ByTenantsByTenants home

25-70 37 Street, Astoria, NY 11103

Built 1926 · 4-story walk-up · 16 apartments

9 immediately hazardous violations open. 89 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
899 · 49 · 31
Public record
Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
2022149
202361
20244311
2025132
2026 so far00

Plus 228 violations from 2008 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Leaks and plumbing 20
  • Heat and hot water 16
  • Fire and safety equipment 16
Open per apartment
5.6 (89 open across 16 apartments)
Inspector last found a problem
24 Dec 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 3 days.

WinterDaysComplaintsViolations
2025–26360

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous9 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at east

    Issued 27 Jun 2025Notice of issuance sent to tenant 29 Jun 2025Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at east

    Issued 27 Jun 2025Notice of issuance sent to tenant 29 Jun 2025Pests§ 27-2017.4

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Fire and safety equipment§ 27-2043.1

  • Provide adequate supply of hot water for the fixtures at kitchen sink in the kitchen, 4th story at north

    Issued 8 May 2024Notice sent out 8 May 2024Heat and hot water§ 27-2024

  • Remove the illegal fastening consisting of slidebolt with eye capable of being padlocked at bulkhead door at public hall, 4th story

    Issued 8 May 2024Notice sent out 8 May 2024Doors and windows§ 27-2005 +1

  • Properly repair or replace the broken or defective upper sash spring balance at west fire escape window in the 4th room from east, 4th story at west

    Issued 1 May 2024Notice sent out 1 May 2024Fire and safety equipment§ 27-2005

  • Properly repair or replace the broken or defective sweep lock at fire escape window on west wall in the 4th room from east, 4th story at west

    Issued 4 Apr 2024Notice sent out 8 Apr 2024Fire and safety equipment§ 27-2005

  • Provide adequate supply of hot water for the fixtures no running hot water at kitchen sink in the kitchen, 4th story at west

    Issued 2 Apr 2024Notice sent out 2 Apr 2024Heat and hot water§ 27-2024

  • Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment, 4th story at west

    Issued 5 Sept 2023Invalid certification 15 Sept 2023Heat and hot water§ 27-2005 +1

Hazardous49 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair or replace the broken or defective light fixture at the ceiling in the kitchen, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective connection drain pipe at wash basin in the bathroom, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Leaks and plumbing§ 27-2026

  • Repair or replace the smoke detector missing in the entire apartment, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Fire and safety equipment§ 27-2046.1

  • Repair the broken or defective connection waste pipe at sink in the kitchen, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Leaks and plumbing§ 27-2026

  • Remove the illegal fastening lockable slidebolt installed on door to bulkhead

    Issued 13 May 2024Notice sent out 15 May 2024Doors and windows§ 27-2005 +1

  • Provide wire screen below skylight at bulkhead

    Issued 13 May 2024Notice sent out 15 May 2024Roof and outside the building§ 27-2005

  • Remove all obstructions and repair all defects in waste line at wash basin in the bathroom, 4th story at north

    Issued 8 May 2024Notice sent out 8 May 2024Leaks and plumbing§ 27-2026

  • Provide adequate supply of hot water for the fixtures at washbasin in the kitchen, 4th story at west

    Issued 1 May 2024Notice sent out 5 May 2024Heat and hot water§ 27-2024

  • Provide adequate supply of hot water for the fixtures at sink in the kitchen, 4th story at west

    Issued 18 Apr 2024Notice sent out 21 Apr 2024Heat and hot water§ 27-2024

Show all 49
  • Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north fire escape building front at fire escape

    Issued 12 Apr 2024Notice sent out 15 Apr 2024Fire and safety equipment§ 27-2005

  • ×2Remove all obstructions and repair all defects in wash basin in the bathroom, 4th story at west

    2 issued 29 Mar 2024 to 7 Apr 2024Notice sent out§ 27-2026

  • Refit upper sash at fire escape window at west wall in the 2nd room from east, 4th story at west

