Open violations
22
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202310
2024121
2025171
2026 so far00

Plus 24 violations from 1999 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 10
  • Leaks and plumbing 8
  • Fire and safety equipment 8
Open per apartment
less than 0.1 (2 open across 726 apartments)
Inspector last found a problem
21 May 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 11 days.

WinterDaysComplaintsViolations
2025–2611120

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

This building is not on the state's list of buildings with rent-stabilized apartments for 2024. That is not proof none are: an owner who did not register is missing from the list too.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Hazardous2 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east, 13th story at north

    Issued 10 May 2025Not complied with 16 Jan 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from north at west, 13th story at west

    Issued 7 May 2025Not complied with 16 Jan 2026Walls and ceilings§ 27-2005

54 closed violations, plus 66 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 3rd room from east, 13th story at north

    Issued 10 May 2025Violation closed 16 Jan 2026Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchen, 13th story at north

    Issued 10 May 2025Violation closed 16 Jan 2026Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen, 13th story at north

    Issued 10 May 2025Violation closed 16 Jan 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen, 13th story at west

    Issued 7 May 2025Violation closed 16 Jan 2026Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective counter balances at west wall window lower sash in the kitchen, 13th story at west

    Issued 7 May 2025Violation closed 16 Jan 2026Doors and windows§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling and north wall in the 3rd room from north at west, 13th story at west

    Issued 7 May 2025Violation closed 16 Jan 2026Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak ceiling and south wall in the kitchen, 13th story at west

    Issued 7 May 2025Violation closed 16 Jan 2026Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective wood based cabinet at south wall in the kitchen, 13th story at west

    Issued 7 May 2025Violation closed 16 Jan 2026Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the kitchen, 13th story at north

    Issued 10 May 2025Violation dismissed 23 Oct 2025Mold and damp§ 27-2017.3

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north, 13th story at north

    Issued 21 May 2025Violation dismissed 21 Sept 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen, 13th story at north

    Issued 21 May 2025Violation dismissed 21 Sept 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east at north, 13th story at north

    Issued 21 May 2025Violation dismissed 21 Sept 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen, 13th story at west

    Issued 12 May 2025Violation dismissed 10 Sept 2025Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from north at west, 13th story at west

    Issued 12 May 2025Violation dismissed 10 Sept 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from north at west, 13th story at west

    Issued 12 May 2025Violation dismissed 10 Sept 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen, 13th story at west

    Issued 12 May 2025Violation dismissed 10 Sept 2025Walls and ceilings§ 27-2005

  • Remove or cover in a manner approved by the department the peeling lead paint over southwest room ceiling at 11 sty southwest an apartment mr robles 718 274 4755 julian 19 months., section '' ''

    Issued 12 Sept 1999Violation closed 11 Aug 2025Lead paint§ 27-2013

  • Remove or cover in a manner approved by the department the peeling lead paint over foyer ceiling at 11 sty southwest an apartment er1., section '' ''

    Issued 12 Sept 1999Violation closed 11 Aug 2025Lead paint§ 27-2013

  • Remove or cover in a manner approved by the department the peeling lead paint over east wall of bathroom at 11 sty southwest an apartment er1., section '' ''

    Issued 12 Sept 1999Violation closed 11 Aug 2025Lead paint§ 27-2013

  • Remove or cover in a manner approved by the department the peeling lead paint over ceiling and east wall southeast room at 11 sty southwest an apartment er1., section '' ''

    Issued 12 Sept 1999Violation closed 11 Aug 2025Lead paint§ 27-2013

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at north

    Issued 3 Mar 2024Violation closed 8 May 2025Pests§ 27-2017.4

  • Trace and repair the source and abate the visible mold condition... approx 4 sq.ft ceiling in the 1st room from east, 1st story at north original violation 16717622 issued 03-mar-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 3 Mar 2024Violation closed 8 May 2025Mold and damp§ 27-2017.3

  • Abate the nuisance consisting of roaches, 14th story at west

    Issued 20 Nov 2017Violation closed 29 Apr 2025Pests§ 27-2018

  • Repair or replace the carbon monoxide detecting device(s). missing, 14th story at west

