ByTenantsByTenants home

33-14 29 Street, Astoria, NY 11106

Built 1935 · 4-story walk-up · 8 apartments

4 immediately hazardous violations open. 33 open in all.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
334 · 20 · 9
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202300
2024123
2025246
2026 so far00

Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 13
  • Lead paint 10
  • Fire and safety equipment 10
Open per apartment
4.1 (33 open across 8 apartments)
Inspector last found a problem
8 Sept 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

This building is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous4 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at north

    Issued 8 Jun 2025Notice sent out 9 Jun 2025Lead paint§ 27-2056.7 +2

  • Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at west

    Issued 21 Jun 2024Notice of issuance sent to tenant 23 Jun 2024Pests§ 27-2017.4

Hazardous20 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • ×2Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east, 2nd story at west

    2 issued 21 Jun 2024 to 8 Sept 2025Notice sent outLeaks and plumbing§ 27-2026

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 2nd story at west

    Issued 8 Sept 2025Notice sent out 9 Sept 2025Fire and safety equipment§ 27-2045 +3

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 2nd story at west

    Issued 8 Sept 2025Notice sent out 9 Sept 2025Fire and safety equipment§ 27-2045 +2

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 2nd story at west

    Issued 8 Sept 2025Notice sent out 9 Sept 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 2nd story at west

    Issued 8 Sept 2025Notice sent out 9 Sept 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east, 2nd story at west

    Issued 8 Sept 2025Notice sent out 9 Sept 2025Walls and ceilings§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Fire and safety equipment§ 27-2046.1

  • Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north at east, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Leaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective door lock in the bathroom, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Doors and windows§ 27-2005

  • Properly secure the loose wash basin cabinet in the bathroom, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Walls and ceilings§ 27-2005

Show all 20
  • Properly repair with similar material the broken or defective fire retarded material at the west and east walls at public hall, 1st story

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Fire and safety equipment§ 27-2045

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Walls and ceilings§ 27-2005

  • Remove all obstructions and repair all defects in waste line at wash basin in the bathroom, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant meterial all walls and ceiling at public hall, 1st story

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective mailbox forn apartment number 4 at public hall, 1st story

    Issued 21 Jun 2024Notice sent out 25 Jun 2024Entry, buzzer and mail§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and criling in the 2nd room from east, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Walls and ceilings§ 27-2005

Non-hazardous9 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department, north wall, ceiling, 1st door from north at east wall in the bathroom, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department, west wall in the kitchen, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Walls and ceilings§ 27-2013

  • And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at front of building at fire escape

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Fire and safety equipment§ 27-2014

  • Paint with light colored paint to the satisfaction of this department, ceiling in the 2nd room from north at east, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the east and west walls at public hall, 1st story

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department, 1st closet from south at west wall door, 1st door from east at south wall in the 1st room from north at west, 2nd story at north

    Issued 8 Jun 2025Notice sent out 8 Jun 2025Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall stairs, 2nd story

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Floors and stairs§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all walls and criling in the 3rd room from east at south, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen, 2nd story at west

    Issued 21 Jun 2024Notice sent out 23 Jun 2024Walls and ceilings§ 27-2013

Paperwork and notices6 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • ×6File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    6 issued 14 Apr 2021 to 6 May 2026Notice sent outPaperwork and notices

12 closed violations, plus 12 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective door frame at building entrance, 1st story

    Issued 12 May 2025Violation closed 11 Nov 2025Fire and safety equipment§ 27-2005 +3

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from east at south wall in the kitchen, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st window frame from west at north wall in the 1st room from north at west, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, ceiling, north wall, south wall, east wall in the kitchen, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from east at south wall, 1st door frame from east at south wall, east wall, west wall in the foyer, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 2nd room from north at east, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall, 1st window frame from west at north wall in the 1st room from north at east, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 1st room from north at east, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, east wall, west wall, 1st window frame from south at west wall in the bathroom, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, ceiling, 1st door frame from east at south wall, north wall, south wall, east wall, west wall in the 1st room from north at west, 2nd story at north

    Issued 8 Jun 2025Violation closed 15 Sept 2025Lead paint§ 27-2056.6

  • Properly secure the loose 2nd 3rd trerad from bottom up from intermiate landing at public hall stairs, 1st story

    Issued 21 Jun 2024Violation closed 22 Jan 2025Floors and stairs§ 27-2005

  • Properly secure the loose hand rail at north and south walls at public hall, 1st story

    Issued 21 Jun 2024Violation closed 22 Jan 2025Walls and ceilings§ 27-2005

63 violations on record in total, 39 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

29 complaints in three years, 0 of them in the last twelve months.

  • Walls and ceilings0 / 11
  • Mold and damp0 / 5
  • Doors and windows0 / 3
  • Floors and stairs0 / 3
  • Leaks and plumbing0 / 2
  • Entry, buzzer and mail0 / 2
  • Garbage and cleanliness0 / 2
  • Pests0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20261 eviction

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

No bedbug report on file for this building. That usually means the owner did not file one, not that there is nothing to report.

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record

    NATALIE CZWIL

    Public records list NATALIE CZWIL as the owner of record for this address as of 11 May 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 4 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. This building dates from 1935 and has 1 open lead-paint violation on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  3. Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 0 complaints in the last twelve months.
  4. 6 open violations for not filing something the city requires, usually the annual registration or the annual bedbug report. Nothing anyone lives in, but it is the record's plainest measure of whether this owner follows through. No bedbug report has ever been filed here, so the record cannot tell you the building's history — ask.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4005820006 · Block 582, Lot 6 · Building class C1