    Issued 7 Apr 2024Notice sent out 8 Apr 2024Fire and safety equipment§ 27-2005

  • Provide adequate supply of cold water for the fixtures at shower in the bathroom, 4th story at west

    Issued 7 Apr 2024Notice sent out 7 Apr 2024Leaks and plumbing§ 27-2024

  • Properly repair or replace the broken or defective stopper at batht\ub in the bathroom, 4th story at west

    Issued 7 Apr 2024Notice sent out 7 Apr 2024§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at east and west wall at 1st public hall bulkhead from north, 4th story

    Issued 7 Apr 2024Notice sent out 7 Apr 2024Walls and ceilings§ 27-2005

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 4th story at west

    Issued 7 Apr 2024Notice sent out 7 Apr 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at east wall at public hall, 4th story

    Issued 4 Apr 2024Notice sent out 7 Apr 2024Leaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective pop up stopper at wash basin in the bathroom, 4th story

    Issued 4 Apr 2024Notice sent out 7 Apr 2024§ 27-2005

  • Properly repair with similar material the broken or defective porcelain enamel glazing at interior of bathtub in the bathroom, 4th story

    Issued 4 Apr 2024Notice sent out 8 Apr 2024Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective latch at fire escape window in the 4th room from east at north, 4th story

    Issued 4 Apr 2024Notice sent out 8 Apr 2024Fire and safety equipment§ 27-2005

  • Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front at fire escape

    Issued 4 Apr 2024Notice sent out 7 Apr 2024Fire and safety equipment§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 4th story at west

    Issued 4 Apr 2024Notice sent out 7 Apr 2024Floors and stairs§ 27-2005

  • Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom, 4th story

    Issued 4 Apr 2024Notice sent out 7 Apr 2024§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 4th story

    Issued 4 Apr 2024Notice sent out 7 Apr 2024Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective wash basin in the bathroom, 4th story at west

    Issued 2 Apr 2024Notice sent out 2 Apr 2024§ 27-2005

  • Properly repair or replace the broken or defective counter balance upper sash window at west 2 in the 4th room from east, 4th story at west

    Issued 2 Apr 2024Notice sent out 2 Apr 2024Doors and windows§ 27-2005

  • Repair the roof so that it will not leak over ceiling at public hall, 4th story

    Issued 29 Mar 2024Notice sent out 31 Mar 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling, west and east walls at public hall, 4th story

    Issued 29 Mar 2024Notice sent out 31 Mar 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 4th story

    Issued 13 Sept 2023Notice sent out 13 Sept 2023Walls and ceilings§ 27-2005

  • Properly repair the broken or defective spring blance at lower sash at the window at the west wall in the 2nd room from north, 4th story at north

    Issued 6 Apr 2023Notice sent out 6 Apr 2023Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at the south wall in the kitchen, 4th story at north

    Issued 6 Apr 2023Notice sent out 6 Apr 2023Walls and ceilings§ 27-2005

  • Properly repair the broken or defective spring blance at lower sash at the window at the north wall in the 1st room from north, 4th story at north

    Issued 6 Apr 2023Notice sent out 6 Apr 2023Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling, 4th story

    Issued 31 Oct 2022Notice sent out 1 Nov 2022Walls and ceilings§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 4th story at north

    Issued 18 Aug 2022Notice sent out 18 Aug 2022Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective porcelin enamel finish by method of reglazing bathtub in the bathroom, 4th story at north

    Issued 18 Aug 2022Notice sent out 18 Aug 2022Leaks and plumbing§ 27-2005

  • Repair the leaky and/or defective faucets at sink in the kitchen, 4th story at west

    Issued 19 Jul 2022Notice sent out 19 Jul 2022Leaks and plumbing§ 27-2026

  • Replace with new the broken or defective wood floor at threshold in the 3rd room from east, 4th story at west

    Issued 19 Jul 2022Notice sent out 19 Jul 2022Floors and stairs§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 4th story at west