    Issued 20 Nov 2017Violation closed 29 Apr 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective, 14th story at west

    Issued 20 Nov 2017Violation closed 29 Apr 2025Fire and safety equipment§ 27-2045

  • Remove device preventing door from being self-closing consisting of string at door at laundry room, 1st story

    Issued 9 Feb 2024Violation closed 22 Apr 2025Fire and safety equipment§ 27-2005 +1

  • Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Issued 20 Nov 2017Violation closed 22 Apr 2025Super and management§ 27-2053

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom, 2nd story

    Issued 17 Mar 2003Violation closed 22 Apr 2025Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of concealed water leak ceiling in the bathroom, 2nd story

    Issued 17 Mar 2003Violation closed 22 Apr 2025Leaks and plumbing§ 27-2005 +1

  • Properly repair the broken or defective mechanical ceiling vent in the bathroom, 2nd story

    Issued 17 Mar 2003Violation closed 22 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east, 1st story at north

    Issued 3 Mar 2024Violation closed 21 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east, 1st story at north

    Issued 3 Mar 2024Violation closed 21 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 1st story at north

    Issued 3 Mar 2024Violation closed 21 Apr 2025Floors and stairs§ 27-2005

  • Provide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this department at public hall, 1st story

    Issued 9 Feb 2024Violation closed 21 Apr 2025Fire and safety equipment§ 27-2050

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st private hallway, 2nd story at east

    Issued 16 Jan 2019Violation closed 21 Apr 2025Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom, 11th story at west

    Issued 6 Feb 2017Violation closed 21 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 11th story at west

    Issued 6 Feb 2017Violation closed 21 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north, 11th story at west

    Issued 6 Feb 2017Violation closed 21 Apr 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east, 11th story at south

    Issued 5 Mar 2016Violation closed 21 Apr 2025Walls and ceilings§ 27-2005

  • Repair or replace the smoke detector defective in the entire apartment, 11th story at north

    Issued 12 Feb 2009Violation closed 21 Apr 2025Fire and safety equipment§ 27-2045

  • Trace and repair the source and abate the visible mold condition... approx 4 sq.ft ceiling in the 1st room from east, 1st story at north

    Issued 3 Mar 2024Violation closed 1 Jul 2024Mold and damp§ 27-2017.3

  • Remove device preventing door from being self-closing hook and eye installed at building entrance door at public hall, 1st story

    Issued 9 Feb 2024Violation closed 12 Jun 2024Fire and safety equipment§ 27-2005 +1

  • Remove device preventing door from being self-closing hook and eye installed at vestibule door at public hall, 1st story

    Issued 9 Feb 2024Violation closed 12 Jun 2024Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges at laundry room, 1st story

    Issued 9 Feb 2024Violation closed 12 Jun 2024Fire and safety equipment§ 27-2005 +3

  • Remove device preventing door from being self-closing consisting of hook and eye at vestibule door at public hall, 1st story

    Issued 8 Feb 2024Violation closed 15 May 2024Fire and safety equipment§ 27-2005 +1

  • Remove device preventing door from being self-closing consisting of hook and eye at building front entrancedoor at public hall, 1st story

    Issued 8 Feb 2024Violation closed 15 May 2024Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective at fire door stair ''a'' at public hall, 1st story

    Issued 24 May 2023Violation closed 2 Jul 2023Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective concrete treads, 3rd, 4th, 8th, 10th and 11th from bottom, 14th story to bulkhead at public hall stairs, section ''stair ''b''''

    Issued 17 Dec 2019Violation closed 30 Jan 2020Floors and stairs§ 27-2005

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 2nd story at south

    Issued 13 Feb 2019Violation closed 5 May 2019Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7; wg to replace = 0; wg to repair = 0; in the entire apartment, 2nd story

    Issued 7 Jan 2019Violation closed 14 Mar 2019Fire and safety equipment§ 27-2043.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0;, 2nd story at east

    Issued 16 Jan 2019Violation closed 24 Feb 2019Fire and safety equipment§ 27-2043.1

  • Properly repair the broken or defective ventilation / exhaust system at ''d'' and ''c'' line in the bathroom, 11th story at north

    Issued 13 Aug 2018Violation closed 7 Jan 2019§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 3rd story at east

    Issued 14 Aug 2012Violation dismissed 8 Nov 2012Fire and safety equipment§ 27-2045

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 3rd story at east

    Issued 14 Aug 2012Violation dismissed 8 Nov 2012Fire and safety equipment§ 27-2046.1

122 violations on record in total, 2 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

69 complaints in three years, 18 of them in the last twelve months.

