ByTenantsByTenants home

371 Irving Avenue, Brooklyn, NY 11237

Built 1931 · 4-story walk-up · 8 apartments

2 immediately hazardous violations open. 6 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
62 · 4
Public record
Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
20223613
202360
2024433
2025231
2026 so far10

Plus 222 violations from 2004 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 31
  • Fire and safety equipment 25
  • Leaks and plumbing 17
Open per apartment
0.8 (6 open across 8 apartments)
Inspector last found a problem
23 Jan 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 3 days.

WinterDaysComplaintsViolations
2025–26330

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous2 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at west wall, 1st door frame from east at south wall, 1st dumb waiter from north at east wall, west wall, 1st window frame from south at west wall in the kitchen, 2nd story at west

    Issued 23 May 2022Defect letter issued 14 May 2025Lead paint§ 27-2056.6

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 2nd story at west

    Issued 13 Sept 2021Notice sent out 15 Sept 2021Lead paint§ 27-2056.7 +2

Hazardous4 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Properly repair with similar material the broken or defective wood floor in the 1st room from north at west, 4th story at south

    Issued 10 Feb 2025First no access to re- inspect violation 14 May 2025Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 1st room from north, 4th story at south

    Issued 22 Dec 2024First no access to re- inspect violation 14 May 2025Floors and stairs§ 27-2005

  • Properly repair or replace the broken or defective inoperable electrical outlet at west wall in the 1st room from north, 4th story at south

    Issued 22 Dec 2024First no access to re- inspect violation 14 May 2025Electrical§ 27-2005

  • Properly repair with similar material the broken or defective cracked brick wall at parapet's ledger with deterioated and missing mortar at joints at 4th story, southwest section, at west yard

    Issued 23 May 2022Not complied with 14 May 2025Roof and outside the building§ 27-2005

344 closed violations, plus 6 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective hinges at building entrance door, 1st story

    Issued 23 Jan 2026Violation closed 3 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Repair the leaky and/or defective faucets shower handle in the bathroom, 4th story at south

    Issued 10 Feb 2025Violation closed 5 Oct 2025Leaks and plumbing§ 27-2026

  • The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Issued 31 Jan 2025Violation dismissed 4 Jun 2025§ 27-2153

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 1st room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 2nd room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 2nd window frame from east at south wall in the 1st room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the foyer, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom, 2nd story at west

    Issued 27 Oct 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 1st room from east at south, 2nd story at west

    Issued 27 Jun 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from east at south, 2nd story at west

    Issued 27 Jun 2022Violation closed 2 Jun 2025Lead paint§ 27-2056.6

  • Trace and repair the source and abate the visible mold condition... greater than 30sq ft at east wall and south wall in the closet at east wall in the foyer, 4th story at north

    Issued 6 Jan 2025Violation closed 1 Jun 2025Mold and damp§ 27-2017.3

  • 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at cellar

    Issued 14 Jun 2023Violation closed 14 May 2025Garbage and cleanliness§ 27-2010

  • Replace or repair the self-closing doors that is missing or defective entrance at cellar

    Issued 14 Jun 2023Violation closed 14 May 2025Fire and safety equipment§ 27-2005 +3

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer, 2nd story at west

    Issued 13 Sept 2021Violation closed 1 May 2025Lead paint§ 27-2056.6

  • Trace and repair the source and abate the visible mold condition... greater than 30 sqft at all walls and ceiling in 1st closet from north at east in the foyer, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Apr 2025Mold and damp§ 27-2017.3

  • Abate the infestation consisting of roaches in the entire apartment, 4th story at south

    Issued 22 Dec 2024Violation closed 16 Apr 2025Pests§ 27-2017.4

  • Abate the infestation consisting of bedbugs in the entire apartment, 3rd story at north

    Issued 12 Jun 2024Violation closed 16 Apr 2025Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Apr 2025Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Apr 2025Pests§ 27-2017.4

  • Trace and repair the source and abate the visible mold condition... at ( approximately 16sqft ceiling and walls 1st closet from west at north wall wall in the foyer, 2nd story at west

    Issued 13 Sept 2021Violation closed 16 Apr 2025Mold and damp§ 27-2017.3

  • Repair the leaky and/or defective faucets at sink in the kitchen, 1st story at west

    Issued 27 Nov 2024Violation dismissed 30 Mar 2025Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant material at ceiling at fire passage way, 1st story, section ''west''

    Issued 11 Mar 2025Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak over ceiling at fire passage way, 1st story, section ''west''

    Issued 11 Mar 2025Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door

    Issued 24 Feb 2025Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective fire rated material at ceiling, section ''south''

    Issued 24 Feb 2025Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair or replace the broken or defective mailbox in the vestibule at public hall, 1st story

