heating system. cellar door look at boiler room
Issued 16 Nov 2021Notice sent out 16 Nov 2021Heat and hot water§ 27-2033
Arrange and make self-closing the doors.. in the entrance, 3rd story at north
Issued 22 Mar 2021Notice sent out 23 Mar 2021Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors, in the entrance, 3rd story at west
Issued 14 Feb 2021Notice sent out 17 Feb 2021Fire and safety equipment§ 27-2005 +1
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at west
Issued 14 Feb 2021Invalid certification 25 Feb 2021Heat and hot water§ 27-2029
Provide ready access to buildings heating system lock door at boiler room
Issued 14 Feb 2021Invalid certification 25 Feb 2021Heat and hot water§ 27-2033
Hazardous10 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Replace with new the broken or defective electrical outlet on west wall in the kitchen, 3rd story at west
Issued 15 Jan 2022Notice sent out 17 Jan 2022Electrical§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & all walls in the bathroom, 3rd story at north
Issued 22 Mar 2021Notice sent out 23 Mar 2021Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... approx 8 sq ft at the west and south wall in the 4th room from east at south, 3rd story at west original violation 14027390 issued 14-feb-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 14 Feb 2021First no access to re- inspect violation 20 Mar 2022Mold and damp§ 27-2017.3
Properly repair the source and abate the evidence of a water leak at the ceiling, west and east wall in the bathroom, 3rd story at west
Issued 14 Feb 2021Notice sent out 17 Feb 2021Leaks and plumbing§ 27-2026
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at the south wall in the 3rd room from east, 3rd story at west original violation 14027391 issued 14-feb-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 14 Feb 2021First no access to re- inspect violation 20 Mar 2022Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... north wall in the 1st room from north at west, 3rd story
Issued 31 Jan 2021Defect letter issued 27 May 2021Mold and damp§ 27-2017.3
Provide adequate supply of hot water for the fixtures low volume at wash basin in the bathroom, 3rd story at west
Issued 29 Nov 2017Notice sent out 30 Nov 2017Heat and hot water§ 27-2024
Repair the broken or defective plastered surfaces and paint in a uniform color south wall under wash basin in the bathroom, 3rd story
Issued 25 Oct 2017Notice sent out 25 Oct 2017Walls and ceilings§ 27-2005
Repair the leaky and/or defective faucets hot and cold water in the kitchen, 3rd story
Issued 18 Oct 2017Notice sent out 18 Oct 2017Leaks and plumbing§ 27-2026
Provide adequate supply of hot water for the fixtures washbasin in the bathroom, 3rd story
Issued 26 Jun 2017Notice sent out 27 Jun 2017Heat and hot water§ 27-2024
Non-hazardous3 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom, 3rd story
Issued 26 May 2021Notice sent out 31 May 2021Walls and ceilings§ 27-2005
Refit door in the bathroom, 3rd story at north
Issued 22 Mar 2021Notice sent out 23 Mar 2021Doors and windows§ 27-2005
Paint metal in accordance with dept. regulation riser pipe at west in the bathroom, 3rd story
Issued 21 Nov 2018Notice sent out 25 Nov 2018Walls and ceilings§ 27-2005
74 closed violations, plus 15 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Repair the broken or defective rain leader on south exterior wall
Issued 15 Jan 2022Violation dismissed 11 May 2022Walls and ceilings§ 27-2027
×5Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at west
5 issued 26 Dec 2017 to 15 Jan 2022Violation closedHeat and hot water§ 27-2029
Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west
Issued 21 Dec 2021Violation closed 13 Jan 2022Heat and hot water§ 27-2031
Trace and repair the source and abate the visible mold condition... at ceiling north & west walls ( apprx. 10 sq. ft.) in the bathroom, 3rd story at north original violation 14085054 issued 22-mar-21 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Issued 22 Mar 2021Violation closed 13 Aug 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 12 sq ft at the ceiling in the bathroom, 3rd story at west original violation 14027394 issued 14-feb-21 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Issued 14 Feb 2021Violation closed 13 Aug 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... ceiling in the bathroom, 3rd story original violation 14012093 issued 31-jan-21 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Issued 31 Jan 2021Violation closed 13 Aug 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 8 sq ft at the west and south wall in the 4th room from east at south, 3rd story at west
Issued 14 Feb 2021Violation closed 17 Jun 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at the south wall in the 3rd room from east, 3rd story at west
Issued 14 Feb 2021Violation closed 17 Jun 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... at ceiling north & west walls ( apprx. 10 sq. ft.) in the bathroom, 3rd story at north
Issued 22 Mar 2021Violation closed 28 May 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... approx 12 sq ft at the ceiling in the bathroom, 3rd story at west
Issued 14 Feb 2021Violation closed 28 May 2021Mold and damp§ 27-2017.3
Trace and repair the source and abate the visible mold condition... ceiling in the bathroom, 3rd story
Issued 31 Jan 2021Violation closed 28 May 2021Mold and damp§ 27-2017.3
