ByTenantsByTenants home

28-20 36 Avenue, Astoria, NY 11106

Built 1929 · 6-story elevator building · 72 apartments

29 immediately hazardous violations open. 128 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
12829 · 85 · 14
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202276
202360
202411816
202500
2026 so far4310

Plus 114 violations from 2004 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 42
  • Fire and safety equipment 40
  • Leaks and plumbing 27
Open per apartment
1.8 (128 open across 72 apartments)
Inspector last found a problem
13 Oct 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 5 days.

WinterDaysComplaintsViolations
2025–26560

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous29 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Remove the illegal fastening lock at west 1 door to west yard at public hall, 1st story

    Issued 13 Oct 2026Notice sent out 15 Oct 2026Roof and outside the building§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective latch set in the entrance, 5th story at east

    Issued 13 Oct 2026Notice sent out 14 Oct 2026Fire and safety equipment§ 27-2005 +3

  • Abate the infestation consisting of roaches in the entire apartment, 5th story at east

    Issued 13 Oct 2026Notice of issuance sent to tenant 14 Oct 2026Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 5th story at east

    Issued 13 Oct 2026Notice of issuance sent to tenant 14 Oct 2026Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at east

    Issued 18 Aug 2026Notice of issuance sent to tenant 19 Aug 2026Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 1st story at east

    Issued 18 Aug 2026Notice of issuance sent to tenant 19 Aug 2026Pests§ 27-2017.4

  • Properly repair with similar material the broken or defective fire retardant material at ceiling bulkhead to roof, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Roof and outside the building§ 27-2005

  • Abate the infestation consisting of mice in the entire apartment, 1st story at west, section at north

    Issued 16 Nov 2024Notice of issuance sent to tenant 21 Nov 2024Pests§ 27-2017.4

  • Remove the illegal fastening key operated lock at interior of fire door leading to west yard at public hall, 1st story

    Issued 19 Oct 2024Notice sent out 28 Oct 2024Roof and outside the building§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges on hopper door inside compactor closet at public hall, 1st story, section ''north''

    Issued 1 Oct 2024Notice sent out 1 Oct 2024Fire and safety equipment§ 27-2005 +3

Show all 29
  • Replace or repair the self-closing doors that is missing or defective hinges on hopper door inside compactor closet at public hall, 4th story, section ''south''

    Issued 1 Oct 2024Notice sent out 1 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges on hopper door inside compactor closet at public hall, 1st story, section ''south''

    Issued 1 Oct 2024Notice sent out 1 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges and latch on compactor closet door at public hall, 4th story, section ''south''

    Issued 1 Oct 2024Notice sent out 1 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective compactor closet door frame at south at public hall, 1st story

    Issued 18 Sept 2024Notice sent out 19 Sept 2024Fire and safety equipment§ 27-2005 +3

  • Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling in the bathroom, 6th story at west original violation 17243094 issued 03-sep-24 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).

    Issued 3 Sept 2024Notice of issuance sent to tenant 1 Dec 2024Mold and damp§ 27-2017.3

  • Abate the infestation consisting of roaches in the entire apartment, 6th story at west

    Issued 3 Sept 2024Not complied with 30 Nov 2024Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 6th story at east, section at south

    Issued 23 Jul 2024Notice of issuance sent to tenant 24 Jul 2024Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at north, section at north

    Issued 23 Jul 2024Notice of issuance sent to tenant 24 Jul 2024Pests§ 27-2017.4

  • Properly repair or replace the broken or defective lower spring counterbalance in the kitchen, 6th story at east, section ''south''

    Issued 13 Jan 2024Invalid certification 27 Jan 2024§ 27-2005

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 1st story at east

    Issued 20 Apr 2022Notice sent out 24 Apr 2022Lead paint§ 27-2056.7 +2

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer, 1st story at east

    Issued 20 Apr 2022Certification postponment denied 15 May 2022Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the foyer, 1st story at east, section ''east''

