ByTenantsByTenants home

29-08 31 Avenue, Astoria, NY 11106

Built 1927 · 5-story walk-up · 67 apartments

14 immediately hazardous violations open. 50 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
5014 · 23 · 13
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202271
202391
20244417
2025276
2026 so far3615

Plus 161 violations from 2000 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 49
  • Walls and ceilings 46
  • Leaks and plumbing 16
Open per apartment
0.7 (50 open across 67 apartments)
Inspector last found a problem
25 Oct 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 13 days, and inspectors issued 1 violation.

WinterDaysComplaintsViolations
2025–2613131

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous14 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Fire escape defective. properly secure gusset plate at east corner of top end return rail at 4 balcony at inner court yard at south wall at fire escape, 4th story, at fire escape

    Issued 26 Jul 2026Not complied with 26 Oct 2026Fire and safety equipment§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 1st story at west, section ''west'', at west

    Issued 14 Apr 2025Notice sent out 16 Apr 2025Lead paint§ 27-2056.7 +2

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from west at north wall in the 4th room from north, 1st story at west, section ''west'', at west

    Issued 13 Apr 2025Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at west wall, 1st door frame from north at east wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north at west, 1st story at west, section ''west'', at west

    Issued 13 Apr 2025Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the kitchen, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 2nd door from north at east wall, 1st door frame from north at east wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north at west, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st room from north at east, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from north at east wall in the foyer, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from west at north wall, 1st window frame from south at west wall in the 4th room from north, 1st story at west, section ''west''

    Issued 9 Jun 2024Violation will be reinspected 29 Oct 2026Lead paint§ 27-2056.6

Show all 14
  • Abate the infestation consisting of roaches in the entire apartment, 4th story at west

    Issued 18 Mar 2024Violation will be reinspected 29 Oct 2026Pests§ 27-2017.4

  • Provide hot water at all hot water fixtures in the entire apartment, 4th story

    Issued 18 Mar 2024Violation will be reinspected 29 Oct 2026Heat and hot water§ 27-2031

  • Abate the infestation consisting of roaches in the entrance, 4th story at west

    Issued 12 Mar 2024Violation will be reinspected 29 Oct 2026Pests§ 27-2017.4

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment, 4th story at west

    Issued 12 Mar 2024Violation will be reinspected 29 Oct 2026Fire and safety equipment§ 27-2043.1

Hazardous23 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 5th story at west, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Fire and safety equipment§ 27-2045 +2

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 4th story balconys, from 1 stack from east at south building front at fire escape

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 5th story at west, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Fire and safety equipment§ 27-2045 +3

  • Properly repair with similar material the broken or defective fire retardant material at ceiling, east and south wall at bulkhead at public hall, 5th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Walls and ceilings§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 5th story balconys, from 1 stack from east at south building front at fire escape

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair the source and abate the evidence of a water leak ceiling, east and south wall at bulkhead at public hall, 5th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Leaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective bell/buzzer intercom return and receive from building entrance in the entrance, 4th story at north

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Entry, buzzer and mail§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protuding beyond the window sill at east stack building front at fire escape, 4th story

    Issued 25 Sept 2026Not complied with 26 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair or replace the broken or defective bell / buzzer / intercom from building entrance, 4th story at east

    Issued 24 Sept 2026Not complied with 26 Oct 2026Entry, buzzer and mail§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 5th story balconys, from 1 stack from east at south buiding front at fire escape

    Issued 26 Jul 2026Not complied with 26 Oct 2026Fire and safety equipment§ 27-2005 +1

Show all 23
  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 4th story balconys, from 1 stack from east at south buiding front at fire escape

    Issued 26 Jul 2026Not complied with 26 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective fire retardant material at east and south wall, 5th story, section ''west''

    Issued 26 Jul 2026Not complied with 26 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at east and south walls at bulkhead at public hall, 5th story, section at west

    Issued 21 Nov 2025Not complied with 26 Oct 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from north, 4th story at east, section at east

    Issued 21 Jan 2025Violation will be reinspected 29 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling and east wall in the 1st room from north, 4th story at east, section at east

    Issued 21 Jan 2025Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2026

  • Trace and repair the source and abate the visible mold condition... less than 10 square feet at east and south wall in the bathroom, 5th story at north, section ''evennumber'', at south original violation 17128224 issued 18-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 17 Jul 2024Not complied with 26 Oct 2026Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north, 4th story at east, section at east

    Issued 5 Mar 2024Violation will be reinspected 29 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north, 4th story at east, section at east

