203 Wyckoff Avenue, Brooklyn, NY 11237
Built 1931 · 3-story walk-up · 6 apartments
4 immediately hazardous violations open. 29 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 294 · 20 · 5
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 19 | 0 |
| 2023 | 30 | 3 |
| 2024 | 1 | 0 |
| 2025 | 37 | 6 |
| 2026 so far | 31 | 0 |
Plus 279 violations from 2010 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 27
- Walls and ceilings 26
- Heat and hot water 18
- Open per apartment
- 4.8 (29 open across 6 apartments)
- Inspector last found a problem
- 20 Sept 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 11 days, and inspectors issued 14 violations.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 11 | 19 | 14 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous4 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at north
Issued 16 Jan 2026Invalid certification 27 Jan 2026Heat and hot water§ 27-2029
Provide hot water at all hot water fixtures in the entire apartment, 3rd story at north
Issued 16 Jan 2026Invalid certification 27 Jan 2026Heat and hot water§ 27-2031
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing information on sign at public hall, 1st story
Issued 2 Dec 2025Notice sent out 3 Dec 2025Heat and hot water§ 27-2033
Properly repair with similar material the broken or defective wooden cornice at roof
Issued 30 Jun 2025Not complied with 25 Nov 2025Roof and outside the building§ 27-2005
Hazardous20 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Properly repair with similar material the broken or defective wood floor in the kitchen, 2nd story at east
Issued 20 Sept 2026Notice sent out 20 Sept 2026Floors and stairs§ 27-2005
Properly repair or replace the broken or defective latch set at door in the entrance, 2nd story at east
Issued 20 Sept 2026Notice sent out 20 Sept 2026Doors and windows§ 27-2005
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective, 2nd story at east
Issued 20 Sept 2026Notice sent out 20 Sept 2026Fire and safety equipment§ 27-2045 +2
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective, 2nd story at east
Issued 20 Sept 2026Notice sent out 20 Sept 2026Fire and safety equipment§ 27-2045 +3
Properly repair and abate unsafe electric wiring condition consisting of expose wire at south wall at cellar
Issued 20 Aug 2026Notice certified on time 16 Sept 2026Electrical§ 27-2005
×2Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east, 2nd story at south
2 issued 20 Aug 2026Civ14 mailedLeaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east, 2nd story at south
Issued 20 Aug 2026Civ14 mailed 20 Sept 2026Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective skylight at ceiling, 3rd story
Issued 17 Jul 2026Notice sent out 19 Jul 2026Roof and outside the building§ 27-2005
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment, 3rd story at north
Issued 31 Dec 2025Notice sent out 4 Jan 2026Fire and safety equipment§ 27-2045 +3
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment, 3rd story at north
Issued 31 Dec 2025Notice sent out 4 Jan 2026Fire and safety equipment§ 27-2045 +2
Show all 20Show fewer
Properly secure the loose cabinet at north wall in the kitchen, 3rd story at north
Issued 3 Oct 2025Not complied with 25 Nov 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north and east walls in the bathroom, 3rd story at north original violation 18272243 issued 03-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Issued 3 Oct 2025Invalid certification 22 Mar 2026Mold and damp§ 27-2017.3
×2Repair the broken or defective connection waste line at washbasin in the bathroom, 3rd story at north
2 issued 23 Jun 2025 to 3 Oct 2025Not complied withLeaks and plumbing§ 27-2026
Remove all encumbrances consisting of furniture and household items at public hall, 3rd story
Issued 23 Jun 2025Not complied with 25 Nov 2025Fire and safety equipment§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 27-2005
Properly secure the loose north wall wood cabinets in the kitchen, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective washbasin cabinet in the bathroom, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 27-2005
Trace and repair the source and abate the visible mold condition... at east wall window reses in the bathroom, 3rd story at north original violation 16222441 issued 13-sep-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Issued 13 Sept 2023Not complied with 25 Nov 2025Mold and damp§ 27-2017.3