    Issued 24 Feb 2025Violation closed 16 Mar 2025Entry, buzzer and mail§ 27-2005

  • Remove all encumbrances consisting of holuse hold items at public hall, 4th story

    Issued 24 Feb 2025Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +1

  • ×2Remove all encumbrances consisting of bicycles at public hall, 1st story

    2 issued 11 Dec 2024 to 24 Feb 2025Violation closedFire and safety equipment§ 27-2005 +1

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire located cellar at ceiling, section ''south''

    Issued 24 Feb 2025Violation closed 16 Mar 2025Electrical§ 27-2005

  • Provide adequate lighting light fixture at ceiling at public hall, 3rd story

    Issued 24 Feb 2025Violation closed 16 Mar 2025Electrical§ 27-2037

  • Properly repair with similar material the broken or defective fire rated material at cellar ceiling, section ''south''

    Issued 24 Feb 2025Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Abate the nuisance consisting of bed obstructing egress to fire escape window in the n1 room in the 1st room from north, 3rd story at west

    Issued 24 Feb 2025Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance, 4th story at west

    Issued 24 Feb 2025Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Properly repair with similar material the broken or defective brick and mortar at parapet wall at rooftop located at north wall

    Issued 10 Feb 2025Violation closed 16 Mar 2025Roof and outside the building§ 27-2005

  • Properly repair with similar material the broken or defective fire rated material at cellar ceiling at cellar

    Issued 10 Feb 2025Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Replace with new the missing wire mesh under skylight at bulkhead

    Issued 10 Feb 2025Violation closed 16 Mar 2025Roof and outside the building§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at bulkhead ceiling

    Issued 10 Feb 2025Violation closed 16 Mar 2025Walls and ceilings§ 27-2013

  • ×2Properly repair with similar material the broken or defective wood floor in the foyer, 2nd story at north

    2 issued 22 Dec 2024Violation closedFloors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall in the 3rd room from north, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at the ceiling and east wall in the 3rd room from north, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • ×2Repair the leaky and/or defective faucets at sink in the kitchen, 4th story at south

    2 issued 22 Dec 2024 to 10 Feb 2025Violation closedLeaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in 1st closet from north at east in the private hallway, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west, 4th story at south

    Issued 22 Dec 2024Violation closed 16 Mar 2025Floors and stairs§ 27-2005

  • Properly repair or replace the broken or defective leaking steam valve at 1st steam riser from west at north in the bathroom, 4th story at south

    Issued 22 Dec 2024Violation dismissed 16 Mar 2025Heat and hot water§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west, 4th story at south

    Issued 22 Dec 2024Violation dismissed 16 Mar 2025Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at east wall in the bathroom, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2013

  • Properly repair the source and abate the evidence of a water leak at all walls and ceiling in 1st closet from north at east in the foyer, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Fire and safety equipment§ 27-2045

  • Properly repair the source and abate the evidence of a water leak at all walls and ceiling in 1st closet from north at east in the private hallway, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective reglaze bathtub surface with spray enamel in the bathroom, 4th story at south

    Issued 22 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2005

  • Paint metal in accordance with dept. regulation at 1st steam riser from west at north in the bathroom, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Heat and hot water§ 27-2005

  • Properly repair with similar material the broken or defective reglaze bathtub surface with spray enamel in the bathroom, 2nd story at north

    Issued 22 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the foyer, 4th story at north

    Issued 13 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall ( inside closet) in the 4th room from north at west, 4th story at north

    Issued 13 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over ceiling (inside closet at east) in the 4th room from north at west, 4th story at north

    Issued 13 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the south wall( inside closet at east ) in the foyer, 4th story at north

    Issued 13 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entire apartment, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +3

  • Repair the roof so that it will not leak at closet at ceiling in the 4th room from north, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant plaster at ceiling and all walls at public hall, 4th story

    Issued 11 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 4th room from north, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west and north wall in the private hallway, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 4th story

    Issued 11 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective wood floor in the private hallway, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at east and north in the 4th room from north, 4th story at north

    Issued 11 Dec 2024Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling and south wall at cellar

    Issued 14 Jun 2023Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling at basement front door entrance at cellar

    Issued 14 Jun 2023Violation closed 16 Mar 2025Leaks and plumbing§ 27-2026

  • Properly repair the broken or defective paving concrete pavement at inner court

    Issued 14 Jun 2023Violation closed 16 Mar 2025Roof and outside the building§ 27-2005

  • Properly repair with similar material the broken or defective concrete steps up from bottom at stairs at fire passage way

    Issued 14 Jun 2023Violation closed 16 Mar 2025Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, 1st closet from north at east wall wall, ceiling in the 2nd room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from east at south, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom, 2nd story at west