    Issued 19 Jul 2022Notice sent out 20 Jul 2022Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom, 4th story at west

    Issued 19 Jul 2022Notice sent out 20 Jul 2022Leaks and plumbing§ 27-2005

  • Properly repair the broken or defective outlet at east wall in the bathroom, 4th story at north

    Issued 12 Jan 2022Not complied with 15 Mar 2022Electrical§ 27-2005

  • Properly repair with similar material the broken or defective wood floor. in the private hallway, 4th story at north

    Issued 14 Oct 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • ×2Properly repair with similar material the broken or defective wood floor. in the private hallway, 4th story at west

    2 issued 21 Sept 2021 to 7 Oct 2021Not complied withFloors and stairs§ 27-2005

  • Replace with new the missing vinyl floor tiles in the private hallway, 4th story at north

    Issued 9 May 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tile on floor in the bathroom, 4th story at west

    Issued 26 Apr 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the foyer, 4th story at west

    Issued 5 Apr 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 1st room from north, 4th story at north

    Issued 19 Dec 2020Not complied with 15 Mar 2022Floors and stairs§ 27-2005

Non-hazardous31 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department the north wall, east wall and south wall in the bathroom, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from east, 3rd story at east

    Issued 27 Jun 2025Notice sent out 29 Jun 2025Walls and ceilings§ 27-2013

  • Properly secure the loose electrical outlet at west wall in the kitchen, 4th story at north

    Issued 23 Apr 2024Notice sent out 24 Apr 2024Electrical§ 27-2005

  • Replace the broken or defective wash basin in the bathroom, 4th story at north

    Issued 23 Apr 2024Notice sent out 23 Apr 2024§ 27-2026

  • Properly repair or replace the broken or defective showerhead at bathtub in the bathroom, 4th story at west

    Issued 18 Apr 2024Notice sent out 21 Apr 2024Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective caulking at bathtub in the bathroom, 4th story at west

    Issued 18 Apr 2024Notice sent out 18 Apr 2024Leaks and plumbing§ 27-2005

  • Properly secure the loose handle at bath tub in the bathroom, 4th story at west

    Issued 10 Apr 2024Notice sent out 10 Apr 2024§ 27-2005

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 4th story at west

    Issued 10 Apr 2024Notice sent out 10 Apr 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic tile at floor in the bathroom, 4th story at west

    Issued 7 Apr 2024Notice sent out 7 Apr 2024Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at east and west wall at 1st public hall bulkhead from north, 4th story

    Issued 7 Apr 2024Notice sent out 7 Apr 2024Walls and ceilings§ 27-2013

Show all 31
  • Paint with light colored paint to the satisfaction of this department at east wall at public hall, 4th story

    Issued 4 Apr 2024Notice sent out 7 Apr 2024Walls and ceilings§ 27-2013

  • Paint metal in accordance with dept. regulation at entrance door in the foyer, 4th story at west

    Issued 2 Apr 2024Notice sent out 2 Apr 2024Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling, west and east walls leading to bulkhead door to roof at public hall, 4th story

    Issued 29 Mar 2024Notice sent out 31 Mar 2024Roof and outside the building§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling, 4th story

    Issued 31 Oct 2022Notice sent out 1 Nov 2022Walls and ceilings§ 27-2013

  • Properly repair the broken or defective drain stopper at bathtub in the bathroom, 4th story at north

    Issued 6 Aug 2022Notice sent out 7 Aug 2022Leaks and plumbing§ 27-2005

  • Repair the leaky and/or defective faucets at wash basin in the bathroom, 4th story at north

    Issued 6 Aug 2022Notice sent out 7 Aug 2022Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective grout between ceramic floor tiles in the bathroom, 4th story at west

    Issued 19 Jul 2022Notice sent out 20 Jul 2022Floors and stairs§ 27-2005

  • Replace with new the missing ceramic floor tiles in the bathroom, 4th story at west