    Issued 5 Mar 2024Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak ceiling in the bathroom, 4th story at east, section at east

    Issued 5 Mar 2024Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2026

  • Trace and repair the source and abate the visible mold condition... approximately 10 square feet at ceiling in the bathroom, 4th story at east, section at east

    Issued 5 Mar 2024Violation will be reinspected 29 Oct 2026Mold and damp§ 27-2017.3

  • Properly repair the source and abate the evidence of a water leak ceiling and east wall in the 1st room from north, 4th story at east

    Issued 11 Jan 2024Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and east wall in the 1st room from north, 4th story at east

    Issued 11 Jan 2024Violation will be reinspected 29 Oct 2026Walls and ceilings§ 27-2005

  • Abate the infestation consisting of bedbugs in the entire apartment, 4th story at north

    Issued 9 Dec 2023Violation will be reinspected 29 Oct 2026Pests§ 27-2017.4

Non-hazardous13 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Refit entrance door in the bathroom, 5th story at west, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer, 5th story, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from east, 5th story at south, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling, east and south wall at bulkhead at public hall, 5th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east, 5th story, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Walls and ceilings§ 27-2013

  • Trace and repair the source and abate the visible mold condition... less then 10 square feet observed at east wall in the bathroom, 5th story at west, section ''west''

    Issued 25 Oct 2026Notice of issuance sent to tenant 27 Oct 2026Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom, 5th story at west, section ''west''

    Issued 25 Oct 2026Notice sent out 27 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling, east and south wall at public hall stairs, 4th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department ceiling, east and south wall at public hall stairs, 4th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Floors and stairs§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at east and south wall at public hall stairs, 4th story, section ''west''

    Issued 25 Oct 2026Notice sent out 28 Oct 2026Floors and stairs§ 27-2005

Show all 13
  • Paint with light colored paint to the satisfaction of this department east and south wall, 5th story, section ''west''

    Issued 26 Jul 2026Not complied with 26 Oct 2026Walls and ceilings§ 27-2013

  • Refit entrance door in the bathroom, 5th story at west

    Issued 26 Jul 2026Not complied with 26 Oct 2026Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department east and south walls at bulkhead at public hall, 5th story, section at west

    Issued 21 Nov 2025Not complied with 26 Oct 2026Walls and ceilings§ 27-2013

274 closed violations, plus 4 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof story at public hall, 5th story, section at east

    Issued 2 Aug 2026Violation closed 29 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective bulkhead door hinges, 5th story, section ''east''

    Issued 26 Jul 2026Violation closed 29 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective bulkhead door latch, 5th story, section ''west''

    Issued 26 Jul 2026Violation closed 29 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door in the entrance, 4th story at east

    Issued 24 Sept 2026Violation closed 26 Oct 2026Fire and safety equipment§ 27-2005 +3

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood paneling at all walls in the 3rd room from east at north, 4th story at south

    Issued 26 Jul 2026Violation closed 26 Oct 2026Walls and ceilings§ 300

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 2, story balconys, from 1 stack from east at south buiding front at fire escape

    Issued 26 Jul 2026Violation closed 26 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 3rd story balconys, from 1 stack from east at south buiding front at fire escape

    Issued 26 Jul 2026Violation closed 26 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair or replace the broken or defective boiler room door latch at cellar

    Issued 26 Jul 2026Violation closed 26 Oct 2026Heat and hot water§ 27-2005

  • Remove the illegal double cylinder key operated locking device at door at apartment entrance in the entrance, 5th story at west

    Issued 26 Jul 2026Violation closed 26 Oct 2026Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective boiler room door latch at cellar

    Issued 26 Jul 2026Violation closed 26 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective bulkhead door latch, 5th story, section ''west''

    Issued 26 Jul 2026Violation closed 26 Oct 2026Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges at door to boiled room at cellar

    Issued 21 Nov 2025Violation closed 26 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at door to boiler room at cellar

    Issued 2 Mar 2026Violation closed 29 Jul 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective bell buzzer intercom system at east wall in the foyer, 4th story at east

    Issued 29 Jun 2026Violation closed 27 Jul 2026Entry, buzzer and mail§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story

    Issued 2 Mar 2026Violation closed 27 Jul 2026Walls and ceilings§ 27-2013

  • Fire escape defective. properly secure metal support bracket from bottom front rail to bottom return rail at 2nd story balcony on east stack at building front at fire escape

    Issued 2 Mar 2026Violation closed 27 Jul 2026Fire and safety equipment§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story

    Issued 9 Feb 2026Violation closed 27 Jul 2026Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story