    Issued 19 Jul 2018Certification postponment denied 17 Sept 2018Lead paint§ 27-2056.6

  • Remove the illegal fastening double cylinder key operated lock at door, west wall, at public hall, 1st story

    Issued 19 Jul 2018Notice certified late 5 Aug 2018Doors and windows§ 27-2005 +1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the foyer, 6th story at south

    Issued 21 May 2014Notice sent out 27 May 2014Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st riser from south at west wall in the bathroom, 6th story at south

    Issued 21 May 2014Notice sent out 27 May 2014Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east at south, 2nd story at west, section at south

    Issued 24 Jun 2013Notice sent out 4 Jul 2013Lead paint§ 27-2056.6

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 2;, 5th story at north, section at east

    Issued 17 Apr 2013First no access to re- inspect violation 25 Jun 2013Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st radiator from south at west wall in the 1st room from north at east, 5th story at north, section at east

    Issued 17 Apr 2013Violation will be reinspected 16 Jun 2013Lead paint§ 27-2056.6

Hazardous85 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair with similar material the broken or defective porcelain enamel finish by method of regazing at bathtub in the bathroom, 5th story at east

    Issued 13 Oct 2026Notice sent out 14 Oct 2026Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Walls and ceilings§ 27-2005

  • Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate.. in the entire apartment, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches out of the window at 3rd stack from south at east wall building front at fire escape, 5th story

    Issued 17 Aug 2026Notice certified on time 28 Sept 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches out of the window at 2nd stack from south at east wall building front at fire escape, 3rd story

    Issued 17 Aug 2026Notice certified on time 28 Sept 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of buckets at 3rd stack from south at east wall building front at fire escape, 2nd story

    Issued 17 Aug 2026Notice certified on time 28 Sept 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd stack from south at east wall building front at fire escape, 2nd story

    Issued 17 Aug 2026Notice certified on time 28 Sept 2026Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 4th room from north at west, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective intercom system from building entrance door to return buzzer at east wall in the private hallway, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Entry, buzzer and mail§ 27-2005

Show all 85
  • Properly repair with similar material the broken or defective porcelain enamel glaze insde the bathtub in the bathroom, 1st story at east

    Issued 17 Aug 2026Violation will be reinspected 29 Oct 2026Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective electrical outlet fixtures at west wall in the private hallway, 5th story at east, section ''g-m'', at north

    Issued 1 Jul 2026Civ14 mailed 20 Aug 2026Electrical§ 27-2005

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 5th story at east, section ''g-m'', at north

    Issued 1 Jul 2026Civ14 mailed 20 Aug 2026Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective window frame at 1st window from west at north wall in the 2nd room from east at north, 5th story at east, section ''g-m'', at north

    Issued 1 Jul 2026Civ14 mailed 20 Aug 2026Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east, 3rd story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 1st room from east, 3rd story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective porcelain enamel glaze the bathtub in the bathroom, 3rd story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallway, 3rd story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom, 4th story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak east wall in the bathroom, 4th story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective porcelain enamel glaze the bathtub in the bathroom, 4th story at north

    Issued 17 Dec 2024Notice sent out 17 Dec 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective porcelain enamel glaze bathtub in the bathroom, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color window reveal in the bathroom, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Floors and stairs§ 27-2005

  • Properly repair the source and abate the evidence of a water leak west wall in the kitchen, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from east, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color north and east wall in the 4th room from east, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the foyer, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Notice sent out 17 Dec 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at east wall at bulkhead to roof, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Roof and outside the building§ 27-2005

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Garbage and cleanliness§ 27-2010

  • Properly repair with similar material the broken or defective porcelian enamel glaze at bathtub in the bathroom, 3rd story at north, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective wood subfloor in the bathroom, 3rd story at north, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tile in the bathroom, 3rd story at north, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tile in the kitchenette, 3rd story at north, section at north