    Issued 19 Jul 2022Notice sent out 20 Jul 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective grout between ceramic tiles at east wall and north wall in the bathroom, 4th story at west

    Issued 19 Jul 2022Notice sent out 20 Jul 2022Walls and ceilings§ 27-2005

  • Properly repair the broken or defective electrical outlet at the east wall in the bathroom, 4th story at north

    Issued 20 Dec 2021Not complied with 15 Mar 2022Electrical§ 27-2005

  • Properly repair the broken or defective bathtub drain lever in the bathroom, 4th story at west

    Issued 29 Nov 2021Not complied with 15 Mar 2022Leaks and plumbing§ 27-2005

  • Refit closet door at east wall. in the 1st room from north, 4th story at north

    Issued 14 Oct 2021Not complied with 15 Mar 2022Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tile floor. in the bathroom, 4th story at north

    Issued 14 Oct 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor. in the 1st room from north, 4th story at north

    Issued 14 Oct 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor. in the 3rd room from east, 4th story at west

    Issued 7 Oct 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tile floor. in the bathroom, 4th story at west

    Issued 7 Oct 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Refit door at closet at north wall. in the 4th room from east, 4th story at west

    Issued 7 Oct 2021Not complied with 15 Mar 2022Doors and windows§ 27-2005

  • Refit closet door. at north wall. in the 4th room from east, 4th story at west

    Issued 21 Sept 2021Not complied with 15 Mar 2022Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 3rd room from east, 4th story at west

    Issued 26 Apr 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the foyer, 4th story at west

    Issued 26 Apr 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the closets at north wall in the 4th room from east, 4th story at west

    Issued 5 Apr 2021Not complied with 15 Mar 2022Floors and stairs§ 27-2005

Paperwork and notices2 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • ×2Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    2 issued 6 Apr 2023Notice sent outPaperwork and notices§ 27-2104

238 closed violations, plus 5 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective hinge at in the entrance, 2nd story at west

    Issued 24 Dec 2025Violation closed 22 Jan 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective latch assembly on vestibule door to public hall, 1st story

    Issued 4 Mar 2025Violation dismissed 26 May 2025Doors and windows§ 27-2005

  • Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods building front at fire escape

    Issued 5 Mar 2025Violation closed 13 Apr 2025Fire and safety equipment§ 27-2005

  • Remove device preventing door from being self-closing wood wedge on fire door leading to west yard at public hall, 1st story

    Issued 5 Mar 2025Violation closed 19 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective latch vestibule door to public hall, 1st story

    Issued 4 Mar 2025Violation closed 19 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Provide adequate supply of hot water for the fixtures.. in the entire apartment, 4th story at west

    Issued 7 Apr 2024Violation closed 12 Aug 2024Heat and hot water§ 27-2024

  • Abate the nuisance consisting of hot water exceeding the maximum temperature of 13o degrees fahrenheit at all hot water fixtures in the entire apartment, 4th story at north

    Issued 8 May 2024Violation closed 3 Aug 2024Heat and hot water§ 27-2005 +1

  • Abate the nuisance consisting of hot water exceeding the maximum allowable temprature of 130 degrees at all hot water fixtures. in the bathroom, 4th story at west

    Issued 1 May 2024Violation closed 3 Aug 2024Heat and hot water§ 27-2005 +1

  • Abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees at bath tub in the bathroom, 4th story at west

    Issued 10 Apr 2024Violation closed 3 Aug 2024Heat and hot water§ 27-2005 +1

  • Abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment, 4th story at west

    Issued 4 Apr 2024Violation closed 3 Aug 2024Heat and hot water§ 27-2005 +1

  • Properly repair the source and abate the evidence of a water leak at north and south walls at public hall stairs, 4th story

    Issued 23 Apr 2024Violation dismissed 14 Jul 2024Leaks and plumbing§ 27-2026

  • Abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the bathroom, 4th story at north