Non-hazardous5 open
Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling tiles in the 2nd room from east, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 300
Cleanse to the satisfaction of this department the grout and mortar joints at bathtub perimeter in the bathroom, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Leaks and plumbing§ 27-2011
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling tiles in the 4th room from east, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 300
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling tiles in the 3rd room from east, 3rd story at north
Issued 23 Jun 2025Not complied with 25 Nov 2025Walls and ceilings§ 300
Paint metal in accordance with dept. regulation, at cornice
Issued 14 Dec 2013Not complied with 25 Nov 2025Walls and ceilings§ 27-2005
Paperwork and notices1 open
The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Issued 20 Aug 2026Notice sent out 20 Aug 2026Paperwork and notices§ 27-2104
379 closed violations, plus 12 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
×2Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom, 3rd story at north
2 issued 3 Oct 2025 to 24 Nov 2025Violation closedFloors and stairs§ 27-2005
Replace or repair the self-closing the doors that is missing or defective latch at building entrance door, 1st story
Issued 20 Aug 2026Violation closed 20 Sept 2026Fire and safety equipment§ 27-2044 +3
Properly repair with similar material the broken or defective wooden cornice at roof at building front
Issued 25 Nov 2025Violation closed 2 Sept 2026Roof and outside the building§ 27-2005
Repair the roof so that it will not leak at ceiling in the kitchen, 3rd story at north
Issued 25 Nov 2025Violation closed 8 Jul 2026Leaks and plumbing§ 27-2005
Replace or repair the self-closing doors that is missing or defective latch set in the entrance, 3rd story at north
Issued 16 Jan 2026Violation closed 15 Jun 2026Fire and safety equipment§ 27-2005 +3
Properly repair or replace the broken or defective mortise lock at door in the entrance, 3rd story at north
Issued 16 Jan 2026Violation closed 15 Jun 2026Doors and windows§ 27-2005
Replace or repair the self-closing doors that is missing or defective hinges at door leading to rear yard in the 1st room from east at north, 1st story at north
Issued 1 Mar 2026Violation dismissed 2 Jun 2026Fire and safety equipment§ 27-2005 +3
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceiling in the 4th room from east, 1st story at south
Issued 16 Jan 2026Violation dismissed 19 May 2026Electrical§ 27-2037
Provide adequate light of not less than 60 watts incandescent or equivalent illumination light fixture, at south wall at public hall, 3rd story
Issued 16 Jan 2026Violation dismissed 19 May 2026Electrical§ 27-2039
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture, at public hall, 2nd story
Issued 16 Jan 2026Violation dismissed 19 May 2026Electrical§ 27-2039
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment, 1st story at south
Issued 16 Jan 2026Violation dismissed 19 May 2026Fire and safety equipment§ 27-2045 +2
Provide a safe and adequate supply of electric service to the fixtures east wall, at range in the kitchen, 1st story at south
Issued 16 Jan 2026Violation dismissed 19 May 2026Appliances§ 27-2037
Properly repair or replace the broken or defective upper cabinet at north wall in the kitchen, 3rd story at north
Issued 16 Jan 2026Violation dismissed 19 May 2026Walls and ceilings§ 27-2005
Repair the roof so that it will not leak above ceiling in the kitchen, 3rd story at north
Issued 16 Jan 2026Violation dismissed 19 May 2026Leaks and plumbing§ 27-2005
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment, 1st story at south
Issued 16 Jan 2026Violation dismissed 19 May 2026Fire and safety equipment§ 27-2045 +3
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen, 3rd story at north
Issued 16 Jan 2026Violation dismissed 19 May 2026Walls and ceilings§ 27-2005
×2Properly repair or replace the broken or defective light fixture at ceiling at public hall, 2nd story
2 issued 31 Dec 2025 to 5 Jan 2026Violation dismissedWalls and ceilings§ 27-2005
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment, 3rd story at north
Issued 31 Dec 2025Violation dismissed 29 Mar 2026Electrical§ 27-2037
Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at north