Provide ready access to buildings heating system door locked cellar at boiler room
Issued 31 Jan 2021Violation dismissed 22 Apr 2021Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at north
Issued 31 Jan 2021Violation closed 23 Feb 2021Heat and hot water§ 27-2029
Provide ready access to buildings heating system door locked at boiler room
Issued 21 Nov 2018Violation dismissed 6 Feb 2019Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story
Issued 21 Nov 2018Violation dismissed 6 Feb 2019Heat and hot water§ 27-2029
Properly repair with similar material the broken or defective ceremic floor tiles in the bathroom, 3rd story at north
Issued 25 Jan 2018Violation closed 18 Jun 2018Floors and stairs§ 27-2005
Properly repair the broken or defective window upper sash counter balances in the 2nd room from north, 3rd story at north
Issued 25 Jan 2018Violation closed 18 Jun 2018Doors and windows§ 27-2005
Repair the broken or defective connection wasteline at washbasin in the bathroom, 3rd story
Issued 30 Dec 2017Violation closed 18 Jun 2018§ 27-2026
Refit all windows in the entire apartment, 3rd story
Issued 30 Dec 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom, 3rd story
Issued 30 Dec 2017Violation closed 18 Jun 2018Floors and stairs§ 27-2005
Repair the leaky and/or defective faucets at wash/basin in the bathroom, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018Leaks and plumbing§ 27-2026
Properly repair the broken or defective lower window sash in the kitchen, 3rd story
Issued 26 Dec 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective ceramic-tiles floor in the bathroom, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018Floors and stairs§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from east at north, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from east at south, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2005
Repair the flushing apparatus and maintain same so as to flush effectively the water closet.. in the bathroom, 3rd story at west
Issued 26 Dec 2017Violation closed 18 Jun 2018§ 27-2026
Properly repair the broken or defective upper sash at west window in the 3rd room from east, 3rd story
Issued 26 Dec 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Provide adequate supply of cold water for the fixtures low volume at wash basin in the bathroom, 3rd story at west
Issued 29 Nov 2017Violation closed 18 Jun 2018§ 27-2024
Properly repair the broken or defective south 2 window upper sash counter balance in the 3rd room from east, 3rd story at west
Issued 29 Nov 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Properly repair the broken or defective windows counter balance upper and lower sash in the 2nd room from north, 3rd story
Issued 25 Oct 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Properly repair the broken or defective windows counter balance upper and lower sash in the 1st room from north at west, 3rd story
Issued 25 Oct 2017Violation closed 18 Jun 2018Doors and windows§ 27-2005
Provide adequate supply of cold water for the fixtures washbasin in the bathroom, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018§ 27-2024
Provide an adequate supply of gas to the fixtures gas-range in the kitchen, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018Appliances§ 27-2070
Properly repair the source and abate the evidence of a water leak ceiling. in the kitchen, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018Leaks and plumbing§ 27-2026
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2013
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department all walls. in the kitchen, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the bathroom, 3rd story
Issued 26 Jun 2017Violation closed 18 Jun 2018Walls and ceilings§ 27-2005
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 3rd story at west
Issued 28 Jan 2016Violation closed 18 Jun 2018Fire and safety equipment§ 27-2046.1
Repair the leaky and/or defective faucets at bathtub in the bathroom, 3rd story at west
Issued 28 Jan 2016Violation closed 18 Jun 2018Leaks and plumbing§ 27-2026
Repair or replace the smoke detector defective in the entire apartment, 3rd story at west
Issued 28 Jan 2016Violation closed 18 Jun 2018Fire and safety equipment§ 27-2045
Properly repair the broken or defective window counter balance lower sash in the 2nd room from east at north, 3rd story at north
Issued 9 Aug 2014Violation closed 18 Jun 2018Doors and windows§ 27-2005
Repair or replace the smoke detector missing in the entire apartment, 3rd story at north
Issued 9 Aug 2014Violation closed 18 Jun 2018Fire and safety equipment§ 27-2045
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 3rd story
Issued 19 Sept 2012Violation closed 18 Jun 2018Walls and ceilings§ 27-2005
Properly repair the broken or defective wood floors in the entire apartment, 3rd story
Issued 6 Aug 2012Violation closed 18 Jun 2018Floors and stairs§ 27-2005
Repair the roof so that it will not leak over in the kitchen, 3rd story
Issued 6 Aug 2012Violation closed 18 Jun 2018Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the kitchen, 3rd story
Issued 6 Aug 2012Violation closed 18 Jun 2018Walls and ceilings§ 27-2005
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Issued 16 May 2017Violation closed 21 May 2018Heat and hot water§ 27-2033
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system.. at public hall, 1st story
Issued 9 Jan 2017Violation closed 21 May 2018Heat and hot water§ 27-2033
