ByTenantsByTenants home

1507 Gates Avenue, Brooklyn, NY 11237

Built 1931 · 3-story walk-up · 6 apartments

13 immediately hazardous violations open. 23 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
2313 · 7 · 3
Public record
Updated yesterdayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202275
202300
202494
202520
2026 so far257

Plus 149 violations from 1984 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Walls and ceilings 17
  • Leaks and plumbing 9
  • Lead paint 7
Open per apartment
3.8 (23 open across 6 apartments)
Inspector last found a problem
22 Sept 2026 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous13 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout at basement

    Issued 6 Apr 2026Not complied with 15 Jul 2026Pests§ 27-2017 +6

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at west

    Issued 6 Apr 2026Defect letter issued 17 Jul 2026Pests§ 27-2017.4

  • Provide ready access to buildings heating system locked door at cellar at boiler room

    Issued 25 Sept 2025Notice sent out 28 Sept 2025Heat and hot water§ 27-2033

  • Remove device preventing door from being self-closing permanently installed sweep and kickstand at bottom of door keeping it from being self closing in the entrance, 1st story at east

    Issued 2 Dec 2024Notice sent out 2 Dec 2024Fire and safety equipment§ 27-2005 +1

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at east

    Issued 2 Dec 2024Notice of issuance sent to tenant 2 Dec 2024Pests§ 27-2017.4

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east, 3rd story at west

    Issued 3 Apr 2020Certification postponment granted 30 Apr 2020Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom, 3rd story at west

    Issued 3 Apr 2020Certification postponment granted 30 Apr 2020Lead paint§ 27-2056.6

  • Abate the infestation consisting of mice in the entire apartment, 1st story at south

    Issued 30 Nov 2019False certification 24 Feb 2020Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 1st story at south

    Issued 30 Nov 2019False certification 24 Feb 2020Pests§ 27-2017.4

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, west wall in the 2nd room from east, 1st story at south

    Issued 8 Jun 2019Certification postponment denied 14 Jul 2019Lead paint§ 27-2056.6

Show all 13
  • Abate the infestation consisting of roaches in the entire apartment, 1st story at south

    Issued 8 Jun 2019Invalid certification 4 Jul 2019Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at north

    Issued 7 Jun 2019Invalid certification 4 Jul 2019Pests§ 27-2017.4

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Issued 31 May 2019Notice sent out 2 Jan 2024Heat and hot water§ 27-2033

Hazardous7 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Trace and repair the source and abate the visible mold condition... more than 10 sq. ft. at south wall in the bathroom, 3rd story at west

    Issued 6 Apr 2026Defect letter issued 17 Jul 2026Mold and damp§ 27-2017.3

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 3rd story at north

    Issued 18 Feb 2026Notice sent out 22 Feb 2026Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen, 1st story at east

    Issued 2 Dec 2024Notice sent out 2 Dec 2024Walls and ceilings§ 27-2005

  • Properly repair the broken or defective wood cabinet doors out of one hinge or loose in the kitchen, 1st story at south

    Issued 8 Jun 2019Notice sent out 2 Jan 2024Doors and windows§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the entire apartment, 1st story at west

    Issued 31 May 2019Notice sent out 2 Jan 2024Floors and stairs§ 27-2005

  • Properly repair the broken or defective cabinet base in the kitchen, 1st story at west

    Issued 31 May 2019Notice sent out 2 Jan 2024Walls and ceilings§ 27-2005

  • Replace with new the missing mechanical air vent in the bathroom, 1st story at west

    Issued 31 May 2019Notice sent out 2 Jan 2024§ 27-2005

Non-hazardous3 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Properly repair with similar material the broken or defective wooden window casing at 1st and 2nd window from west at north in the kitchen, 3rd story at north

    Issued 22 Sept 2026Notice sent out 23 Sept 2026Doors and windows§ 27-2005

  • Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the kitchen, 3rd story at north

    Issued 22 Sept 2026Notice sent out 23 Sept 2026Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color north wall and ceiling in the bathroom, 3rd story at north

    Issued 22 Sept 2026Notice sent out 23 Sept 2026Walls and ceilings§ 27-2005

185 closed violations, plus 13 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Properly repair or replace the broken or defective counter top at sink in the kitchen, 3rd story at west

    Issued 6 Apr 2026Violation closed 17 Jul 2026Leaks and plumbing§ 27-2005

  • Replace with new the missing electrical outlet cover plate at south wall in the 3rd room from east, 3rd story at west

    Issued 6 Apr 2026Violation closed 17 Jul 2026Electrical§ 27-2005

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment, 3rd story at west

    Issued 6 Apr 2026Violation closed 17 Jul 2026Fire and safety equipment§ 27-2043.1

  • Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen, 3rd story at west

    Issued 6 Apr 2026Violation closed 17 Jul 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east, 3rd story at west

    Issued 6 Apr 2026Violation closed 17 Jul 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the 5th room from north, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, the kitchen, the 2nd room from north, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Walls and ceilings§ 27-2013

  • Repair the roof so that it will not leak over the ceiling ceiling in the bathroom, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Walls and ceilings§ 27-2005

  • Replace with new the missing ontlet cover at the west wall in the 2nd room from north, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Walls and ceilings§ 27-2005

  • Repair the roof so that it will not leak over the ceiling ( tin ceiling in this room ) in the 5th room from north, 3rd story at east

    Issued 18 Mar 2026Violation closed 17 Jul 2026Leaks and plumbing§ 27-2005

  • Paint with light colored paint to the satisfaction of this department entrance door 3rd door from west at north wall in the 4th room from north, 3rd story at north

    Issued 18 Feb 2026Violation closed 17 Jul 2026Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen, the bathroom, 3rd story at north

    Issued 18 Feb 2026Violation closed 17 Jul 2026Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the entrance door in the 3rd room from north, 3rd story at north

    Issued 18 Feb 2026Violation closed 17 Jul 2026Doors and windows§ 27-2013

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at east

    Issued 18 Mar 2026Violation dismissed 1 Jul 2026Pests§ 27-2017.4

  • Repair the roof so that it will not leak over ceiling in the bathroom, 3rd story at north

    Issued 18 Feb 2026Violation closed 22 Jun 2026Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over the ceiling in the kitchen, 3rd story at north

    Issued 18 Feb 2026Violation closed 22 Jun 2026Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over the ceiling ceiling in the kitchen, 3rd story at east

    Issued 18 Mar 2026Violation dismissed 11 Jun 2026Leaks and plumbing§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color approx 8 sq feet at the ceiling in the kitchen, 3rd story at east

    Issued 18 Mar 2026Violation dismissed 11 Jun 2026Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 1st story at north

    Issued 6 Apr 2026Violation closed 4 Jun 2026Walls and ceilings§ 27-2005

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen, 3rd story at west

    Issued 13 Apr 2026Violation closed 29 May 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east, 3rd story at west

    Issued 13 Apr 2026Violation closed 29 May 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from north, 3rd story at north

    Issued 18 Feb 2026Violation closed 19 Mar 2026Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 3rd door frame from west at north wall in the 4th room from north, 3rd story at north

    Issued 18 Feb 2026Violation closed 19 Mar 2026Lead paint§ 27-2056.6

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at west

    Issued 25 Sept 2025Violation closed 19 Oct 2025Heat and hot water§ 27-2031

  • Provide a safe and adequate supply of electric service to the fixtures at all electrical outlets and light fixtures troughout in the entire apartment, 1st story at east

    Issued 2 Dec 2024Violation dismissed 24 Feb 2025Electrical§ 27-2037

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at east

    Issued 2 Dec 2024Violation dismissed 24 Feb 2025Heat and hot water§ 27-2031

  • Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at east

    Issued 2 Dec 2024Violation dismissed 24 Feb 2025Heat and hot water§ 27-2029

  • Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 21 Jul 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 21 Jul 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 21 Jul 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 21 Jul 2024Walls and ceilings§ 27-2013

  • Repair the roof so that it will not leak over ceiling in the 3rd room from east, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 16 May 2024Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the 1st room from east, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 16 May 2024Leaks and plumbing§ 27-2005

  • Repair the roof so that it will not leak over ceiling in the bathroom, 3rd story at west

    Issued 20 Jan 2024Violation dismissed 16 May 2024Leaks and plumbing§ 27-2005

  • Replace with new the broken or defective marble saddle at entrance in the bathroom, 1st story at west

    Issued 9 Mar 2020Violation dismissed 27 Mar 2024§ 27-2005

  • Properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from north, 1st story at west

    Issued 9 Mar 2020Violation dismissed 27 Mar 2024Floors and stairs§ 27-2005

  • Properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at rear

    Issued 9 Mar 2020Violation dismissed 27 Mar 2024Walls and ceilings§ 185 +1

  • Properly repair the broken or defective lower kitchen cabilets in the kitchen, 1st story at west

    Issued 17 Aug 2019Violation dismissed 27 Mar 2024§ 27-2005

  • Properly repair with similar material the broken or defective floor ceramic tiles in the bathroom, 1st story at west

    Issued 17 Aug 2019Violation dismissed 27 Mar 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 1st story at west