Issued 1 Mar 2026Violation closed 24 Mar 2026Heat and hot water§ 27-2029
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 1st story at south
Issued 31 Dec 2025Violation dismissed 19 Mar 2026Heat and hot water§ 27-2028 +1
Replace or repair the self-closing the doors that is missing or defective hinges at door to rear yard in the 1st room from east, 1st story at south
Issued 31 Dec 2025Violation dismissed 19 Mar 2026Fire and safety equipment§ 27-2044 +3
Replace or repair the self-closing the doors that is missing or defective hinges in the entrance, 1st story at south
Issued 31 Dec 2025Violation dismissed 19 Mar 2026Fire and safety equipment§ 27-2044 +3
Provide hot water at all hot water fixtures in the entire apartment, 1st story at south
Issued 31 Dec 2025Violation dismissed 19 Mar 2026Heat and hot water§ 27-2031
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment, 1st story at south
Issued 31 Dec 2025Violation dismissed 19 Mar 2026Electrical§ 27-2037
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 3rd story at west
Issued 30 Dec 2025Violation dismissed 19 Mar 2026Heat and hot water§ 27-2028 +1
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 2nd story
Issued 30 Dec 2025Violation dismissed 19 Mar 2026Electrical§ 27-2037
Remove all encumbrances consisting of household items at public hall, 2nd story
Issued 2 Dec 2025Violation dismissed 19 Mar 2026Fire and safety equipment§ 27-2005 +1
Properly repair or replace the broken or defective ceramic floor tiles in the bathroom, 3rd story at north
Issued 23 Jun 2025Violation closed 15 Mar 2026Floors and stairs§ 27-2005
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings in the entire apartment, 2nd story at south
Issued 16 Jan 2026Violation closed 12 Feb 2026Electrical§ 27-2037
Provide hot water at all hot water fixtures in the entire apartment, 2nd story at south
Issued 16 Jan 2026Violation closed 8 Feb 2026Heat and hot water§ 27-2031
Provide hot water at all hot water fixtures in the entire apartment, 1st story at south
Issued 16 Jan 2026Violation closed 8 Feb 2026Heat and hot water§ 27-2031
Provide an adequate supply of heat for the apartment in the entire apartment, 1st story at south
Issued 16 Jan 2026Violation closed 8 Feb 2026Heat and hot water§ 27-2029
Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at south
Issued 16 Jan 2026Violation closed 8 Feb 2026Heat and hot water§ 27-2029
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north and east walls in the bathroom, 3rd story at north
Issued 3 Oct 2025Violation closed 2 Feb 2026Mold and damp§ 27-2017.3
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 3rd story at north
Issued 31 Dec 2025Violation closed 25 Jan 2026Heat and hot water§ 27-2028 +1
Provide hot water at all hot water fixtures in the entire apartment, 3rd story at north
Issued 31 Dec 2025Violation closed 25 Jan 2026Heat and hot water§ 27-2031
Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west
Issued 30 Dec 2025Violation closed 22 Jan 2026Heat and hot water§ 27-2031
Abate the nuisance consisting of wall erected creating obstruction to egress window in the 4th room from north, 2nd story at east
Issued 13 Dec 2023Violation closed 2 Dec 2025Fire and safety equipment§ 27-2005 +1
Remove all encumbrances consisting of household items and construction materials at public hall, 1st story
Issued 23 Jun 2025Violation closed 25 Nov 2025Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective metal cornice at roof at building front
Issued 13 Dec 2023Violation closed 25 Nov 2025Roof and outside the building§ 27-2005
Replace with new the missing wire screen under skylite at public hall, 3rd story
Issued 24 Oct 2010Violation closed 25 Nov 2025§ 27-2005
Repair the broken or defective connection at sink waste line. in the kitchen, 2nd story at south
Issued 30 Jun 2025Violation dismissed 28 Sept 2025Leaks and plumbing§ 27-2026
Properly repair or replace the broken or defective knob at room entrance door in the 4th room from east, 2nd story at south
Issued 30 Jun 2025Violation dismissed 28 Sept 2025Doors and windows§ 27-2005
Properly repair with similar material the broken or defective vinyl tiles at floor in the private hallway, 2nd story at south
Issued 30 Jun 2025Violation dismissed 28 Sept 2025Floors and stairs§ 27-2005
Properly repair or replace the broken or defective knob at closet door in the 4th room from east, 2nd story at south
