ByTenantsByTenants home

328 Covert Street, Brooklyn, NY 11237

Built 1906 · 3-story walk-up · 6 apartments

36 open violations, none immediately hazardous. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
3631 · 5
Public record
Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202200
202310
202400
202530
2026 so far00

Plus 94 violations from 1984 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 4
Open per apartment
6 (36 open across 6 apartments)
Inspector last found a problem
19 Feb 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Hazardous31 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair the broken or defective bell and buzzer in the foyer, 3rd story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Entry, buzzer and mail§ 27-2005

  • Properly repair with similar material the broken or defective mortar joints / ciment stocco at exterior brick east wall at east court, 3rd story

    Issued 25 Oct 2021Notice sent out 31 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Issued 25 Oct 2021Notice sent out 31 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at all walls in the bathroom, 1st story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective caulking around bathtub in the bathroom, 1st story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom, 1st story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north, 1st story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak from east wall in the 2nd room from north, 1st story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east, 3rd story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak at ceiling in the 3rd room from north at east, 3rd story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Leaks and plumbing§ 27-2005

Show all 31
  • Properly repair with similar material the broken or defective caulking around bathtub in the bathroom, 3rd story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Leaks and plumbing§ 27-2005

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 3rd story at east

    Issued 25 Oct 2021Notice sent out 28 Oct 2021Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective ceramic tiles at north and east walls in the bathroom, 1st story at east

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective grout around bathtub in the bathroom, 1st story at east

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east, 1st story at north

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east, 1st story at north

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling at bulkhead

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Leaks and plumbing§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 3rd story

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2005

  • Provide glass panel at front entrance door to building, 1st story

    Issued 29 Jan 2021Not complied with 12 Oct 2021Doors and windows§ 27-2005

  • Abate the nuisance consisting of plexi-glass panel at front entrance door to building, 1st story

    Issued 29 Jan 2021Not complied with 12 Oct 2021Doors and windows§ 27-2005 +1

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling at bulkhead

    Issued 7 Jul 2020Not complied with 12 Oct 2021Walls and ceilings§ 27-2005

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar

    Issued 27 Nov 2018First no access to re- inspect violation 19 Oct 2021Garbage and cleanliness§ 27-2010

  • Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate -- in the entire apartment, 3rd story

    Issued 27 May 2015Not complied with 12 Oct 2021Fire and safety equipment§ 27-2005 +1

  • Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate.. in the 1st room from east at north, 3rd story at north

    Issued 11 May 2015Not complied with 12 Oct 2021Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east, 2nd story

    Issued 3 Mar 2015First no access to re- inspect violation 19 Oct 2021Walls and ceilings§ 27-2005

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 2nd story

    Issued 3 Mar 2015First no access to re- inspect violation 19 Oct 2021Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing in the entire apartment, 2nd story

    Issued 3 Mar 2015First no access to re- inspect violation 19 Oct 2021Fire and safety equipment§ 27-2045

  • Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer, 2nd story

    Issued 3 Mar 2015First no access to re- inspect violation 19 Oct 2021Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of air conditioner protruding out window obstructing gooseneck ladder 3 sty balcony rear fire escape.

    Issued 17 Jul 1985Not complied with 12 Oct 2021Fire and safety equipment§ D26-10.01 +1

Non-hazardous5 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department at ceiling and all walls at bulkhead

    Issued 25 Oct 2021Notice sent out 3 Nov 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Issued 25 Oct 2021Notice sent out 31 Oct 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story

    Issued 12 Oct 2021Notice sent out 17 Oct 2021Walls and ceilings§ 27-2013

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood partitions erected front & rear cellar creating 2 rooms.

    Issued 19 Jul 1984First no access to re- inspect violation 19 Oct 2021§ 300

62 closed violations, plus 4 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • ×2Repair or replace the smoke detector missing in the entire apartment, 1st story at north

    2 issued 1 Sept 2020 to 19 Feb 2025Violation dismissedFire and safety equipment§ 27-2045

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 3rd story at north

    Issued 19 Feb 2025Violation dismissed 26 Jun 2025Fire and safety equipment§ 27-2046.1

  • ×2Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at north

    2 issued 1 Sept 2020 to 19 Feb 2025Violation dismissedFire and safety equipment§ 27-2046.1

  • Replace or repair the self-closing doors that is missing or defective... at public hall, 1st story

    Issued 31 Oct 2023Violation closed 17 Mar 2024Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective wood floor at intermediate landing at public stair at bulkhead

    Issued 25 Oct 2021Violation dismissed 6 Mar 2022Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at bulkhead