    Issued 14 Aug 2019Violation dismissed 27 Mar 2024Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen, 1st story at west

    Issued 14 Aug 2019Violation dismissed 27 Mar 2024Leaks and plumbing§ 27-2005

  • Properly repair with similar material the broken or defective wood floor in the kitchen, 1st story at south

    Issued 8 Jun 2019Violation dismissed 27 Mar 2024Floors and stairs§ 27-2005

  • Replace with new the broken or defective ceramic tiles at floor in the bathroom, 1st story at south

    Issued 8 Jun 2019Violation dismissed 27 Mar 2024Floors and stairs§ 27-2005

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment, 3rd story at south

    Issued 21 Feb 2020Violation dismissed 25 Mar 2024Fire and safety equipment§ 27-2043.1

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system.... at public hall, 1st story

    Issued 22 Jan 2020Violation dismissed 25 Mar 2024Heat and hot water§ 27-2033

  • Replace with new the missing grill for vent in wall of bathroom 1st sty west apartment

    Issued 7 Feb 1984Violation dismissed 20 Mar 2024Walls and ceilings§ D26-10.01

  • Paint metal in accordance with dept. regulation the ceiling in the 1st room from east, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 7 May 2023Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 7 May 2023Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 7 May 2023Walls and ceilings§ 27-2013

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 7 May 2023Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the kitchen, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 7 May 2023Heat and hot water§ 27-2005

  • Properly repair the broken or defective window counter balance spring at first window from south at west lower sash. in the kitchen, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 15 Mar 2023Doors and windows§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 9 Mar 2023Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 9 Mar 2023Fire and safety equipment§ 27-2046.1

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment, 3rd story at west

    Issued 14 Nov 2022Violation dismissed 26 Feb 2023Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 2nd window frame from north at east wall in the 1st room from east, 3rd story at west

    Issued 14 Nov 2022Violation closed 12 Jan 2023Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the kitchen, 3rd story at west

    Issued 14 Nov 2022Violation closed 12 Jan 2023Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east, 3rd story at west

    Issued 14 Nov 2022Violation closed 12 Jan 2023Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east, 1st story at south

    Issued 18 Oct 2019Violation closed 18 Feb 2021Lead paint§ 27-2056.6

  • Paint with light colored paint to the satisfaction of this department all walls, ceilings and trim throughout in the entire apartment, 1st story at east

    Issued 22 Jan 2020Violation dismissed 14 Jul 2020Walls and ceilings§ 27-2013

  • Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 3rd story

    Issued 16 May 2020Violation closed 28 Jun 2020Fire and safety equipment§ 27-2005 +1

  • Abate the infestation consisting of mice in the entire apartment, 1st story at west

    Issued 9 Mar 2020Violation dismissed 10 Jun 2020Pests§ 27-2017.4

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north, 1st story at east

    Issued 22 Jan 2020Violation dismissed 17 May 2020Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective wood subfloor near radiator at east in the 3rd room from east, 3rd story at west

    Issued 22 Jan 2020Violation dismissed 17 May 2020Heat and hot water§ 27-2005

  • Properly repair with similar material the broken or defective flashing at chimneys at east and west at roof

    Issued 9 Mar 2020Violation closed 16 May 2020Roof and outside the building§ 27-2005

  • Replace with new the missing handrail at stairway from 1st story public hall to cellar

    Issued 9 Mar 2020Violation closed 16 May 2020Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective ceramic floor tiles at vestibule at public hall, 1st story

    Issued 9 Mar 2020Violation closed 16 May 2020Floors and stairs§ 27-2005

  • Properly repair with similar material the broken or defective rolled roofing material at south of roof

    Issued 9 Mar 2020Violation closed 16 May 2020Roof and outside the building§ 27-2005

  • Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the the north yard

    Issued 9 Mar 2020Violation closed 16 May 2020Electrical§ 27-2040

  • Properly repair the broken or defective paving at north yard

    Issued 9 Mar 2020Violation closed 16 May 2020Roof and outside the building§ 27-2005

  • Replace the broken or defective cracked toilet bowl. in the bathroom, 3rd story at south

    Issued 21 Feb 2020Violation closed 18 Mar 2020Leaks and plumbing§ 27-2026

  • Arrange and make self-closing the doors, leading to basement at public hall, 1st story

    Issued 7 Feb 2020Violation closed 18 Mar 2020Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors door at apartment entrance in the entrance, 2nd story at west

    Issued 22 Jan 2020Violation closed 18 Mar 2020Fire and safety equipment§ 27-2005 +1

