ByTenantsByTenants home

25-02 Steinway Street, Astoria, NY 11103

Built 1929 · 4-story walk-up with stores · 40 apartments

31 immediately hazardous violations open. 95 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
9531 · 51 · 13
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202210
2023131
202466
2025200
2026 so far163

Plus 37 violations from 1990 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 20
  • Walls and ceilings 14
  • Doors and windows 12
Open per apartment
2.4 (95 open across 40 apartments)
Inspector last found a problem
28 Sept 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 10 days.

WinterDaysComplaintsViolations
2025–2610170
2026–27 (so far)110

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous31 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Abate the nuisance consisting of air conditioner installed at window to fire escape in the 1st room from east at south, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective lower window sash counterbalance at 1st window from north at east in the 1st room from east at south, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Doors and windows§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026§ 27-2026

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door locked at basement at boiler room

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Heat and hot water§ 27-2033

  • Provide ready access to buildings heating system boiler room door locked at cellar at boiler room

    Issued 27 Sept 2026Notice sent out 29 Sept 2026Heat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at north

    Issued 27 Sept 2026Notice sent out 29 Sept 2026Heat and hot water§ 27-2031

  • Properly repair or replace the broken or defective looking device assembly at vestibule door at public hall, 1st story

    Issued 15 Sept 2025Notice sent out 16 Sept 2025Doors and windows§ 27-2005

  • ×3Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    3 issued 29 Nov 2020 to 13 Feb 2025Notice sent outLead paint§ 27-2056.4

Show all 31
  • ×2Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    2 issued 8 Jul 2021 to 13 Feb 2025Notice sent outLead paint§ 27-2056.7

  • Properly repair or replace the broken or defective broken glass pane lower window sash at 1st window from north at east in the 1st room from east at north, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Doors and windows§ 27-2005

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice of issuance sent to tenant 6 Feb 2025Pests§ 27-2017.4

  • Properly repair or replace the broken or defective spring balance lower window sash at 2nd window from north at east, fire escape window in the 1st room from east at south, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Fire and safety equipment§ 27-2005

  • Remove the illegal fastening double cylinder locking device installed on street entrance door to building, 1st story

    Issued 12 Dec 2024Notice sent out 12 Dec 2024Doors and windows§ 27-2005 +1

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at west

    Issued 9 Aug 2023Notice of issuance sent to tenant 9 Aug 2023Pests§ 27-2017.4

  • Replace or repair the self-closing doors that is missing or defective.. in the entrance, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Fire and safety equipment§ 27-2005 +3

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at west

    Issued 9 Aug 2023Notice of issuance sent to tenant 9 Aug 2023Pests§ 27-2017.4

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment; in the entire apartment, 2nd story at north

    Issued 31 Dec 2020Notice sent out 4 Jan 2021Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 3rd story at south, section at north

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 1st story at west, 1st section from west at north

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 4th story at west, 1st section from west at north

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 4th story at south, section at north

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 4th story at east, section at north

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 4th story at north, section at south

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment... in the entire apartment, 1st story at north, section at south

    Issued 29 Nov 2020Notice sent out 30 Nov 2020Lead paint§ 27-2056.8

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 18 Mar 2020Notice sent out 14 May 2020Lead paint§ 27-2056.4 +1

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner

    Issued 4 Sept 2009Notice sent out 25 Oct 2009§ 27-2056.7

Hazardous51 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Fire and safety equipment§ 27-2045 +2

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Fire and safety equipment§ 27-2045 +3

  • Repair the leaky and/or defective faucets bathtub in the bathroom, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Leaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective latch at bulkhead door at public hall, 4th story, section ''4a-11d''

    Issued 20 Apr 2026Notice sent out 20 Apr 2026Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at south wall at bulkhead stairs at public hall, 4th story

    Issued 20 Apr 2026Notice sent out 20 Apr 2026Floors and stairs§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd, 3rd and 4th story balconies north stack at building front at fire escape

    Issued 15 Sept 2025Notice sent out 16 Sept 2025Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ladder and household items 4th story balcony 3rd stack from south building front at fire escape, section at north

    Issued 7 Aug 2025Notice sent out 10 Aug 2025Fire and safety equipment§ 27-2005 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at west, 1st section from west at north

    Issued 9 Apr 2025Notice sent out 13 Apr 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at west, 1st section from west at north

    Issued 9 Apr 2025Notice sent out 13 Apr 2025Lead paint§ 27-2056.7 +2

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at north, 1st section from east at south