    Issued 30 Nov 2024Notice sent out 1 Dec 2024Floors and stairs§ 27-2005

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Notice sent out 19 Nov 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Notice sent out 19 Nov 2024Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from east, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Notice sent out 19 Nov 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroom, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Notice sent out 19 Nov 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at south, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective saddle in the entrance, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024§ 27-2005

  • Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at north, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen, 3rd story at north

    Issued 19 Oct 2024Notice sent out 28 Oct 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchen, 3rd story at north

    Issued 19 Oct 2024Notice sent out 28 Oct 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north, section ''north''

    Issued 16 Sept 2024Not complied with 18 Nov 2024Floors and stairs§ 27-2005

  • Properly secure the loose wood saddle in the bathroom, 3rd story at north, section ''north''

    Issued 16 Sept 2024Not complied with 18 Nov 2024§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom, 3rd story at north, section ''north''

    Issued 16 Sept 2024Not complied with 18 Nov 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway, 3rd story at north, section ''north''

    Issued 16 Sept 2024Not complied with 18 Nov 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and west walls in the kitchen, 3rd story at north, section ''north''

    Issued 16 Sept 2024Not complied with 18 Nov 2024Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft at door in the kitchen, 6th story at west original violation 17243091 issued 03-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 3 Sept 2024First no access to re- inspect violation 23 Jun 2025Mold and damp§ 27-2017.3

  • Properly repair with similar material the broken or defective wood floor in the 1st room from east at north, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from east at north, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak ceiling and all walls in the bathroom, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north, section at north

    Issued 23 Jul 2024Not complied with 20 Oct 2024Floors and stairs§ 27-2005

  • Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall and at east wall in the bathroom, 1st story at west original violation 17099042 issued 05-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Issued 5 Jul 2024Defect letter issued 23 Jun 2025Mold and damp§ 27-2017.3

  • Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at east wall in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 1st room from north at east, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Floors and stairs§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at west wall in the kitchen, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... approx 10 sq feet at north wall in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Defect letter issued 16 Sept 2024Mold and damp§ 27-2017.3

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Notice sent out 16 Jun 2024Floors and stairs§ 27-2005

  • Trace and repair the source and abate the visible mold condition... approx 10 sq feet at ceiling in the bathroom, 3rd story at north, section at north

    Issued 16 Jun 2024Defect letter issued 16 Sept 2024Mold and damp§ 27-2017.3

  • Replace with new the broken or defective wood saddle at the door in the bathroom, 3rd story at north

    Issued 21 Aug 2018Not complied with 9 Oct 2018Doors and windows§ 27-2005

  • Replace with new the broken or defective ceramic-tiles at floor in the kitchen, 3rd story at north

    Issued 21 Aug 2018Not complied with 9 Oct 2018Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color north wall behind the radiator in the 1st room from east, 3rd story at north

    Issued 21 Aug 2018Not complied with 9 Oct 2018Heat and hot water§ 27-2005

  • Repair the leaky and/or defective water supply pipe at watercloset in the bathroom, 3rd story at north

    Issued 21 Aug 2018Not complied with 9 Oct 2018Leaks and plumbing§ 27-2026

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 5th sty. north balcony at fire escape

    Issued 21 Aug 2018Not complied with 9 Oct 2018Fire and safety equipment§ 27-2005 +1

  • Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Fire and safety equipment§ 27-2046.1

  • Remove the illegal fastening key operated lock at door to room with window for egress in the 3rd room from east, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective wood floor in the foyer, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 3rd room from east, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Floors and stairs§ 27-2005

  • Replace with new the missing door saddle in the bathroom, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Doors and windows§ 27-2005

  • Repair or replace the smoke detector inoperative in the entire apartment, 1st story at east, section ''east''

    Issued 19 Jul 2018False certification 1 Sept 2018Fire and safety equipment§ 27-2045

  • Arrange and make self-closing the doors compactor closets at public hall

    Issued 1 Jun 2015Invalid certification 21 Jul 2015Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 6th story at east, section at north

    Issued 18 Apr 2015Invalid certification 4 Jun 2015Walls and ceilings§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes garbage bags stored under drop ladder north stack west yard