Provide ready access to buildings heating system door locked. at boiler room
Issued 26 Dec 2017Violation closed 11 Apr 2018Heat and hot water§ 27-2033
Remove the illegal fastening double cylinder lock at the vestibule door to public hall, 1st story
Issued 3 Nov 2017Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Properly repair the broken or defective mortise lock at vestibule door at public hall, 1st story
Issued 11 Sept 2017Violation closed 11 Apr 2018Doors and windows§ 27-2005
Remove the illegal fastening double cylinder key operated lock at the vestibule door at public hall, 1st story
Issued 11 Sept 2017Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Remove the illegal fastening double cylinder lock on vestbule door at public hall, 1st story
Issued 7 Sept 2017Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Abate the nuisance consisting of uncapped radiator steam pipe at public hall, 1st story
Issued 7 Sept 2017Violation closed 11 Apr 2018Heat and hot water§ 27-2005 +1
Remove the illegal fastening double cylinder lock on the vestibule door at public hall, 1st story
Issued 26 Jun 2017Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Gas range in the kitchen, 3rd story
Issued 16 May 2017Violation closed 11 Apr 2018Appliances§ 27-2070
Provide ready access to buildings heating system door to cellar locked at public hall, 1st story
Issued 16 May 2017Violation closed 11 Apr 2018Heat and hot water§ 27-2033
Provide hot water at all hot water fixtures in the entire apartment, 3rd story
Issued 16 May 2017Violation closed 11 Apr 2018Heat and hot water§ 27-2031
Remove the illegal fastening double cylinder key operated vestibule door lock at public hall, 1st story
Issued 28 Jan 2016Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Remove the illegal fastening double cylinder key operated lock at door from vestibule to public hall, 1st story
Issued 9 Aug 2014Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Remove the illegal fastening double cylinder lock on vestibule door at public hall, 1st story
Issued 9 Apr 2014Violation closed 11 Apr 2018Doors and windows§ 27-2005 +1
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Issued 19 Sept 2012Violation closed 11 Apr 2018Walls and ceilings§ 27-2013
Remove all encumbrances consisting of building materials, and construction debri obstructing egress 3rd. story to bulkhead at public hall
Issued 19 Sept 2012Violation closed 11 Apr 2018Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective fire retard plaster ceiling at public hall, 3rd story
Issued 19 Sept 2012Violation closed 11 Apr 2018Walls and ceilings§ 27-2005
Provide an adequate supply of gas to the fixtures at rarange in the kitchen, 3rd story at west
Issued 14 Aug 2017Violation closed 10 Oct 2017§ 27-2070
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 2; in the entire apartment, 3rd story
Issued 16 May 2017Violation dismissed 13 Aug 2017Fire and safety equipment§ 27-2043.1
Remove the illegal fastening double cylinder key operated vestibule door lock at public hall, 1st story
Issued 6 Mar 2017Violation dismissed 31 May 2017Doors and windows§ 27-2005 +1
Abate the nuisance consisting of disconnected radiator at public hall, 1st story
Issued 9 Apr 2014Violation closed 19 May 2014Heat and hot water§ 27-2005 +1
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 3rd story
Issued 10 Nov 2012Violation dismissed 3 Mar 2013Fire and safety equipment§ 27-2046.1
110 violations on record in total, 21 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
No complaints from this building in the last three years. Worth knowing what that does and does not mean: tenants who expect nothing to happen often stop calling.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
6 cases, all closed.
Heat and Hot Water
Opened 14 Feb 2022
Tenant Action/Harassment
Opened 10 May 2021
Heat and Hot Water
Opened 4 Mar 2021
Heat and Hot Water
Opened 5 Dec 2018
Heat and Hot Water
Opened 31 Jan 2018
False Certification Non-Lead
Opened 14 Jan 2013
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 6 earlier reportsShow fewer
- 2024No infested units reported (2023 report)
- 2023No infested units reported (2022 report)
- 2023No infested units reported (2021 report)
- 2022No infested units reported (2021 report)
- 2022No infested units reported (2020 report)
- 2021No infested units reported (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
VASILIOS LITOS
Public records list VASILIOS LITOS as the registered managing agent for this address as of 25 Aug 2025. Source: HPD registration.
Owner of record
LITOS LLC
Public records list LITOS LLC as the owner of record for this address as of 25 Aug 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
24-20 27 Street, Astoria, NY 11102
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 8 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- There are 3 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 0 complaints in the last twelve months.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 21 open housing violations: 8 immediately hazardous, 10 hazardous and 3 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for heat and hot water (4), electrical (1) and walls and ceilings (1).
On 15 Jan 2022. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
No heat or hot-water complaints or violations were recorded here in the 2025–26 heat season.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 4008520042 · Block 852, Lot 42 · Building class C2