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east, 3rd story at west

    Issued 22 Jan 2020Violation closed 18 Mar 2020Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east, 3rd story at west

    Issued 22 Jan 2020Violation closed 18 Mar 2020Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom, 3rd story at west

    Issued 22 Jan 2020Violation closed 18 Mar 2020Walls and ceilings§ 27-2013

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at east

    Issued 22 Jan 2020Violation closed 18 Mar 2020Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 1st story at east

    Issued 22 Jan 2020Violation closed 18 Mar 2020Fire and safety equipment§ 27-2046.1

  • Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 1st story

    Issued 22 Jan 2020Violation closed 18 Mar 2020Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all walls, ceilings and trim throughout in the entire apartment, 2nd story at west

    Issued 22 Jan 2020Violation closed 18 Mar 2020Walls and ceilings§ 27-2013

  • Arrange and make self-closing the doors, in the entrance, 3rd story at south

    Issued 15 Dec 2019Violation closed 18 Mar 2020Fire and safety equipment§ 27-2044

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, south wall, west wall, ceiling in the 4th room from east, 1st story at west

    Issued 17 Aug 2019Violation closed 18 Mar 2020Walls and ceilings§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the ceiling, south wall, north wall, east wall in the 1st room from east, 1st story at south

    Issued 8 Jun 2019Violation closed 18 Mar 2020Walls and ceilings§ 27-2013

  • Replace with new the missing balustrades stairs & public halls all stys.

    Issued 7 Feb 1984Violation closed 18 Mar 2020Floors and stairs§ D26-10.01

  • Arrange and make self-closing the doors door at apartment entrance in the entrance, 1st story at east

    Issued 22 Jan 2020Violation closed 9 Mar 2020Fire and safety equipment§ 27-2005 +1

  • Arrange and make self-closing the doors door at roof bulkhead at public hall, 3rd story

    Issued 22 Jan 2020Violation closed 24 Feb 2020Fire and safety equipment§ 27-2005 +1

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at west

    Issued 22 Jan 2020Violation closed 24 Feb 2020Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 3rd story at south

    Issued 15 Dec 2019Violation closed 24 Feb 2020Pests§ 27-2017.4

  • Abate the infestation consisting of roaches in the entire apartment, 3rd story at south

    Issued 15 Dec 2019Violation closed 24 Feb 2020Pests§ 27-2017.4

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment, 1st story at south

    Issued 30 Nov 2019Violation closed 24 Feb 2020Fire and safety equipment§ 27-2043.1

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door from east at south wall, 1st window frame from west at north wall in the 1st room from north, 3rd story at south

    Issued 15 Dec 2019Violation closed 23 Feb 2020Lead paint§ 27-2056.6

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at west

    Issued 22 Jan 2020Violation closed 15 Feb 2020Pests§ 27-2017.4

  • Trace and repair the source and abate the visible mold condition... at ceiling and west wall approxiatemately 20 square feet in the bathroom, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Mold and damp§ 27-2017.3

  • Repair the leaky and/or defective water supply pipe flex hose at water closet in the bathroom, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Leaks and plumbing§ 27-2026

  • Repair the leaky and/or defective water supply pipe at radiator at south wall in the 2nd room from east, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Heat and hot water§ 27-2026

  • Properly repair with similar material the broken or defective wood subfloor under radiator at south wall in the 2nd room from east, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Heat and hot water§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen, 2nd story at west

    Issued 22 Jan 2020Violation closed 13 Feb 2020Leaks and plumbing§ 27-2026

Showing the 100 most recent of 185.

221 violations on record in total, 23 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

23 complaints in three years, 16 of them in the last twelve months.

  • Walls and ceilings4 / 5
  • Noise5 / 5
  • Heat and hot water0 / 4
  • Leaks and plumbing3 / 3
  • Pests2 / 2
  • Electrical0 / 2
  • Mold and damp1 / 1
  • Garbage and cleanliness1 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

1 case, all closed.

  • False Certification Non-Lead

    Opened 12 Dec 2019

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 6 earlier reports
  • 2024No infested units reported (2023 report)
  • 2024No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2022No infested units reported (2020 report)
  • 2021No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    ARON FROMOWTOS

    Public records list ARON FROMOWTOS as the registered managing agent for this address as of 23 Sept 2025. Source: HPD registration.

  • Owner of record

    GATES LIVING LLC

    Public records list GATES LIVING LLC as the owner of record for this address as of 23 Sept 2025. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 13 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There is 1 open mould violation on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  3. There were 2 pest complaints here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  4. This building dates from 1931 and has 3 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 3033360028 · Block 3336, Lot 28 · Building class C2