    Issued 24 Jun 2013Not complied with 2 Sept 2013Fire and safety equipment§ 27-2005 +1

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard

    Issued 29 Apr 2010Not complied with 24 Jun 2013Garbage and cleanliness§ 27-2010

Non-hazardous14 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft. observed at ceiling in the bathroom, 5th story at east

    Issued 13 Oct 2026Notice of issuance sent to tenant 14 Oct 2026Mold and damp§ 27-2017.3

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 5th story at east

    Issued 13 Oct 2026Notice sent out 14 Oct 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 5th story at east

    Issued 13 Oct 2026Notice sent out 14 Oct 2026Leaks and plumbing§ 27-2026

  • Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen, 1st story at east

    Issued 18 Aug 2026Notice sent out 19 Aug 2026Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east at south, 5th story at east, section ''g-m'', at north

    Issued 1 Jul 2026Notice sent out 1 Jul 2026Walls and ceilings§ 27-2013

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft. at ceiling in the bathroom, 1st story at north, section ''east''

    Issued 17 May 2026Violation will be reinspected 6 Oct 2026Mold and damp§ 27-2017.3

  • Properly repair with similar material the broken or defective porcelain enamel glaze bathtub in the bathroom, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024Leaks and plumbing§ 27-2005

  • Refit closet door in the 3rd room from east at south, 1st story at west, section at north

    Issued 16 Nov 2024Notice sent out 21 Nov 2024Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroom, 3rd story at north, section ''north''

    Issued 16 Sept 2024Notice sent out 17 Sept 2024Walls and ceilings§ 27-2005

  • Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom, 3rd story at north, section ''north''

    Issued 16 Sept 2024Notice sent out 17 Sept 2024§ 27-2026

Show all 14
  • Properly repair or replace the broken or defective counter balances at 2nd window lower sash at north wall in the 1st room from east, 3rd story at north, section ''north''

    Issued 16 Sept 2024Notice sent out 17 Sept 2024Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at all walls in the 1st room from north, 1st story at west

    Issued 5 Jul 2024Not complied with 20 Nov 2024Walls and ceilings§ 27-2013

  • 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder south stack,at east court at fire escape

    Issued 16 Sept 2021Notice sent out 19 Sept 2021Fire and safety equipment§ 53

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 1st story

    Issued 5 Jul 2016Invalid certification 30 Aug 2016Walls and ceilings§ 27-2005

Paperwork and notices1 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • Dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, frame is not accessible, 1st story

    Issued 18 Apr 2015Notice sent out 19 Apr 2015Paperwork and notices§ 329

192 closed violations, plus 8 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 5th story at east, section ''g-m'', at north

    Issued 30 Jun 2026Violation dismissed 20 Oct 2026Fire and safety equipment§ 27-2045 +3

  • Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 5th story at east, section ''g-m'', at north

    Issued 30 Jun 2026Violation dismissed 20 Oct 2026Fire and safety equipment§ 27-2045 +2

  • Paint metal in accordance with dept. regulation at door in the entrance, 1st story at north, section ''east''

    Issued 17 May 2026Violation dismissed 20 Oct 2026Doors and windows§ 27-2005

  • Paint metal in accordance with dept. regulation at door in the entrance, 1st story at east

    Issued 28 Apr 2026Violation dismissed 20 Oct 2026Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at closet door in the 1st room from north, 1st story at east

    Issued 28 Apr 2026Violation dismissed 20 Oct 2026Doors and windows§ 27-2013

  • Paint metal in accordance with dept. regulation at riser in the 1st room from north, 1st story at east

    Issued 28 Apr 2026Violation dismissed 20 Oct 2026Walls and ceilings§ 27-2005

  • Abate the infestation consisting of roaches in the entire apartment, 5th story at east, section ''g-m'', at north

    Issued 30 Jun 2026Violation dismissed 30 Sept 2026Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 5th story at east, section ''g-m'', at north