    Issued 9 Apr 2025Notice sent out 13 Apr 2025Lead paint§ 27-2056.7 +2

Show all 51
  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at south, 1st section from west at north

    Issued 9 Apr 2025Notice sent out 13 Apr 2025Lead paint§ 27-2056.7 +2

  • Repair or replace the smoke detector missing in the entire apartment, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Fire and safety equipment§ 27-2046.1

  • Properly repair or replace the broken or defective spring balance lower window sash at 1st window from south at west in the kitchen, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective spring balance lower window sash at 1st and 2nd windows from west at north in the 3rd room from east, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective spring balance lower window sash at 1st window from north at east in the 1st room from east at south, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective spring balance upper and lower window sashes at 2nd window from north at east in the 1st room from east at north, 2nd story at east, section ''north''

    Issued 6 Feb 2025Notice sent out 6 Feb 2025Doors and windows§ 27-2005

  • Refit building entrance door at public hall, 1st story

    Issued 7 Jan 2024Notice sent out 7 Jan 2024Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant plaster at all walls to bulkhead at public hall, 4th story, section at north

    Issued 7 Jan 2024Notice sent out 7 Jan 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective 6th marble thread at stairs from bottom to intermediate landing at north section at public hall, 1st story

    Issued 7 Jan 2024Notice sent out 7 Jan 2024Floors and stairs§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 4th story balcony west stack, building front. at fire escape

    Issued 3 Jan 2024Notice sent out 9 Jan 2024Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 1st room from east at south, 3rd story at west

    Issued 9 Aug 2023Notice sent out 9 Aug 2023Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, north wall, southwall, west wall and ceiling in the bathroom, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective cabinet door in the kitchen, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Doors and windows§ 27-2005

  • Remove all obstructions and repair all defects in wasteline under sink in the kitchen, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective upper window sash in the bathroom, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective upper sash at fire escape window in the 1st room from east, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Fire and safety equipment§ 27-2005

  • Remove all encumbrances consisting of bicycles at public hall at north, 1st story

    Issued 3 May 2023Notice sent out 3 May 2023Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective fire retardant materials at west, east & north walls at 1st public hall bulkhead from north, 4th story

    Issued 3 May 2023Notice sent out 3 May 2023Walls and ceilings§ 27-2005

  • Remove all encumbrances consisting of household items at public hall, 1st story

    Issued 28 Feb 2022Notice sent out 1 Mar 2022Fire and safety equipment§ 27-2005 +1

  • ×2Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 1st story at north

    2 issued 12 Sept 2021 to 26 Sept 2021Notice sent outLead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 2nd story at east

    Issued 26 Sept 2021Notice sent out 29 Sept 2021Lead paint§ 27-2056.7 +1

  • Properly repair with similar material the broken or defective fire retardant materials consisting of plaster at south wall at bulkhead

    Issued 26 Sept 2021Notice sent out 5 Oct 2021Walls and ceilings§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at east

    Issued 12 Sept 2021Notice sent out 15 Sept 2021Lead paint§ 27-2056.7 +1

  • Properly repair with similar material the broken or defective fire retardant material at all walls at bulkhead, 1st section from north at east

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Walls and ceilings§ 27-2005

  • Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line in the entire apartment, 1st story at north

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Fire and safety equipment§ 27-2005 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Lead paint§ 27-2056.7 +1

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 4th story at north

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Lead paint§ 27-2056.7 +1

  • Properly repair with similar material the broken or defective fire retardant material at all walls and ceilings at public hall stairs, 1st section from north at east

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Floors and stairs§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 2nd story at east

    Issued 14 Jul 2021Notice sent out 14 Jul 2021Fire and safety equipment§ 27-2046.1

  • Properly repair with similar material the broken or defective sheetrock at ceiling in the bathroom, 2nd story at east

    Issued 14 Jul 2021Notice sent out 14 Jul 2021Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 2nd story at east

    Issued 14 Jul 2021Notice sent out 14 Jul 2021Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective, 1st story at west

    Issued 13 Jan 2021Notice sent out 14 Jan 2021Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defectiive, 1st story at west

    Issued 13 Jan 2021Notice sent out 14 Jan 2021Fire and safety equipment§ 27-2045

  • Properly repair the broken or defective key operated locking mechanism at entrance door to building

    Issued 29 Nov 2007Notice sent out 2 Dec 2007Doors and windows§ 27-2005

  • Provide an adequate supply of gas to the fixtures at 4 sty north east an apartment., section '' ''

    Issued 1 Aug 1994Notice sent out 15 Aug 1994§ 27-2070

  • Properly repair with similar material the broken or defective cement block hole boiler room walls.

