263 Linden Street, Brooklyn, NY 11237
Built 1931 · 3-story walk-up · 12 apartments
1 immediately hazardous violation open. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 6 | 5 |
| 2023 | 4 | 0 |
| 2024 | 1 | 1 |
| 2025 | 0 | 0 |
| 2026 so far | 0 | 0 |
Plus 82 violations from 1992 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 8
- Garbage and cleanliness 2
- Floors and stairs 2
- Open per apartment
- less than 0.1 (1 open across 12 apartments)
- Inspector last found a problem
- 2 Oct 2024 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 0 | 0 | 0 |
| 2026–27 (so far) | 1 | 1 | 0 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous1 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Abate the infestation consisting of mice in the entire apartment, 2nd story at east
Issued 12 Jan 2021First no access to re- inspect violation 3 Apr 2025Pests§ 27-2017.4
98 closed violations, plus 8 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Abate the infestation consisting of roaches in the entire apartment, 3rd story at north
Issued 27 Nov 2021Violation closed 3 Aug 2026Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 3rd story at east
Issued 15 Nov 2019Violation closed 3 Aug 2026Pests§ 27-2017.4
Abate the infestation consisting of bedbugs in the entire apartment, 1st story at west
Issued 20 Feb 2024Violation closed 3 Apr 2025Pests§ 27-2017.4
×22011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
2 issued 18 Sept 2023 to 2 Oct 2024Violation closedGarbage and cleanliness§ 27-2010
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story at north
Issued 18 Sept 2023Violation closed 29 Mar 2025Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective in the entire apartment, 1st story at north
Issued 18 Sept 2023Violation closed 29 Mar 2025Fire and safety equipment§ 27-2045
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 1st story at north
Issued 18 Sept 2023Violation closed 29 Mar 2025Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective fire retardant ceiling in boiler room at cellar
Issued 7 Aug 2017Violation closed 29 Mar 2025Heat and hot water§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway, 3rd story at north
Issued 25 Aug 2021Violation closed 27 Apr 2023Leaks and plumbing§ 27-2026
Replace with new the missing covers at garbage receptacles at building front
Issued 7 Jun 2020Violation closed 27 Apr 2023Garbage and cleanliness§ 27-2005
Properly repair the broken or defective lower sash counterbalance at the 1st window from west at north in the 1st room from north, 3rd story at east
Issued 12 Jan 2022Violation dismissed 10 Jul 2022Doors and windows§ 27-2005
Properly repair with similar material the broken or defective wood floor in the private hallway, 3rd story at east
Issued 12 Jan 2022Violation dismissed 10 Jul 2022Floors and stairs§ 27-2005
Paint with light colored paint to the satisfaction of this department the east wall, west wall, and ceiling in the private hallway, 3rd story at east
Issued 12 Jan 2022Violation dismissed 10 Jul 2022Walls and ceilings§ 27-2013
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom, 3rd story at east
Issued 12 Jan 2022Violation dismissed 10 Jul 2022§ 27-2026
Paint with light colored paint to the satisfaction of this department east wall in the private hallway, 3rd story at east
Issued 7 Jan 2022Violation dismissed 30 Jun 2022Walls and ceilings§ 27-2013
Repair or replace the carbon monoxide detecting device(s)., missing, 3rd story at east
Issued 12 Jan 2022Violation dismissed 11 May 2022Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector, missing, 3rd story at east
Issued 12 Jan 2022Violation dismissed 11 May 2022Fire and safety equipment§ 27-2045
Abate the nuisance consisting of bed obstructing window landing to fire escape in the 1st private hallway from north, 3rd story at east
Issued 7 Jan 2022Violation dismissed 28 Apr 2022Fire and safety equipment§ 27-2005 +1
Repair or replace the carbon monoxide detecting device(s). missing in the 1st private hallway from north, 3rd story at east
Issued 7 Jan 2022Violation dismissed 28 Apr 2022Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector missing in the 1st private hallway from north, 3rd story at east
Issued 7 Jan 2022Violation dismissed 28 Apr 2022Fire and safety equipment§ 27-2045
Arrange and make self-closing the doors building entrance at public hall, 1st story
Issued 3 Jan 2022Violation dismissed 10 Apr 2022Fire and safety equipment§ 27-2005
Replace with new the missing basebord radiator cover at east wall in the bathroom, 3rd story at north