    Issued 9 Feb 2026Violation closed 27 Jul 2026Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and all walls at 1st public hall bulkhead from east, 5th story, section at east

    Issued 2 Nov 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall 5th story intermediate landing at public hall, 5th story, section at east

    Issued 2 Nov 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at intermediate landing at public hall, 5th story, section at east

    Issued 2 Nov 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department north and east walls at public hall, 3rd story

    Issued 14 Oct 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak ceiling and south wall in the 1st room from east at south, 4th story at south, section at west

    Issued 12 Jan 2024Violation closed 27 Jul 2026Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from east at south, 4th story at south, section at west

    Issued 12 Jan 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 2nd story at west, section at east

    Issued 1 Jan 2024Violation closed 27 Jul 2026Walls and ceilings§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protruding beyond window sills,5th 4th and 3rd stry balconys, 3rd stack from east at north

    Issued 25 Jul 2022Violation closed 27 Jul 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protruding beyond window sills at 5th and 4th stry balconys, 1st stack from east at north

    Issued 25 Jul 2022Violation closed 27 Jul 2026Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective latch at stair bulkhead, 5th story, section at east

    Issued 2 Mar 2026Violation closed 9 Jul 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch at stair bulkhead, 5th story, section at west

    Issued 2 Mar 2026Violation closed 9 Jul 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Issued 2 Mar 2026Violation closed 19 Apr 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Issued 9 Feb 2026Violation closed 19 Apr 2026Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective hinges at 2nd fire door leading to court from east at public hall, 1st story

    Issued 16 Dec 2025Violation closed 23 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door and frame at door to laundry room at cellar

    Issued 22 Nov 2025Violation closed 23 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at east, section at east

    Issued 8 Oct 2025Violation closed 23 Mar 2026Pests§ 27-2017.4

  • ×2Abate the infestation consisting of roaches in the entire apartment, 5th story at south

    2 issued 14 Oct 2024 to 2 Nov 2024Violation closedPests§ 27-2017.4

  • Properly repair with similar material the broken or defective,recaulk around bathtub.. in the bathroom, 4th story at north

    Issued 5 May 2025Violation closed 12 Mar 2026Leaks and plumbing§ 27-2005

  • Cleanse to the satisfaction of this department the the ceramic tiles surface with grouted joints/ caulking of vestibule [ mold] at west wall in the bathroom, 4th story at north, section at east

    Issued 14 Apr 2025Violation closed 12 Mar 2026Mold and damp§ 27-2011

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer, the kitchen, 1st story at west, section ''west'', at west

    Issued 14 Apr 2025Violation closed 12 Mar 2026Walls and ceilings§ 27-2013

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustical ceiling tiles in the 2nd room from east at south, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 12 Mar 2026Walls and ceilings§ 300

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustical tile ceiling in the kitchen, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 12 Mar 2026Walls and ceilings§ 300

  • Replace or repair the self-closing doors that is missing or defective latch set at vestibule door leading to public hall, 1st story

    Issued 21 Jan 2026Violation closed 10 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at 2nd exit door from east at south leading to inner court at public hall, 1st story

    Issued 21 Jan 2026Violation closed 10 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective electromechanical lock set at building front entrance door, 1st story

    Issued 23 Jan 2026Violation dismissed 4 Mar 2026Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch set at vestibule door leading to public hall, 1st story

    Issued 21 Jan 2026Violation closed 4 Mar 2026Doors and windows§ 27-2005

  • Abate the nuisance consisting of consisting of lockable slide bolt at door in the entrance, 1st story at east, section at east

    Issued 15 Dec 2025Violation dismissed 4 Mar 2026Doors and windows§ 27-2005 +1

  • Provide hot water at all hot water fixtures in the entire apartment, 5th story at south, section at west

    Issued 22 Nov 2025Violation closed 4 Mar 2026Heat and hot water§ 27-2031

  • Properly repair the source and abate the evidence of a water leak east and south walls at bulkhead at public hall, 5th story, section at west

    Issued 22 Nov 2025Violation closed 4 Mar 2026Leaks and plumbing§ 27-2026

  • Fire escape defective. properly secure support bracket from top front rail to bottom front rail 2nd story balcony east stack building front at fire escape

    Issued 23 Apr 2025Violation dismissed 4 Mar 2026Fire and safety equipment§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond the window sill at east stack building front at fire escape, 3rd story

    Issued 19 Jan 2025Violation closed 4 Mar 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective marble treads, 5th and 6th marble stair tread from bottom up leading to 3rd story at public hall stairs, 2nd story, section ''east''