  • Heat and hot water11 / 19
  • Noise3 / 13
  • Leaks and plumbing0 / 7
  • Walls and ceilings0 / 6
  • Mold and damp0 / 6
  • Construction and illegal work1 / 5
  • Lead paint0 / 3
  • Other1 / 2
  • Doors and windows0 / 2
  • Garbage and cleanliness1 / 2
  • Floors and stairs0 / 1
  • Pests0 / 1
  • Fire and safety equipment1 / 1
  • Elevator0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

No HPD Housing Court cases on record for this building.

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20261 eviction
  • 20251 eviction
  • 20241 eviction
  • 20191 eviction
  • 20182 evictions
  • 20172 evictions

Filings

Public filing

Building permits

2 permits currently in force.

  • General Construction

    Bulkhead cladding as per plans filed herewith. No change to use, egress, or occupancy.

    Issued 16 Jan 2026Expires 31 Dec 2026

  • General Construction

    Bulkhead cladding as per plans filed herewith. No change to use, egress, or occupancy.

    Issued 14 Jan 2026Expires 31 Dec 2026

Show 78 expired or finished
  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops with inspection and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • General Construction

    Bulkhead cladding as per plans filed herewith. No change to use, egress, or occupancy.

    Issued 17 Jun 2025Expired 17 Jun 2026

  • General Construction

    Bulkhead cladding as per plans filed herewith. No change to use, egress, or occupancy.

    Issued 17 Jun 2025Expired 17 Jun 2026

  • General Construction

    Bulkhead cladding as per plans filed herewith. No change to use, egress, or occupancy.

    Issued 17 Jun 2025Expired 17 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 17 Jun 2025Expired 14 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 13 Jun 2025Expired 12 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 12 Jun 2025Expired 11 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 12 Jun 2025Expired 11 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 12 Jun 2025Expired 11 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops and outrigger detail

    Issued 12 Jun 2025Expired 11 Jun 2026

  • Suspended Scaffold

    Installation of material hoist. Amend #1, added scaffold drops inspection and outrigger detail

    Issued 12 Jun 2025Expired 11 Jun 2026

  • General Construction

    ROOF REPLACEMENT, FACADE RESTPRATOPM AS PER FISP CYCLE 9. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 7 Aug 2024Expired 12 Mar 2025

  • General Construction

    ROOF REPLACEMENT, FACADE RESTORATION PER FISP-CYCLE 9. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 7 Aug 2024Expired 12 Mar 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 5 Jul 2024Expired 12 Mar 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 2 Jul 2024Expired 12 Mar 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 26 Jun 2024Expired 12 Mar 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 25 Jun 2024Expired 12 Mar 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 25 Jun 2024Expired 12 Mar 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 25 Jun 2024Expired 12 Mar 2025

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, CAULKING REPLACEMENT, SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 6 Jun 2024Expired 12 Mar 2025

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWWALK SHED DOBNOW APP - Q00809059-I1-SH

    Issued 10 May 2024Expired 13 Mar 2025

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, CAULKING REPLACEMENT, SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 6 May 2024Expired 13 Mar 2025

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, CAULKING REPLACEMENT, SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

    Issued 2 May 2024Expired 13 Mar 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 27 Feb 2024Expired 27 Feb 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 20 Feb 2024Expired 20 Feb 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 20 Feb 2024Expired 20 Feb 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 16 Feb 2024Expired 16 Feb 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 15 Feb 2024Expired 15 Feb 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 15 Feb 2024Expired 15 Feb 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 15 Feb 2024Expired 15 Feb 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 15 Feb 2024Expired 15 Feb 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 14 Feb 2024Expired 14 Feb 2025