Issued 27 Nov 2021Violation dismissed 29 Mar 2022Heat and hot water§ 27-2005
Replace with new the missing basebord radiator cover at east wall in the 1st room from east, 3rd story at north
Issued 27 Nov 2021Violation dismissed 29 Mar 2022Heat and hot water§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallway, 3rd story at north
Issued 27 Nov 2021Violation dismissed 22 Mar 2022Walls and ceilings§ 27-2005
Repair or replace the smoke detector missing in the entire apartment, 3rd story at north
Issued 27 Nov 2021Violation dismissed 22 Mar 2022Fire and safety equipment§ 27-2045
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Issued 25 Aug 2021Violation dismissed 15 Feb 2022Walls and ceilings§ 27-2013
Properly repair with similar material the broken or defective fire retardent material at public hall, 3rd story
Issued 25 Aug 2021Violation dismissed 29 Dec 2021§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Issued 25 Aug 2021Violation dismissed 29 Dec 2021Leaks and plumbing§ 27-2026
Abate the nuisance consisting of key operated lock on outside of bulkhead door at public hall, 3rd story
Issued 12 Jan 2021Violation dismissed 20 May 2021Doors and windows§ 27-2005 +1
Provide approved wire screens above and below skylight at public hall, 3rd story
Issued 12 Jan 2021Violation dismissed 20 May 2021Roof and outside the building§ 27-2005
Abate the nuisance consisting of air conditioner unit in window used to access fire escape in the 4th room from north, 3rd story at west
Issued 12 Jan 2021Violation dismissed 16 May 2021Fire and safety equipment§ 27-2005 +1
Abate the nuisance consisting of cable wires obstructing egress at roof
Issued 12 Jan 2021Violation will be reinspected 16 May 2021Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors at north wall leading to cellar at public hall, 1st story
Issued 12 Jan 2021Violation dismissed 21 Apr 2021Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors at boiler room at cellar
Issued 12 Jan 2021Violation will be reinspected 12 Apr 2021Fire and safety equipment§ 27-2005 +1
Arrange and make self-closing the doors to roof at bulkhead
Issued 7 Jun 2020Violation closed 3 Mar 2021Fire and safety equipment§ 27-2005 +1
Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 3rd story
Issued 4 Oct 2020Violation closed 14 Jan 2021Walls and ceilings§ 27-2013
×2Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
2 issued 15 Nov 2019 to 6 Aug 2020Violation closedWalls and ceilings§ 27-2013
Repair the roof so that it will not leak at ceiling in the 4th room from north, 3rd story at west
Issued 7 Jun 2020Violation closed 14 Jan 2021Leaks and plumbing§ 27-2005
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 3rd story
Issued 7 Jun 2020Violation closed 14 Jan 2021Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from north, 3rd story at west
Issued 7 Jun 2020Violation closed 14 Jan 2021Walls and ceilings§ 27-2005
Repair the roof so that it will not leak at ceiling in the private hallway, 3rd story at east
Issued 15 Nov 2019Violation closed 14 Jan 2021Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the recess at 2nd window from east at south in the 5th room from north at east, 3rd story at east
Issued 15 Nov 2019Violation closed 14 Jan 2021Doors and windows§ 27-2005
×2Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
2 issued 15 Nov 2019 to 6 Aug 2020Violation closedWalls and ceilings§ 27-2005
×2Repair the roof so that it will not leak at ceiling at public hall, 3rd story
2 issued 15 Nov 2019 to 7 Jun 2020Violation closedLeaks and plumbing§ 27-2005
Repair the roof so that it will not leak at recess of 2nd window from east at south in the 5th room from north at east, 3rd story at east
Issued 15 Nov 2019Violation closed 14 Jan 2021Leaks and plumbing§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway, 3rd story at east
Issued 15 Nov 2019Violation closed 14 Jan 2021Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). inoperative, 2nd story
Issued 18 Jan 2017Violation closed 14 Jan 2021Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector inoperative, 2nd story
Issued 18 Jan 2017Violation closed 14 Jan 2021Fire and safety equipment§ 27-2045
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 2nd story at north
Issued 15 Feb 2016Violation closed 14 Jan 2021Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective, 2nd story at north
Issued 15 Feb 2016Violation closed 14 Jan 2021Fire and safety equipment§ 27-2045
Abate the nuisance consisting of key operated lock, at room door leading to fire escape, 3rd story at west
Issued 12 Mar 2013Violation closed 14 Jan 2021Fire and safety equipment§ 27-2005 +1