    Issued 30 Jun 2026Violation dismissed 30 Sept 2026Pests§ 27-2017.4

  • Properly repair the source and abate the evidence of a water leak at ceiling and walls in the bathroom, 1st story at east

    Issued 29 Apr 2026Violation closed 16 Sept 2026Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom, 1st story at east

    Issued 29 Apr 2026Violation closed 16 Sept 2026Walls and ceilings§ 27-2005

  • Provide saddle at door in the 1st room from north, 1st story at east

    Issued 29 Apr 2026Violation dismissed 30 Aug 2026Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective wash basin wooden cabinet in the bathroom, 1st story at east

    Issued 29 Apr 2026Violation dismissed 30 Aug 2026Walls and ceilings§ 27-2005

  • Provide doir knob in the 1st room from north, 1st story at east

    Issued 29 Apr 2026Violation dismissed 30 Aug 2026§ 27-2005

  • Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Issued 29 Apr 2026Violation closed 15 Jul 2026Garbage and cleanliness§ 27-2021

  • Abate the nuisance consisting of vinyl floor tiles in the 2nd room from east, 1st story at north, section ''east''

    Issued 18 May 2026Violation closed 14 Jul 2026Floors and stairs§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom, 1st story at north, section ''east''

    Issued 18 May 2026Violation closed 14 Jul 2026Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom, 1st story at north, section ''east''

    Issued 18 May 2026Violation closed 14 Jul 2026Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective latch set and its assemblies at door at compactor closet, 1st story

    Issued 29 Apr 2026Violation closed 22 May 2026Fire and safety equipment§ 27-2005 +3

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots 4th story balcony 1st from north at east inner court building front at fire escape, section at east

    Issued 5 Jan 2026Violation dismissed 6 May 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items 1st from west at north 5th story balcony at fire escape, section at west

    Issued 5 Jan 2026Violation dismissed 6 May 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items 5th story balcony 1st from south at west inner court building front at fire escape, section at west

    Issued 5 Jan 2026Violation dismissed 6 May 2026Fire and safety equipment§ 27-2005 +1

  • Remove all encumbrances consisting of household items at public hall, 6th story

    Issued 5 Jan 2026Violation dismissed 6 May 2026Fire and safety equipment§ 27-2005 +1

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of buckets 6th story balcony 1sy from north at east inner court building front at fire escape, section at east

    Issued 5 Jan 2026Violation dismissed 6 May 2026Fire and safety equipment§ 27-2005 +1

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 6th story

    Issued 5 Jan 2026Violation dismissed 6 May 2026Garbage and cleanliness§ 27-2010

  • Replace or repair the self-closing doors that is missing or defective door and hinges bulkhead to roof at public hall, 6th story

    Issued 5 Jan 2026Violation closed 30 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges compactor closet at public hall, 6th story

    Issued 5 Jan 2026Violation closed 30 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Remove the illegal fastening consisting of lockable slide bolt installed on bulkhead door to roof at public hall, 6th story

    Issued 5 Jan 2026Violation closed 30 Mar 2026Roof and outside the building§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Violation closed 30 Jun 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Violation dismissed 12 Jun 2025Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the ceiling and walls at bulkhead to roof, section at north

    Issued 30 Nov 2024Violation dismissed 1 Jun 2025Roof and outside the building§ 27-2013

  • Trace and repair the source and abate the visible mold condition... less than 10 square feet ceiling north and east walls in the bathroom, 1st story at west, section at north

    Issued 16 Nov 2024Violation dismissed 4 May 2025Mold and damp§ 27-2017.3

  • Properly repair or replace the broken or defective lower sash spring balance at window in the kitchenette, 1st story at west

    Issued 30 Nov 2024Violation dismissed 31 Mar 2025Doors and windows§ 27-2005

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Violation dismissed 27 Mar 2025Pests§ 27-2017.4

  • Properly repair or replace the broken or defective latch assembly on vestibule door to public hall, 1st story