    Issued 27 Oct 2022Violation closed 16 Mar 2025Walls and ceilings§ 27-2005

  • Properly repair the broken or defective counter balance at lower window sash at east wall at public hall stairs, 3rd story

    Issued 16 Oct 2022Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of discarded air conditioner on 2nd story balcony, stack at west, building front. at fire escape

    Issued 16 Oct 2022Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Properly repair the broken or defective counter balance at lower window sash at east wall at public hall, 2nd story

    Issued 16 Oct 2022Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Properly repair the broken or defective counter balance at lower window sash at east wall at public hall stairs, 2nd story

    Issued 16 Oct 2022Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Remove all encumbrances consisting of household items at public hall, 3rd story

    Issued 16 Oct 2022Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Properly repair the broken or defective counter balance at lower window sash at east wall at public hall stairs, 1st story

    Issued 16 Oct 2022Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of stored air conditioner unit at 2nd story balcony at west at building front at fire escape

    Issued 12 Oct 2022Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +1

  • Abate the nuisance consisting of locked door leading to roof at 1st public hall bulkhead from north at west

    Issued 12 Oct 2022Violation closed 16 Mar 2025Roof and outside the building§ 27-2005 +1

  • Properly repair the broken or defective mortise locking device at door in the entrance, 2nd story at west

    Issued 23 May 2022Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective door leading to north at public hall, 1st story

    Issued 23 May 2022Violation closed 16 Mar 2025Fire and safety equipment§ 27-2005 +2

  • Remove the illegal fastening key operated lock at door to north yard on the exterior at public hall, 1st story

    Issued 23 May 2022Violation closed 16 Mar 2025Roof and outside the building§ 27-2005 +1

  • Remove the illegal fastening key operated lock at door, public hall, west yard, 1st story

    Issued 13 Sept 2021Violation closed 16 Mar 2025Roof and outside the building§ 27-2005 +1

  • Replace with new the missing handrail at stair, west yard, at fire passage way, section ''northwest''

    Issued 13 Sept 2021Violation closed 16 Mar 2025Roof and outside the building§ 27-2005

  • Properly repair the broken or defective counter balance atlower sash window to west wall in the kitchen, 2nd story at west

    Issued 13 Sept 2021Violation closed 16 Mar 2025Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective wooden strip at floor in the private hallway, 4th story at south

    Issued 18 Feb 2021Violation closed 16 Mar 2025Floors and stairs§ 27-2005

  • Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 3rd story at west

    Issued 24 Feb 2025Violation closed 10 Mar 2025Heat and hot water§ 27-2028 +1

  • Provide hot water at all hot water fixtures in the entire apartment, 4th story at west

    Issued 24 Feb 2025Violation closed 10 Mar 2025Heat and hot water§ 27-2031

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west

    Issued 24 Feb 2025Violation closed 10 Mar 2025Heat and hot water§ 27-2031

  • Properly repair with similar material the broken or defective fire rated material at bulkhead ceiling

    Issued 10 Feb 2025Violation closed 10 Mar 2025Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak at east and north wall at public hall, 4th story

    Issued 11 Dec 2024Violation dismissed 2 Mar 2025Leaks and plumbing§ 27-2005

  • Properly repair or replace the broken or defective security lock at door in the entrance, 1st story at west

    Issued 27 Nov 2024Violation dismissed 23 Feb 2025Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer, 4th story at north

    Issued 13 Dec 2024Violation closed 29 Jan 2025Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak at ceiling in the private hallway, 4th story at north

    Issued 11 Dec 2024Violation closed 29 Jan 2025Leaks and plumbing§ 27-2005

Showing the 100 most recent of 344.

356 violations on record in total, 6 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

55 complaints in three years, 5 of them in the last twelve months.

  • Heat and hot water3 / 14
  • Pests0 / 10
  • Walls and ceilings0 / 6
  • Leaks and plumbing0 / 6
  • Noise2 / 5
  • Floors and stairs0 / 4
  • Garbage and cleanliness0 / 3
  • Mold and damp0 / 3
  • Electrical0 / 2
  • Doors and windows0 / 1
  • Fire and safety equipment0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

3 cases, all closed.

  • Heat and Hot Water

    Opened 30 Dec 2020

  • Heat and Hot Water

    Opened 16 Dec 2019

  • Heat and Hot Water

    Opened 11 Jan 2018

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 5 earlier reports
  • 20256 of 8 units reported infested (2023 report)
  • 2024No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2021No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Owner of record and managing agent

    DS BROOKLYN PORTFOLIO OWNER LLC

    Public records list DS BROOKLYN PORTFOLIO OWNER LLC as the owner of record and the registered managing agent for this address as of 14 Jul 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 2 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 3 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. The city recorded 3 mould violations here, most recently in 2025, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 3033630003 · Block 3363, Lot 3 · Building class C1