    Issued 10 Dec 2024Violation closed 4 Mar 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at north and east walls at public hall, 3rd story

    Issued 14 Oct 2024Violation closed 4 Mar 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 2nd story at west, section at east

    Issued 1 Jan 2024Violation closed 4 Mar 2026Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door, 1st story

    Issued 23 Jan 2026Violation closed 24 Feb 2026Fire and safety equipment§ 27-2005 +3

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 1st story at east, section at east

    Issued 8 Oct 2025Violation dismissed 1 Jan 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at east, section at east

    Issued 8 Oct 2025Violation dismissed 1 Jan 2026Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at west, section at east

    Issued 3 Jul 2025Violation dismissed 28 Sept 2025Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, the foyer, 1st story at west, section at east

    Issued 3 Jul 2025Violation dismissed 28 Sept 2025Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom, 1st story at west, section at east

    Issued 3 Jul 2025Violation dismissed 28 Sept 2025Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom, 1st story at west, section at east

    Issued 3 Jul 2025Violation dismissed 28 Sept 2025Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft east wall in the bathroom, 1st story at west, section at east

    Issued 3 Jul 2025Violation dismissed 28 Sept 2025Mold and damp§ 27-2017.3

  • Repair or replace the smoke detector improperly installed in the entire apartment, 5th story at east

    Issued 7 Apr 2025Violation dismissed 27 Jul 2025Fire and safety equipment§ 27-2045

  • Replace or repair the self-closing doors that is missing or defective door( rubs against saddle) in the entrance, 1st story at west, section at east

    Issued 3 Jul 2025Violation closed 19 Jul 2025Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective latch assembly on door in the entrance, 5th story at south

    Issued 7 Apr 2025Violation dismissed 6 Jul 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly on door in the entrance, 1st story at east, section at east

    Issued 7 Apr 2025Violation dismissed 2 Jul 2025Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective caulking south wall in the kitchen, 4th story at east, section at east

    Issued 22 Jan 2025Violation dismissed 26 May 2025Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges and latch in the entrance, 5th story at south

    Issued 7 Apr 2025Violation closed 26 Apr 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges and latch in the entrance, 1st story at east, section at east

    Issued 7 Apr 2025Violation closed 23 Apr 2025Fire and safety equipment§ 27-2005 +3

  • Repair the leaky and/or defective faucets at sink in the kitchen, 5th story at east

    Issued 25 May 2021Violation closed 14 Apr 2025Leaks and plumbing§ 27-2026

  • Properly repair the broken or defective ceiling light fixture in the kitchen, 5th story at east

    Issued 25 May 2021Violation closed 14 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective electrical light fixture at ceiling at public hall, 3rd story

    Issued 14 Oct 2024Violation closed 8 Apr 2025Electrical§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st story

    Issued 14 Oct 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department east wall at public hall, 1st story

    Issued 14 Oct 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom, 5th story at south

    Issued 14 Oct 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective inoperative bell, return buzzer and intercom sestem form building front entrance door in the entire apartment, 5th story at east, section ''evennumber'', at south

    Issued 18 Jul 2024Violation closed 8 Apr 2025Entry, buzzer and mail§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 5th story at east, section ''evennumber'', at south

    Issued 18 Jul 2024Violation closed 8 Apr 2025Fire and safety equipment§ 27-2005 +3

  • Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the 4th room from north, 1st story at west, section ''west''

    Issued 10 Jun 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the kitchen, 1st story at west, section ''west''

    Issued 10 Jun 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd private hallway, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the in the bathroom, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at in the bathroom, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 8 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east at south, 4th story at north, section ''east''

    Issued 14 May 2024Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective mortise lock at building entrance door, 1st story

    Issued 6 Mar 2024Violation closed 8 Apr 2025Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective apartment entrance door hinges in the entrance, 4th story at south, section at west

    Issued 12 Jan 2024Violation closed 8 Apr 2025Fire and safety equipment§ 27-2005 +3

  • Abate the nuisance consisting of key operated door knob installed at door leading to fire eacape window in the 1st room from east, 5th story at south

    Issued 1 May 2023Violation closed 8 Apr 2025Doors and windows§ 27-2005 +1

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustical drop ceiling in the 2nd room from east, 1st story at east, section ''east''

    Issued 25 Jul 2022Violation closed 8 Apr 2025Walls and ceilings§ 300

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 2nd stry balcony,west stack

    Issued 25 Jul 2022Violation closed 8 Apr 2025Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east, 1st story at east, section ''east''