    Issued 28 Jun 1990Notice sent out 16 Jul 1990Heat and hot water§ 27-2005

  • Remove all encumbrances consisting of building materials & old appliances 1 sty pub hall north & south section.

    Issued 7 Jun 1990Notice sent out 16 Jul 1990Fire and safety equipment§ 27-2005 +1

Non-hazardous13 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom, 2nd story at east, section at south

    Issued 28 Sept 2026Notice sent out 29 Sept 2026Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department south wall at bulkhead stairs at public hall, 4th story

    Issued 20 Apr 2026Notice sent out 20 Apr 2026Floors and stairs§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at south wall at bulkhead, 4th story

    Issued 26 Aug 2024Notice sent out 26 Aug 2024Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department south wall at bulkhead, 4th story

    Issued 26 Aug 2024Notice sent out 26 Aug 2024Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak south wall at bulkhead, 4th story

    Issued 26 Aug 2024Notice sent out 26 Aug 2024Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department at all walls to bulkhead at public hall, 4th story, section at north

    Issued 7 Jan 2024Notice sent out 7 Jan 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at all walls at public hall, 4th story

    Issued 6 Jan 2024Notice sent out 7 Jan 2024Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective at all walls at public hall, 4th story

    Issued 6 Jan 2024Notice sent out 7 Jan 2024Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation riser pipe in the bathroom, 3rd story at west

    Issued 9 Aug 2023Notice sent out 10 Aug 2023Walls and ceilings§ 27-2005

Show all 13
  • Paint with light colored paint to the satisfaction of this department at south wall at bulkhead

    Issued 26 Sept 2021Notice sent out 5 Oct 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department fire retardant material at all walls at bulkhead, 1st section from north at east

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at all walls and ceilings at public hall stairs, 1st section from north at east

    Issued 8 Sept 2021Notice sent out 12 Sept 2021Floors and stairs§ 27-2013

Paperwork and notices6 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • ×4File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    4 issued 29 Mar 2023 to 7 May 2026Notice sent outPaperwork and notices

  • ×2Owner failed to file a valid registration statement with the department as required by adm code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    2 issued 2 Dec 2024 to 21 Nov 2025Info notice sent outPaperwork and notices§ 27-2107

8 closed violations, plus 9 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story

    Issued 24 Apr 2026Violation closed 11 Aug 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at vestibule door to building at public hall, 1st story, section ''4a-11d''

    Issued 20 Apr 2026Violation closed 11 Aug 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at bulkhead door at public hall, 4th story, section ''4a-11d''

    Issued 20 Apr 2026Violation closed 20 May 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges vestibule door to public hall, 1st story

    Issued 7 Aug 2025Violation closed 16 Jan 2026Fire and safety equipment§ 27-2005 +3

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment, 2nd story at east, section ''north''

    Issued 6 Feb 2025Violation dismissed 30 Aug 2025Fire and safety equipment§ 27-2043.1

  • Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story

    Issued 7 Jan 2024Violation closed 31 Jul 2024Fire and safety equipment§ 27-2005 +3

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 2nd story at east

    Issued 14 Jul 2021Violation closed 3 Oct 2021Leaks and plumbing§ 27-2026

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment, 1st story at west

    Issued 13 Jan 2021Violation closed 10 Jun 2021Fire and safety equipment§ 27-2043.1

118 violations on record in total, 101 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

62 complaints in three years, 36 of them in the last twelve months.

  • Heat and hot water24 / 39
  • Garbage and cleanliness8 / 12
  • Leaks and plumbing4 / 6
  • Entry, buzzer and mail0 / 1
  • Doors and windows0 / 1
  • Mold and damp0 / 1
  • Noise0 / 1
  • Walls and ceilings0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2022No infested units reported (2020 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

The most recent registration on file for this address expired 29 Sept 2024 and has not been renewed since, so it is more than a full cycle old. Whoever is named below may no longer be responsible for the building.

  • Registered managing agent

    NICHOLAS SPORTELLI

    Public records list NICHOLAS SPORTELLI as the registered managing agent for this address as of 12 Jul 2023. Source: HPD registration.

    Other buildings listed under this agent (2 in the records we hold)

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    FLAVIO REALTY CORP

    Public records list FLAVIO REALTY CORP as the owner of record for this address as of 12 Jul 2023. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 31 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 24 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. The owner has filed a bedbug report for this building (most recently for the year ending 2022). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1929 and has 24 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4006540062 · Block 654, Lot 62 · Building class C7