Issued 30 Jun 2025Violation dismissed 28 Sept 2025Doors and windows§ 27-2005
Replace or repair the self-closing the doors that is missing or defective door frame at building front entrance, 1st story
Issued 30 Jun 2025Violation closed 23 Sept 2025Fire and safety equipment§ 27-2044 +3
Replace or repair the self-closing the doors that is missing or defective latch set at building entrance door at public hall, 1st story
Issued 23 Jun 2025Violation closed 23 Sept 2025Fire and safety equipment§ 27-2044 +3
Replace with new the missing lower glass or metal pane from building entrance door from the street at public hall
Issued 12 May 2025Violation closed 25 Jun 2025Doors and windows§ 27-2005
Paint with light colored paint to the satisfaction of this department all walls at sky light at public hall, 3rd story
Issued 13 Sept 2023Violation closed 25 Jun 2025Walls and ceilings§ 27-2013
Replace or repair the self-closing doors that is missing or defective that leads to cellar at public hall, 1st story
Issued 3 Nov 2022Violation closed 25 Jun 2025Fire and safety equipment§ 27-2005 +2
Paint with light colored paint to the satisfaction of this department the cornice at front of the building
Issued 8 Dec 2021Violation dismissed 25 Jun 2025Walls and ceilings§ 27-2013
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheet rock and studs partition wall creating room in the 3rd room from east, 3rd story at north
Issued 8 Mar 2019Violation closed 25 Jun 2025Walls and ceilings§ 300
Properly repair with similar material the broken or defective wood floor in the 1st room from north, 1st story at east
Issued 13 Dec 2023Violation closed 6 Jan 2025Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective wood floor in the 3rd room from north, 1st story at east
Issued 13 Dec 2023Violation closed 6 Jan 2025Floors and stairs§ 27-2005
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment in the bathroom, 1st story at south
Issued 30 Apr 2024Violation dismissed 21 Jul 2024Heat and hot water§ 27-2005 +1
Replace or repair the self-closing doors that is missing or defective hinges at hot water tank room at cellar
Issued 13 Dec 2023Violation closed 26 May 2024Fire and safety equipment§ 27-2005 +3
Replace with new the missing 200 sq ft fire retardant material at ceiling at cellar
Issued 13 Dec 2023Violation closed 26 May 2024Walls and ceilings§ 27-2005
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at cellar
Issued 13 Dec 2023Violation closed 3 May 2024Electrical§ 27-2005
Properly secure the loose 18th, 19th, 20th and 21 balustrades from bottom up at public hall stairs, 2nd story
Issued 13 Dec 2023Violation closed 2 May 2024Floors and stairs§ 27-2005
Repair the broken or defective connection at waste line pipe at ceiling at cellar
Issued 13 Dec 2023Violation closed 2 May 2024Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective wood sub-floor in the private hallway, 2nd story at east
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Floors and stairs§ 27-2005
Properly repair with similar material the broken or defective metal tin ceiling in the 1st room from north, 2nd story at east
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at west, 2nd story at east
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Walls and ceilings§ 27-2005
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 3rd story
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Walls and ceilings§ 27-2013
Remove all encumbrances consisting of construction material at public hall, 3rd story
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Fire and safety equipment§ 27-2005 +1
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 3rd story
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from north at west, 2nd story at east
Issued 13 Dec 2023Violation dismissed 10 Apr 2024Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective vinyl floof covering in the private hallway, 2nd story at east
Issued 13 Dec 2023Violation dismissed 10 Apr 2024§ 27-2005
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at east
Issued 13 Dec 2023Violation dismissed 14 Mar 2024Fire and safety equipment§ 27-2005 +3
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen, 1st story at east
Issued 13 Dec 2023Violation closed 20 Feb 2024Walls and ceilings§ 27-2005
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at north wall in cabinet in the kitchen, 1st story at east