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Issued 6 Aug 2020Violation will be reinspected 10 Jan 2021Leaks and plumbing§ 27-2005
Arrange and make self-closing the doors to roof at bulkhead
Issued 6 Aug 2020Violation will be reinspected 10 Jan 2021Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 3rd story
Issued 7 Jun 2020Violation closed 27 Aug 2020Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 2nd story at north
Issued 3 Jan 2018Violation dismissed 22 Apr 2018Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective in the entire apartment, 2nd story at north
Issued 3 Jan 2018Violation dismissed 22 Apr 2018Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 1st story
Issued 3 Jan 2018Violation dismissed 28 Mar 2018Fire and safety equipment§ 27-2046.1
Repair or replace the smoke detector defective in the entire apartment, 1st story
Issued 3 Jan 2018Violation dismissed 28 Mar 2018Fire and safety equipment§ 27-2045
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at south
Issued 3 Jan 2018Violation dismissed 21 Mar 2018Heat and hot water§ 27-2029
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at north
Issued 3 Jan 2018Violation dismissed 21 Mar 2018Heat and hot water§ 27-2029
Properly repair the broken or defective radiator at west wall in the 5th room from east, 1st story
Issued 3 Jan 2018Violation dismissed 21 Mar 2018Heat and hot water§ 27-2005
Properly repair the broken or defective radiator at south wall in the 4th room from east, 1st story
Issued 3 Jan 2018Violation dismissed 21 Mar 2018Heat and hot water§ 27-2005
Provide ready access to buildings heating system locked door to boiler. at public hall, 1st story
Issued 3 Jan 2018Violation dismissed 21 Mar 2018Heat and hot water§ 27-2033
Abate the nuisance consisting of lock on room door with window to fire escape, 3rd story
Issued 7 Aug 2017Violation closed 26 Oct 2017Fire and safety equipment§ 27-2005 +1
Provide hot water at all hot water fixtures, 2nd story at north
Issued 15 Feb 2016Violation closed 17 Oct 2017Heat and hot water§ 27-2031
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at east
Issued 28 Jan 2017Violation dismissed 19 Sept 2017Heat and hot water§ 27-2029
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story
Issued 18 Jan 2017Violation dismissed 19 Sept 2017Heat and hot water§ 27-2029
Provide ready access to buildings heating system door locked at cellar
Issued 28 Jan 2017Violation closed 7 Aug 2017Heat and hot water§ 27-2033
Provide ready access to buildings heating system boiler room door locked at basement
Issued 18 Jan 2017Violation closed 7 Aug 2017Heat and hot water§ 27-2033
Provide ready access to buildings heating system door locked at public hall, 1st story
Issued 15 Feb 2016Violation closed 7 Aug 2017Heat and hot water§ 27-2033
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, the private hallway, the kitchenette, the 5th room from east, the 1st room from east at south, 1st story at south
Issued 16 Jul 2014Violation closed 7 Aug 2017Walls and ceilings§ 27-2013
Properly repair the broken or defective cabinet under sink in the kitchenette, 1st story at south
Issued 16 Jul 2014Violation closed 7 Aug 2017Leaks and plumbing§ 27-2005
Remove all encumbrances consisting of television and other household items at public hall, 3rd story
Issued 31 Mar 2014Violation closed 7 Aug 2017Fire and safety equipment§ 27-2005 +1
Properly repair the broken or defective -- lock on door street entrance to building
Issued 23 Jan 2013Violation closed 7 Aug 2017Doors and windows§ 27-2005
Refit closet doors. in the 1st bedroom from north, 3rd story
Issued 11 Jul 2001Violation closed 7 Aug 2017Doors and windows§ 27-2005
Abate the nuisance consisting of 150 degrees of scalding hot water-exceeding the maximum temperature of 130 degrees in the entire apartment, 2nd story at east
Issued 28 Jan 2017Violation closed 15 Feb 2017Heat and hot water§ 27-2005 +1
Provide an adequate supply of heat for the apartment, 2nd story at north
Issued 15 Feb 2016Violation dismissed 26 Sept 2016Heat and hot water§ 27-2029
Remove all encumbrances consisting of bicycles tied to the balustrade at third story public hall stairs to roof bulkhead, 3rd story
Issued 31 Mar 2014Violation closed 16 Apr 2014Fire and safety equipment§ 27-2005 +1
Properly secure the loose wash basin to wall in the bathroom, 3rd story at west
Issued 12 Mar 2013Violation closed 7 Apr 2014Walls and ceilings§ 27-2005
Trace and repair the source and abate the nuisance consisting of mold... and mildew at ceiling and west wall in the bathroom, 3rd story at west