    Issued 16 Nov 2024Violation dismissed 23 Mar 2025Doors and windows§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at west, section at north

    Issued 16 Nov 2024Violation dismissed 23 Mar 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 1st story at west, section at north

    Issued 16 Nov 2024Violation dismissed 23 Mar 2025Fire and safety equipment§ 27-2045

  • Make safe by properly repairing the structural defect floor sinking danger of collapsing in the bathroom, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Violation closed 21 Mar 2025Floors and stairs§ 27-2005

  • Make safe by properly repairing the structural defect floor sinking danger of collapsing in the 1st room from east, 3rd story at north, section ''36-08''

    Issued 12 Dec 2024Violation closed 21 Mar 2025Floors and stairs§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 3rd story, section ''north ''

    Issued 18 Nov 2024Violation closed 21 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective door and latch vestibule door to public hall, 1st story

    Issued 16 Nov 2024Violation closed 21 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hopper door at south at public hall, 1st story

    Issued 10 Nov 2024Violation closed 21 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Properly repair or replace the broken or defective spring balance at lower window sash at fire escape window in the 2nd room from north at west, 3rd story at north

    Issued 19 Oct 2024Violation closed 21 Mar 2025Fire and safety equipment§ 27-2005

  • Properly repair or replace the broken or defective latch at hopper door at public hall, 1st story

    Issued 10 Nov 2024Violation dismissed 16 Mar 2025Doors and windows§ 27-2005

  • Cleanse to the satisfaction of this department the compactor closet at south at public hall, 1st story

    Issued 18 Sept 2024Violation dismissed 16 Mar 2025§ 27-2011

  • Properly repair or replace the broken or defective latch assembly at door at compactor closet, 3rd story, section ''north ''

    Issued 18 Nov 2024Violation dismissed 11 Mar 2025Doors and windows§ 27-2005

  • Abate the infestation consisting of roaches at compactor closet, 3rd story, section ''north ''

    Issued 18 Nov 2024Violation dismissed 26 Feb 2025Pests§ 27-2017.4

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Violation dismissed 13 Feb 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly at door in the entrance, 3rd story at north

    Issued 19 Oct 2024Violation dismissed 13 Feb 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly on compactor closet door at public hall, 1st story, section ''south''

    Issued 1 Oct 2024Violation dismissed 12 Jan 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly on compactor closet door at public hall, 4th story, section ''south''

    Issued 1 Oct 2024Violation dismissed 12 Jan 2025Doors and windows§ 27-2005

  • Properly repair or replace the broken or defective latch assembly on compactor closet door at public hall, 1st story, section ''north''

    Issued 1 Oct 2024Violation dismissed 12 Jan 2025Doors and windows§ 27-2005

  • Refit compactor closet door frame at south at public hall, 1st story

    Issued 18 Sept 2024Violation dismissed 12 Jan 2025Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 6th story at west

    Issued 3 Sept 2024Violation dismissed 29 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective outletat north wall in the kitchen, 6th story at west

    Issued 3 Sept 2024Violation dismissed 22 Dec 2024Electrical§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective latch in the entrance, 3rd story at north, section ''north ''

    Issued 18 Nov 2024Violation closed 14 Dec 2024Fire and safety equipment§ 27-2005 +3

  • Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall and at east wall in the bathroom, 1st story at west

    Issued 5 Jul 2024Violation closed 4 Dec 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... less than 10 sqft at door in the kitchen, 6th story at west

    Issued 3 Sept 2024Violation closed 1 Dec 2024Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling in the bathroom, 6th story at west

    Issued 3 Sept 2024Violation closed 1 Dec 2024Mold and damp§ 27-2017.3

  • Replace or repair the self-closing doors that is missing or defective latch assembly at door in the entrance, 3rd story at north

    Issued 19 Oct 2024Violation closed 30 Nov 2024Fire and safety equipment§ 27-2005 +3

  • Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling and north wall in the bathroom, 3rd story at north, section at north