    Issued 23 Apr 2024Violation dismissed 14 Jul 2024Heat and hot water§ 27-2005 +1

  • Remove the illegal fastening consisting of self locking push bar assembly at bulkhead door to roof at public hall stairs, 4th story

    Issued 23 Apr 2024Violation dismissed 14 Jul 2024Roof and outside the building§ 27-2005 +1

  • Abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit at wash basin in the bathroom, 4th story at west

    Issued 18 Apr 2024Violation dismissed 7 Jul 2024Heat and hot water§ 27-2005 +1

  • Properly repair or replace the broken or defective vestibule door latch assembly at public hall, 1st story

    Issued 29 Mar 2024Violation dismissed 19 Jun 2024Doors and windows§ 27-2005

  • Abate the nuisance consisting of scalding hot water at all hot water fixtures exceeding the maximum allowable temperature of 130 degrees in the entire apartment, 4th story at west

    Issued 29 Mar 2024Violation dismissed 13 Jun 2024Heat and hot water§ 27-2005 +1

  • Remove the illegal fastening self locking push bar assembly on bulkhead door at public hall, 4th story

    Issued 10 Apr 2024Violation closed 2 Jun 2024Doors and windows§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective ''latch'' at vestibule door at public hall, 1st story

    Issued 29 Mar 2024Violation closed 30 Apr 2024Fire and safety equipment§ 27-2005 +3

  • Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 4th story

    Issued 13 Sept 2023Violation dismissed 4 Jan 2024Walls and ceilings§ 27-2013

  • Repair the roof so that it will not leak over ceiling at public hall, 4th story

    Issued 13 Sept 2023Violation dismissed 6 Dec 2023Leaks and plumbing§ 27-2005

  • Properly repair the broken or defective sring balance at lower sash at window in the 4th room from east, 4th story at west

    Issued 31 Oct 2022Violation dismissed 22 Jan 2023Doors and windows§ 27-2005

  • Properly repair the broken or defective spring balance lower sash at window in the 3rd room from east, 4th story at west

    Issued 31 Oct 2022Violation dismissed 22 Jan 2023Doors and windows§ 27-2005

  • Properly repair the broken or defective spring balance upper and lower sash at window leading to fire escape in the 4th room from east, 4th story at west

    Issued 31 Oct 2022Violation dismissed 22 Jan 2023Fire and safety equipment§ 27-2005

  • Refit lower and upper sashes of window at west wall in the 3rd room from east, 4th story at west

    Issued 29 Oct 2022Violation dismissed 22 Jan 2023Doors and windows§ 27-2005

  • Properly repair the broken or defective counter balance of lower and upper sashes of window at west wall in the 3rd room from east, 4th story at west

    Issued 29 Oct 2022Violation dismissed 22 Jan 2023Doors and windows§ 27-2005

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information displayed at public hall, 1st story

    Issued 24 Jul 2022Violation dismissed 16 Oct 2022Heat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the bathroom, 4th story at west

    Issued 24 Jul 2022Violation dismissed 16 Oct 2022Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door locked at boiler room

    Issued 24 Jul 2022Violation dismissed 16 Oct 2022Heat and hot water§ 27-2033

  • Replace or repair the self-closing doors that is missing or defective in the entrance, 4th story at west

    Issued 15 Mar 2022Violation dismissed 7 Jun 2022Fire and safety equipment§ 27-2005 +2

  • Paint metal in accordance with dept. regulation the radiator in the 2nd room from east, 4th story at west

    Issued 29 Nov 2021Violation closed 15 Mar 2022Heat and hot water§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the first closet at north in the 2nd room from east, 4th story at west

    Issued 29 Nov 2021Violation closed 15 Mar 2022Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall near gas range in the kitchen, 4th story at west

    Issued 29 Nov 2021Violation closed 15 Mar 2022Appliances§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd closet at north in the 2nd room from east, 4th story at west

    Issued 29 Nov 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallway, 4th story at west

    Issued 5 Nov 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood subfloor in the private hallway, 4th story at west