Issued 12 Mar 2013Violation closed 7 Apr 2014Mold and damp§ 27-2005
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the 5th room from north, the 4th room from north at west, the bathroom, the private hallway, 3rd story at west
Issued 5 Jul 2012Violation closed 7 Apr 2014Walls and ceilings§ 27-2013
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north, 3rd story at west
Issued 5 Jul 2012Violation closed 7 Apr 2014Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north, 3rd story at west
Issued 22 Apr 2012Violation closed 7 Apr 2014Walls and ceilings§ 27-2013
Properly repair the broken or defective mail box at lobby
Issued 14 Aug 2013Violation closed 31 Mar 2014§ 27-2005
Properly repair the broken or defective building entrance door lock at lobby, 1st story
Issued 17 Jan 2013Violation closed 31 Mar 2014Doors and windows§ 27-2005
Provide ready access to buildings heating system cellar door locked
Issued 22 Feb 1992Violation closed 31 Mar 2014Heat and hot water§ 27-2033
Provide ready access to buildings heating system door locked at public hall, 1st story
Issued 16 Dec 2013Violation dismissed 11 Mar 2014Heat and hot water§ 27-2033
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story
Issued 16 Dec 2013Violation dismissed 10 Mar 2014Heat and hot water§ 27-2029
Properly repair the broken or defective lock at mail box in the vestibule, 1st story
Issued 16 Sept 2013Violation closed 6 Mar 2014§ 27-2005
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations. at public hall, 1st story
Issued 31 Aug 2013Violation dismissed 3 Mar 2014§ 27-2047
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 1st story at south
Issued 8 Jan 2014Violation closed 27 Feb 2014Heat and hot water§ 27-2028 +1
Abate the nuisance consisting of scalding hot water in the entire apartment, 1st story at south
Issued 8 Jan 2014Violation closed 24 Jan 2014Heat and hot water§ 27-2005 +1
Refit door in the bathroom, 3rd story
Issued 17 Jan 2013Violation closed 21 Apr 2013Doors and windows§ 27-2005
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment, 3rd story at west
Issued 1 Sept 2012Violation closed 11 Oct 2012Fire and safety equipment§ 27-2043.1
107 violations on record in total, 1 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
16 complaints in three years, 2 of them in the last twelve months.
- Pests1 / 5
- Heat and hot water1 / 4
- Leaks and plumbing0 / 2
- Garbage and cleanliness0 / 2
- Mold and damp0 / 1
- Fire and safety equipment0 / 1
- Walls and ceilings0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
5 cases, all closed.
Tenant Action
Opened 30 Dec 2021
Heat and Hot Water
Opened 2 Feb 2018
Heat and Hot Water
Opened 22 Mar 2017
Heat and Hot Water
Opened 6 Apr 2016
Heat and Hot Water
Opened 14 Apr 2014
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 3 earlier reportsShow fewer
- 2025No infested units reported (2023 report)
- 2021No infested units reported (2019 report)
- 2019No infested units reported (2017 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
YON LEF
Public records list YON LEF as the registered managing agent for this address as of 19 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (1 in the records we hold)
- 255 Linden Street11 open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
LINDEN OWNER LLC
Public records list LINDEN OWNER LLC as the owner of record for this address as of 19 Sept 2026. Source: HPD registration.
Other buildings listed under this owner (1 in the records we hold)
- 255 Linden Street11 open violations · no reviews yet
No combined rating for this owner yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
263 Linden Street, Brooklyn, NY 11237
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has one open immediately-hazardous violation on this building. Ask which apartment it concerns, whether it has been corrected, and when HPD re-inspects.
- The city recorded 1 mould violation here, most recently in 2013, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- There was 1 pest complaint here in the last twelve months. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 1 open housing violation: 1 immediately hazardous, 0 hazardous and 0 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (8), garbage and cleanliness (2) and floors and stairs (2).
On 2 Oct 2024. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
No heat or hot-water complaints or violations were recorded here in the 2025–26 heat season.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 3033260062 · Block 3326, Lot 62 · Building class C1