    Issued 23 Jul 2024Violation closed 30 Nov 2024Mold and damp§ 27-2017.3

  • Properly repair or replace the broken or defective lock and assembly at building entrance door at public hall, 1st story

    Issued 3 Sept 2024Violation dismissed 26 Nov 2024Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at all walls and at ceiling in the foyer, 1st story at west

    Issued 5 Jul 2024Violation closed 20 Nov 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at all walls and at ceiling in the 2nd room from north, 1st story at west

    Issued 5 Jul 2024Violation closed 20 Nov 2024Walls and ceilings§ 27-2013

  • Replace or repair the self-closing doors that is missing or defective door latch and hinges on compactor closet door at public hall, 1st story, section ''south''

    Issued 1 Oct 2024Violation closed 12 Nov 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective latch on compactor closet door at public hall, 1st story, section ''north''

    Issued 1 Oct 2024Violation closed 12 Nov 2024Fire and safety equipment§ 27-2005 +3

  • Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen, 1st story at west

    Issued 5 Jul 2024Violation dismissed 5 Nov 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north, 1st story at west

    Issued 5 Jul 2024Violation dismissed 5 Nov 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 1st story at west

    Issued 5 Jul 2024Violation dismissed 5 Nov 2024Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at west

    Issued 5 Jul 2024Violation dismissed 6 Oct 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet at public hall, 4th story, section ''north''

    Issued 13 Jan 2024Violation closed 30 Jul 2024Fire and safety equipment§ 27-2005 +3

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at west wall in the 1st room from east, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 21 May 2024Electrical§ 27-2005

  • Repair the roof so that it will not leak at ceiling and north wall in the 1st room from east, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 21 May 2024Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department ceiling and west wall at public hall, 6th story, section ''south''

    Issued 13 Jan 2024Violation dismissed 21 May 2024Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 21 May 2024Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 6th story

    Issued 30 Jan 2024Violation closed 15 May 2024Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 3rd story

    Issued 30 Jan 2024Violation closed 15 May 2024Fire and safety equipment§ 27-2005 +3

  • Repair the roof so that it will not leak over ceiling in the kitchen, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 14 May 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 6th story, section ''south''

    Issued 13 Jan 2024Violation dismissed 14 May 2024Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 14 May 2024Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the foyer, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 14 May 2024Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 14 May 2024Walls and ceilings§ 27-2005

  • Provide an adequate supply of heat for the apartment in the entire apartment, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 7 Apr 2024Heat and hot water§ 27-2029

  • Provide hot water at all hot water fixtures in the entire apartment, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 7 Apr 2024Heat and hot water§ 27-2031

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 6th story at east, section ''south''

    Issued 13 Jan 2024Violation dismissed 7 Apr 2024Fire and safety equipment§ 27-2005 +3

  • Provide ready access to buildings heating system locked at basement at boiler room

    Issued 13 Jan 2024Violation dismissed 2 Apr 2024Heat and hot water§ 27-2033

  • Replace or repair the self-closing doors that is missing or defective frame at bulk head at 1st public hall bulkhead from east at south, 6th story, section ''south''

    Issued 13 Jan 2024Violation closed 30 Jan 2024Fire and safety equipment§ 27-2005 +3

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at east, 1st section from east at south

    Issued 28 Jan 2023Violation dismissed 21 May 2023Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at east, 1st section from east at south

    Issued 28 Jan 2023Violation dismissed 21 May 2023Fire and safety equipment§ 27-2046.1

  • Properly repair the broken or defective mortise lock at door in the entrance, 2nd story at east, 1st section from east at south

    Issued 28 Jan 2023Violation dismissed 21 May 2023Doors and windows§ 27-2005

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at east, 1st section from east at south

    Issued 28 Jan 2023Violation dismissed 7 May 2023Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at east, 1st section from east at south

    Issued 28 Jan 2023Violation dismissed 7 May 2023Pests§ 27-2017.4

  • Replace or repair the self-closing doors that is missing or defective repair door frame at vestibule door, 1st story