    Issued 5 Nov 2021Violation closed 15 Mar 2022§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east, 4th story at west

    Issued 5 Nov 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Refit the closet door in the private hallway, 4th story at north

    Issued 18 Oct 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall and ceiling in the 1st room from north, 4th story

    Issued 18 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway, 4th story at north

    Issued 18 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department closet door frame in the 1st room from north, 4th story at north

    Issued 14 Oct 2021Violation closed 15 Mar 2022Doors and windows§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling. in the private hallway, 4th story at north

    Issued 14 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling. in the 1st room from north, 4th story at north

    Issued 14 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east, 4th story at north

    Issued 11 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the window stool in the 4th room from east, 4th story at north

    Issued 11 Oct 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway, 4th story at north

    Issued 11 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department door frame at apartment in the entrance, 4th story at west

    Issued 7 Oct 2021Violation closed 15 Mar 2022Doors and windows§ 27-2013

  • ×2Repair the broken or defective plastered surfaces and paint in a uniform color at north wall. in the private hallway, 4th story at west

    2 issued 21 Sept 2021 to 7 Oct 2021Violation closedWalls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall. in the 4th room from east, 4th story at west

    Issued 7 Oct 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling. in the 4th room from east, 4th story at west

    Issued 21 Sept 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department window frame at west wall. in the 4th room from east, 4th story at west

    Issued 21 Sept 2021Violation closed 15 Mar 2022Doors and windows§ 27-2013

  • Properly repair the broken or defective window frame in the 1st room from north at west, 4th story at north

    Issued 28 Aug 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Remove all obstructions and repair all defects in bathtub drain in the bathroom, 4th story at north

    Issued 28 Aug 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Replace with new the broken or defective sink base cabinet in the kitchen, 4th story at north

    Issued 28 Aug 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall behind gas range in the kitchen, 4th story at north

    Issued 28 Aug 2021Violation closed 15 Mar 2022Appliances§ 27-2005

  • Repair the leaky and/or defective faucets kitchen sink in the kitchen, 4th story at west

    Issued 27 Aug 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • ×2Provide an adequate supply of gas to the fixtures at stove in the kitchen, 4th story at west

    2 issued 26 Apr 2021 to 27 Aug 2021Violation closedAppliances§ 27-2070

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the 1st room from east at south, 4th story at west

    Issued 27 Aug 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway, 4th story at west

    Issued 27 Aug 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 4th story at west

    Issued 27 Aug 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color wall under sink in the kitchen, 4th story at west

    Issued 27 Aug 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective reglazed porcelain bathtub in the bathroom, 4th story

    Issued 9 May 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department walls and ceiling in the private hallway, 4th story at north

    Issued 9 May 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2013

  • Provide an adequate supply of gas to the fixtures gas range, 4th story at north

    Issued 9 May 2021Violation closed 15 Mar 2022Appliances§ 27-2070

  • Repair the broken or defective plastered surfaces and paint in a uniform color inside west closet in the 4th room from east, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective grout around bathtub in the bathroom, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department west wall in the bathroom, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2013

  • Remove all obstructions and repair all defects in wash basin in the bathroom, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022§ 27-2026

  • Properly repair the broken or defective door lock in the bathroom, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from east, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Properly repair the broken or defective sink base cabinet in the kitchen, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department south window stool in the 4th room from east, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Doors and windows§ 27-2013

  • ×2Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen, 4th story at west

    2 issued 5 Apr 2021 to 26 Apr 2021Violation closedWalls and ceilings§ 27-2005

  • Replace with new the broken or defective glass at lower sash at south window in the 4th room from east, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Remove all obstructions and repair all defects in bathtub in the bathroom, 4th story at west

    Issued 26 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the foyer, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Repair the leaky and/or defective faucets at sink in the kitchen, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Repair leaky water closet flush pipe connection at water closet in the bathroom, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective grout at surrounding walls of bathtub in the bathroom, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the 4th room from east, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Provide an adequate supply of gas to the fixtures at gas range in the kitchen, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Appliances§ 27-2070