    Issued 25 Jul 2022Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective porcelain anamel glazed at bathtub in the bathroom, 1st story at east

    Issued 17 May 2022Violation closed 8 Apr 2025Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east, 1st story at east

    Issued 17 May 2022Violation closed 8 Apr 2025Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from east, 5th story, section at east

    Issued 2 Nov 2024Violation closed 2 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 5th story at north, section ''evennumber'', at south

    Issued 18 Jul 2024Violation dismissed 19 Nov 2024Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 5th story at north, section ''evennumber'', at south

    Issued 18 Jul 2024Violation dismissed 19 Nov 2024Fire and safety equipment§ 27-2045

  • Trace and repair the source and abate the visible mold condition... less than 10 square feet at east and south wall in the bathroom, 5th story at north, section ''evennumber'', at south

    Issued 18 Jul 2024Violation closed 18 Nov 2024Mold and damp§ 27-2017.3

  • Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story

    Issued 2 Aug 2024Violation closed 17 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east, 4th story at west

    Issued 17 Jun 2024Violation dismissed 17 Oct 2024Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective due to defective hinges in the entrance, 4th story at west

    Issued 17 Jun 2024Violation closed 17 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Trace and repair the source and abate the visible mold condition... at ceiling and walls ( inside closet ) approx 35 sq.ft ) in the private hallway, 1st story at west, section at east

    Issued 19 Nov 2019Violation closed 17 Oct 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... at ceiling and walls ( inside closet ) ( approx 30 sq.ft ) in the 3rd room from east at south, 1st story at west, section at east

    Issued 19 Nov 2019Violation closed 17 Oct 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... at ceiling and all walls (32 square feet) in the 1st room from east, 1st story at east

    Issued 22 Oct 2019Violation closed 17 Oct 2024Mold and damp§ 27-2017.3

Showing the 100 most recent of 274.

328 violations on record in total, 50 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

103 complaints in three years, 31 of them in the last twelve months.

  • Heat and hot water14 / 22
  • Pests2 / 16
  • Leaks and plumbing4 / 16
  • Walls and ceilings1 / 13
  • Doors and windows5 / 7
  • Noise0 / 7
  • Mold and damp0 / 5
  • Appliances1 / 4
  • Entry, buzzer and mail2 / 4
  • Electrical0 / 3
  • Construction and illegal work0 / 2
  • Floors and stairs1 / 2
  • Garbage and cleanliness1 / 1
  • Fire and safety equipment0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

10 cases, all closed.

  • Heat and Hot Water

    Opened 2 May 2024

  • Tenant Action

    Opened 12 Apr 2024

  • Tenant Action

    Opened 4 Apr 2024

  • Tenant Action

    Opened 18 Jun 2020

  • False Certification Non-Lead

    Opened 4 Sept 2015

  • Tenant Action

    Opened 4 Dec 2012

  • Access Warrant - Non-Lead

    Opened 9 Jan 2009

  • Access Warrant - Non-Lead

    Opened 2 Jul 2008

  • Tenant Action

    Opened 10 Sept 2007

  • Heat and Hot Water

    Opened 1 Jun 2005

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20263 evictions
  • 20191 eviction
  • 20181 eviction

Filings

Public filing

Building permits

No permit currently in force. 2 permits filed in the last five years.

Show 2 expired or finished
  • General Construction

    MODIFICATION OF APT B7 AND B9 on 2ND FLOOR TO RESOLVE ECB VIOLATION#35378290J & 35378288K.

    Issued 2 Feb 2022Expired 1 Jun 2022

  • Equipment work

    Issued 25 Feb 2021Expired 22 Nov 2021

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 7 earlier reports
  • 2024No infested units reported (2023 report)
  • 2024No infested units reported (2022 report)
  • 2022No infested units reported (2021 report)
  • 2021No infested units reported (2020 report)
  • 2020No infested units reported (2019 report)
  • 20191 of 67 units reported infested (2018 report)
  • 20191 of 67 units reported infested (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    BRIAN GARLAND

    Public records list BRIAN GARLAND as the registered managing agent for this address as of 1 Oct 2025. Source: HPD registration.

    Other buildings listed under this agent (7 in the records we hold)

    Show 4 more

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    ASTORIA 31ST DRIVE INVESTOR, LLC

    Public records list ASTORIA 31ST DRIVE INVESTOR, LLC as the owner of record for this address as of 1 Oct 2025. Source: HPD registration.

    Other buildings listed under this owner (1 in the records we hold)

    No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 14 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 14 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. There are 3 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. There were 2 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4005880038 · Block 588, Lot 38 · Building class C1