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 5 Feb 2024Expired 5 Feb 2025

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 30 Jan 2024Expired 30 Jan 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 12 Jan 2024Expired 12 Jan 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 12 Jan 2024Expired 12 Jan 2025

  • Suspended Scaffold

    FACADE RESTORATION, INSPECTIONS

    Issued 12 Jan 2024Expired 12 Jan 2025

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 22 Sept 2023Expired 22 Sept 2024

  • Plumbing

    WATER PUMP REPLACEMENT WORK ON THE FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

    Issued 12 Sept 2023Expired 2 May 2024

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 6 Sept 2023Expired 6 Sept 2024

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 21 Aug 2023Expired 12 Mar 2024

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jul 2023Expired 12 Mar 2024

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jul 2023Expired 20 Jul 2024

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jul 2023Expired 20 Jul 2024

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 19 Jul 2023Expired 19 Jul 2024

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 19 Jul 2023Expired 19 Jul 2024

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 19 Jul 2023Expired 12 Mar 2024

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK REPOINTING, CAULKING AND WINDOW SILL REPLACEMENT. ROOF AND ROOF RAILING REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 17 Apr 2023Expired 13 Mar 2024

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK REPOINTING, CAULKING AND WINDOW SILL REPLACEMENT. ROOF AND ROOF RAILING REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 14 Apr 2023Expired 13 Mar 2024

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jan 2023Expired 20 Jan 2024

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jan 2023Expired 20 Jan 2024

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jan 2023Expired 20 Jan 2024

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 20 Jan 2023Expired 20 Jan 2024

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 5 Oct 2022Expired 31 May 2023

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 27 Sept 2022Expired 17 Jun 2023

  • General Construction

    FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK RE-POINTING, WINDOW SILL REPLACEMENT, ROOF REPLACEMENT AND ROOF RAILING REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

    Issued 27 Sept 2022Expired 27 Sept 2023

  • General Construction

    INTERIOR DEMOLITION AND CONSTRUCTION WORK ON THE FIRST FLOOR TO INCLUDE THE INSTALLATION CONCRETE PLATFORM IN CONJUNCTION WITH WATER PUMP REPLACEMENT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

    Issued 8 Aug 2022Expired 8 Aug 2023

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 4 Aug 2023

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 17 Jun 2023

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 4 Aug 2023

  • Construction Fence

    INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 4 Aug 2023

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 17 Jun 2023

  • Sidewalk Shed

    PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

    Issued 4 Aug 2022Expired 4 Aug 2023

  • Alteration

    Issued 8 Jul 2021Expired 8 Jul 2022

  • Alteration

    Issued 14 Apr 2021Expired 14 Apr 2022

  • Alteration

    Issued 6 Apr 2021Expired 6 Apr 2022

  • Alteration

    Issued 6 Apr 2021Expired 6 Apr 2022

  • Alteration

    Issued 6 Apr 2021Expired 6 Apr 2022

  • Alteration

    Issued 8 Mar 2021Expired 8 Mar 2022

  • Alteration

    Issued 8 Mar 2021Expired 8 Mar 2022

  • Alteration

    Issued 8 Mar 2021Expired 8 Mar 2022

  • Alteration

    Issued 8 Mar 2021Expired 8 Mar 2022

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2026No infested units reported (2024 report)
Show 11 earlier reports
  • 2026No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)
  • 2025No infested units reported (2024 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    METRO MANAGEMENT DEVELOPMENT

    Public records list METRO MANAGEMENT DEVELOPMENT as the registered managing agent for this address as of 22 Sept 2026. Source: HPD registration.

    Other buildings listed under this agent (2 in the records we hold)

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    QUEENSVIEW, INC

    Public records list QUEENSVIEW, INC as the owner of record for this address as of 22 Sept 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city has 2 open hazardous violations on this building. Ask which apartments they concern and what has been done since.
  2. There were 11 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. The city recorded 3 mould violations here, most recently in 2025, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4005570003 · Block 557, Lot 3 · Building class D4