    Issued 25 Oct 2021Violation dismissed 6 Mar 2022Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead

    Issued 25 Oct 2021Violation dismissed 27 Jan 2022Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective mortar joints / ciment stocco at exterior brick east wall at east court, 1st story

    Issued 25 Oct 2021Violation closed 25 Nov 2021Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling at public hall, 3rd story

    Issued 25 Oct 2021Violation closed 25 Nov 2021Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 1st story at east

    Issued 4 May 2021Violation dismissed 20 Oct 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer, 1st story at east

    Issued 23 Sept 2020Violation closed 16 Oct 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color.the.east wall in the 2nd room from north, 1st story

    Issued 29 Jan 2021Violation closed 12 Oct 2021Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at east wall in the 2nd room from north, 1st story at east

    Issued 23 Sept 2020Violation closed 12 Oct 2021Walls and ceilings§ 27-2013

  • Cleanse to the satisfaction of this department the ceramic tiles with grouted joints of visible mold at east wall in the bathroom, 1st story at east

    Issued 23 Sept 2020Violation closed 12 Oct 2021Mold and damp§ 27-2011

  • Abate the nuisance consisting of (unfasten dumbwaiter door by an interior lock in the shaft operated and controlled from a central point in to cellar) at public hall, 1st story

    Issued 23 Sept 2020Violation closed 12 Oct 2021Doors and windows§ 27-2005 +1

  • Repair the roof so that it will not leak over window at west wall in the 2nd room from north at west, 3rd story at west

    Issued 7 Jul 2020Violation closed 12 Oct 2021Leaks and plumbing§ 27-2005

  • Remove the illegal fastening double cylinder key operating lock at metal entrance door to building, 1st story

    Issued 4 Jan 2017Violation closed 12 Oct 2021Doors and windows§ 27-2005 +1

  • Remove the illegal fastening double cylinder lock at door. building entrance, 1st story

    Issued 24 Oct 2016Violation closed 12 Oct 2021Doors and windows§ 27-2005 +1

  • Remove the illegal fastening double cylinder key operated lock installed on door street entrance to building

    Issued 27 May 2015Violation closed 12 Oct 2021Doors and windows§ 27-2005 +1

  • Remove the illegal fastening double cylinder key operated lock at entrance to building door, 1st story

    Issued 11 May 2015Violation closed 12 Oct 2021Doors and windows§ 27-2005 +1

  • Arrange and make self-closing the doors bulkhead to roof.

    Issued 19 Jul 1984Violation closed 12 Oct 2021Fire and safety equipment§ D26-10.01 +1

  • Arrange and make self-closing the doors at vestibule, 1st story

    Issued 4 May 2021Violation closed 10 Jul 2021Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors at vestibule at public hall, 1st story

    Issued 29 Jan 2021Violation closed 22 Mar 2021Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors at front entrance to building, 1st story

    Issued 29 Jan 2021Violation closed 22 Mar 2021Fire and safety equipment§ 27-2005 +1

  • Properly repair with similar material the broken or defective cracked and loose stucco at east building extorter wall at 1st story, east driveway

    Issued 23 Sept 2020Violation closed 15 Mar 2021Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective bulding,cracked and loose stucco at south building extorter wall at 2nd story, at south yard

    Issued 23 Sept 2020Violation closed 15 Mar 2021Roof and outside the building§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead

    Issued 7 Jul 2020Violation dismissed 10 Jan 2021Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the east wall at vestibule, 1st story

    Issued 7 Jul 2020Violation dismissed 10 Jan 2021Walls and ceilings§ 27-2013

  • Refit the door at vestibule, 1st story

    Issued 7 Jul 2020Violation dismissed 10 Jan 2021Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east, 1st story at north

    Issued 1 Sept 2020Violation dismissed 3 Jan 2021Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway, 1st story at east

    Issued 1 Sept 2020Violation dismissed 3 Jan 2021Walls and ceilings§ 27-2005

  • Arrange and make self-closing the doors at apartment in the entrance, 1st story at east

    Issued 23 Sept 2020Violation dismissed 29 Dec 2020Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors at front entrance to building, 1st story

    Issued 23 Sept 2020Violation dismissed 29 Dec 2020Fire and safety equipment§ 27-2005 +1

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at east

    Issued 23 Sept 2020Violation dismissed 20 Dec 2020Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at east

    Issued 23 Sept 2020Violation dismissed 20 Dec 2020Fire and safety equipment§ 27-2045

  • Rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line

    Issued 4 Dec 2018Violation dismissed 2 Jun 2019Fire and safety equipment§ 62

  • Arrange and make self-closing the doors at bulk head to roof, 3rd story

    Issued 4 Dec 2018Violation dismissed 7 Apr 2019Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors at building entrance, 1st story

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Fire and safety equipment§ 27-2005 +1

  • Replace with new the missing safty caps on electrical outlet at north wall at public hall, 2nd story

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Electrical§ 27-2005

  • Replace with new the missing safty caps on electrical outlet at north wall at public hall, 1st story

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Electrical§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective, 3rd story at north

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Fire and safety equipment§ 27-2046.1

  • Arrange and make self-closing the doors at vestibule, 1st story

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Fire and safety equipment§ 27-2005 +1

  • Remove the illegal fastening consisting a double cylinder key operated lock installed on building entrance door, 1st story

    Issued 4 Dec 2018Violation dismissed 20 Feb 2019Doors and windows§ 27-2005 +1

  • Arrange and make self-closing the doors at front entrance from street at public hall, 1st story

    Issued 27 Nov 2018Violation dismissed 20 Feb 2019Fire and safety equipment§ 27-2005 +1

  • Remove all obstructions and repair all defects in wasteline pipe at bathtub in the bathroom, 3rd story at north

    Issued 11 May 2015Violation closed 5 Dec 2018Leaks and plumbing§ 27-2026

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. at front areaway

    Issued 27 May 2018Violation closed 27 Nov 2018Electrical§ 27-2040

  • Provide ready access to buildings heating system boiler room door locked at cellar

    Issued 28 Dec 2016Violation closed 27 Nov 2018Heat and hot water§ 27-2033

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at west

    Issued 7 Jun 2016Violation closed 27 Nov 2018Fire and safety equipment§ 27-2045

  • Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment, 1st story at west

    Issued 7 Jun 2016Violation closed 27 Nov 2018Fire and safety equipment§ 27-2046.1

  • Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line rear yard.

    Issued 19 Jul 1984Violation closed 27 Nov 2018Fire and safety equipment§ D26-10.01 +1

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration water closet installed center cellar.

    Issued 19 Jul 1984Violation closed 27 Nov 2018§ 300

  • Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at north

    Issued 28 Dec 2016Violation dismissed 19 Sept 2017Heat and hot water§ 27-2029

  • Repair the leaky and/or defective faucets shower body at bathtub in the bathroom, 3rd story

    Issued 27 May 2015Violation closed 23 Jun 2016Leaks and plumbing§ 27-2026

  • Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom, 3rd story at north

    Issued 11 May 2015Violation closed 23 Jun 2016§ 27-2026

  • Provide adequate light of not less than 60 watts incandescent or equivalent illumination.. at public hall, 2nd story

    Issued 3 Mar 2015Violation closed 23 Jun 2016Electrical§ 27-2039

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required

    Issued 6 Feb 2006Violation closed 23 Jun 2016Electrical§ 27-2040

  • Provide adequate light of not less than 60 watts incandescent or equivalent illumination 2 & 3 sty pub halls.

    Issued 19 Jul 1984Violation closed 23 Jun 2016Electrical§ D26-19.05

  • Remove all obstructions and repair all defects in waste line for bathtub in the bathroom, 3rd story

    Issued 27 May 2015Violation dismissed 24 Jun 2015Leaks and plumbing§ 27-2026

  • Repair the broken or defective connection waste line at sink in the kitchen, 3rd story at north

    Issued 11 May 2015Violation closed 23 Jun 2015Leaks and plumbing§ 27-2026

  • Rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line roof rear.

    Issued 17 Jul 1985Violation closed 19 May 2014Fire and safety equipment§ 62

102 violations on record in total, 36 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

27 complaints in three years, 1 of them in the last twelve months.

  • Noise0 / 10
  • Fire and safety equipment0 / 5
  • Pests0 / 3
  • Doors and windows0 / 3
  • Heat and hot water0 / 3
  • Leaks and plumbing1 / 2
  • Garbage and cleanliness0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

1 case, all closed.

  • Heat and Hot Water

    Opened 15 Feb 2017

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 8 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2021No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)
  • 2020No infested units reported (2018 report)
  • 2019No infested units reported (2017 report)
  • 2019No infested units reported (2017 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record and managing agent

    328 E & E LLC

    Public records list 328 E & E LLC as the owner of record and the registered managing agent for this address as of 14 Jul 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city has 31 open hazardous violations on this building. Ask which apartments they concern and what has been done since.
  2. The city recorded 1 mould violation here, most recently in 2020, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 1 complaints in the last twelve months.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 3034250026 · Block 3425, Lot 26 · Building class C2