  • Replace with new the broken or defective glass at lower window sash in the 4th room from east, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Abate the nuisance consisting of extension cord being run from refrigerator to north wall in the kitchen, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Appliances§ 27-2005 +1

  • Replace with new the broken or defective sinkbase cabinet in the kitchen, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022§ 27-2026

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 4th story at west

    Issued 5 Apr 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026

  • Replace with new the broken or defective cracked glass at upper sash window in the 1st room from north, 4th story at north

    Issued 19 Dec 2020Violation closed 15 Mar 2022Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north, 4th story at north

    Issued 19 Dec 2020Violation closed 15 Mar 2022Walls and ceilings§ 27-2005

  • Remove all obstructions and repair all defects in washbasin wasteline in the bathroom, 4th story at north

    Issued 19 Dec 2020Violation closed 15 Mar 2022§ 27-2026

  • Properly repair the broken or defective mailbox ( an apartment ) at public hall, 1st story

    Issued 5 Nov 2021Violation closed 8 Mar 2022Entry, buzzer and mail§ 27-2005

  • Properly repair the broken or defective mailbox lock for an apartment. at public hall, 1st story

    Issued 14 Oct 2021Violation closed 8 Mar 2022Entry, buzzer and mail§ 27-2005

  • Properly repair the broken or defective mailbox [ an apartment ] at public hall, 1st story

    Issued 11 Oct 2021Violation closed 8 Mar 2022Entry, buzzer and mail§ 27-2005

  • Properly repair the broken or defective mail box bank at east and west walls., 1st story

    Issued 23 May 2021Violation closed 8 Mar 2022Walls and ceilings§ 27-2005

  • Provide an adequate supply of gas to the fixtures gas range. in the kitchen, 4th story at north

    Issued 14 Oct 2021Violation closed 5 Mar 2022Appliances§ 27-2070

  • Provide an adequate supply of gas to the fixtures at range in the kitchen, 4th story at west

    Issued 5 Nov 2021Violation dismissed 23 Jan 2022Appliances§ 27-2070

  • Properly repair with similar material the broken or defective wood floor inside base cabinet at sink in the kitchen, 4th story at north

    Issued 11 Oct 2021Violation dismissed 23 Jan 2022Leaks and plumbing§ 27-2005

Showing the 100 most recent of 238.

334 violations on record in total, 91 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

275 complaints in three years, 17 of them in the last twelve months.

  • Leaks and plumbing2 / 76
  • Noise5 / 71
  • Doors and windows0 / 25
  • Heat and hot water5 / 21
  • Fire and safety equipment0 / 21
  • Floors and stairs1 / 21
  • Walls and ceilings0 / 18
  • Electrical0 / 12
  • Garbage and cleanliness1 / 3
  • Pests1 / 2
  • Mold and damp1 / 2
  • Super and management1 / 1
  • Paperwork and notices0 / 1
  • Other0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

4 cases, all closed.

  • Tenant Action/Harassment

    Opened 8 Mar 2013

  • Tenant Action/Harassment

    Opened 11 Sept 2012

  • Tenant Action

    Opened 16 Apr 2012

  • Tenant Action

    Opened 3 Feb 2012

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20252 evictions

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 5 earlier reports
  • 2024No infested units reported (2023 report)
  • 2024No infested units reported (2022 report)
  • 2022No infested units reported (2021 report)
  • 2021No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    SANTO PETRUSO

    Public records list SANTO PETRUSO as the registered managing agent for this address as of 12 Jul 2026. Source: HPD registration.

    Other buildings listed under this agent (3 in the records we hold)

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    25-70 REALTY LLC

    Public records list 25-70 REALTY LLC as the owner of record for this address as of 12 Jul 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 9 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 5 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. There was 1 mould complaint here in the last twelve months. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. There was 1 pest complaint here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4006520075 · Block 652, Lot 75 · Building class C1