    Issued 11 Apr 2023Violation closed 27 Apr 2023Fire and safety equipment§ 27-2005 +3

  • Paint metal in accordance with dept. regulation the 1st door from south at west wall in the foyer, 1st story at east

    Issued 20 Apr 2022Violation dismissed 24 Nov 2022Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department.. north wall, baseboard at north wall in the foyer, 1st story at east

    Issued 20 Apr 2022Violation dismissed 19 Oct 2022Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color.. north wall in the foyer, 1st story at east

    Issued 20 Apr 2022Violation dismissed 19 Oct 2022Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway, the kitchen, 1st story at east

    Issued 20 Apr 2022Violation dismissed 19 Oct 2022Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen, 1st story at west

    Issued 19 Mar 2022Violation dismissed 14 Aug 2022Floors and stairs§ 27-2005

  • Replace with new the missing escutcheon plate at heat riser in the bathroom, 1st story at west

    Issued 19 Mar 2022Violation dismissed 10 Aug 2022Heat and hot water§ 27-2005

  • Properly repair the source and abate the evidence of a water leak.. ceiling in the kitchen, 1st story at east

    Issued 20 Apr 2022Violation dismissed 24 Jul 2022Leaks and plumbing§ 27-2026

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at east

    Issued 20 Apr 2022Violation dismissed 24 Jul 2022Pests§ 27-2017.4

Showing the 100 most recent of 192.

329 violations on record in total, 129 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

162 complaints in three years, 42 of them in the last twelve months.

  • Pests10 / 28
  • Walls and ceilings5 / 20
  • Leaks and plumbing3 / 18
  • Elevator6 / 15
  • Mold and damp2 / 14
  • Heat and hot water4 / 14
  • Garbage and cleanliness3 / 12
  • Doors and windows2 / 8
  • Floors and stairs1 / 7
  • Construction and illegal work1 / 6
  • Electrical2 / 6
  • Fire and safety equipment2 / 5
  • Appliances0 / 3
  • Super and management1 / 3
  • Noise0 / 1
  • Cooking gas0 / 1
  • Entry, buzzer and mail0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

5 cases, all closed.

  • False Certification Non-Lead

    Opened 25 Mar 2025

  • False Certification Non-Lead

    Opened 6 Dec 2024

  • False Certification Non-Lead

    Opened 16 Nov 2018

  • False Certification Non-Lead

    Opened 24 Aug 2007

  • False Certification Non-Lead

    Opened 19 Oct 2005

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

  • 20261 eviction
  • 20183 evictions
  • 20172 evictions

Filings

Public filing

Building permits

1 permit currently in force.

  • Equipment work

    Issued 12 May 2026Expires 17 Apr 2027

Show 1 expired or finished
  • Sidewalk Shed

    INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

    Issued 24 Oct 2023Expired 24 Oct 2024

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 20252 of 72 units reported infested (2024 report)
Show 10 earlier reports
  • 20241 of 72 units reported infested (2023 report)
  • 20241 of 72 units reported infested, 1 re-infested (2023 report)
  • 2024No infested units reported (2023 report)
  • 20233 of 72 units reported infested, 1 re-infested (2022 report)
  • 20225 of 72 units reported infested (2021 report)
  • 20216 of 72 units reported infested (2020 report)
  • 20201 of 72 units reported infested (2019 report)
  • 20192 of 72 units reported infested (2018 report)
  • 20196 of 72 units reported infested (2017 report)
  • 20193 of 72 units reported infested (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    MICHAEL YOUNG REALTY INC.

    Public records list MICHAEL YOUNG REALTY INC. as the registered managing agent for this address as of 23 Sept 2026. Source: HPD registration.

  • Owner of record

    36-08 QUEENS REALTY LLC

    Public records list 36-08 QUEENS REALTY LLC as the owner of record for this address as of 23 Sept 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 29 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 4 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. There are 7 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. There were 10 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 4003430024 · Block 343, Lot 24 · Building class D1