Issued 13 Dec 2023Violation closed 20 Feb 2024Electrical§ 27-2005
Properly repair with similar material the broken or defective metal tin ceiling in the 1st room from north, 1st story at east
Issued 13 Dec 2023Violation closed 20 Feb 2024Walls and ceilings§ 27-2005
Replace or repair the self-closing doors that is missing or defective vistbule door at public hall, 1st story
Issued 13 Sept 2023Violation closed 21 Jan 2024Fire and safety equipment§ 27-2005 +3
Trace and repair the source and abate the visible mold condition... at east wall window reses in the bathroom, 3rd story at north
Issued 13 Sept 2023Violation closed 18 Jan 2024Mold and damp§ 27-2017.3
Properly repair with similar material the broken or defective fire retardan matrial at west wall at sky light at public hall, 3rd story
Issued 13 Sept 2023Violation dismissed 10 Dec 2023Walls and ceilings§ 27-2005
Properly secure the loose scuttle ladder at public hall, 3rd story
Issued 13 Sept 2023Violation dismissed 10 Dec 2023§ 27-2005
Provide wire screen at sky light at public hall, 3rd story
Issued 13 Sept 2023Violation dismissed 10 Dec 2023§ 27-2005
Properly repair or replace the broken or defective lock at entrance door in the entrance, 3rd story at north
Issued 13 Sept 2023Violation dismissed 10 Dec 2023Doors and windows§ 27-2005
Abate the nuisance consisting of trash cans obstructing drop ladder from safe landing at building front at fire escape
Issued 13 Sept 2023Violation dismissed 10 Dec 2023Fire and safety equipment§ 27-2005 +1
Remove all encumbrances consisting of household items at public hall, 3rd story
Issued 13 Sept 2023Violation dismissed 10 Dec 2023Fire and safety equipment§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color all ceiling and all walls in the entire apartment, 3rd story at north
Issued 13 Sept 2023Violation dismissed 10 Dec 2023Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective scuttle cover
Issued 12 Sept 2023Violation dismissed 10 Dec 2023§ 27-2005
Replace or repair the self-closing doors that is missing or defective in the entrance, 1st story at west
Issued 3 Nov 2022Violation closed 19 Apr 2023Fire and safety equipment§ 27-2005 +2
Properly repair the broken or defective intercom system in the entrance, 3rd story at west
Issued 18 Aug 2021Violation closed 25 Jul 2022Entry, buzzer and mail§ 27-2005
Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment, 3rd story
Issued 27 Sept 2010Violation closed 25 Jul 2022Walls and ceilings§ 27-2013
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Issued 31 Jan 2022Violation dismissed 20 Mar 2022§ 27-2153
Provide adequate light of not less than 60 watts incandescent or equivalent illumination in the vestibule at north wall at public hall, 1st story
Issued 9 Mar 2022Violation closed 15 Mar 2022Electrical§ 27-2039
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Issued 9 Mar 2022Violation closed 15 Mar 2022Heat and hot water§ 27-2033
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom, 3rd story at north
Issued 9 Mar 2022Violation closed 15 Mar 2022Walls and ceilings§ 27-2005
Arrange and make self-closing the doors at vestibule at public hall, 1st story
Issued 9 Mar 2022Violation closed 15 Mar 2022Fire and safety equipment§ 27-2005
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Issued 4 Mar 2022Violation closed 15 Mar 2022Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling at cellar
Issued 4 Mar 2022Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026
Remove all obstructions and repair all defects in house trap at cellar
Issued 15 Feb 2022Violation closed 15 Mar 2022§ 27-2026
Abate the nuisance consisting of fresh air intake pipe seal at front yard
Issued 15 Feb 2022Violation closed 15 Mar 2022Roof and outside the building§ 27-2005 +1
Properly repair the broken or defective gas supply line to fired heat burner at cellar
Issued 13 Dec 2021Violation closed 15 Mar 2022Cooking gas§ 27-2005
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Issued 15 Oct 2021Violation closed 15 Mar 2022Garbage and cleanliness§ 27-2021
Repair the broken or defective plastered surfaces and paint in a uniform color approx 6 sq ft at the east wall in the 3rd room from north, 3rd story at west
Issued 18 Aug 2021Violation closed 15 Mar 2022Walls and ceilings§ 27-2005
Repair the leaky and/or defective faucets at the wash basin in the bathroom, 3rd story at west
Issued 18 Aug 2021Violation closed 15 Mar 2022Leaks and plumbing§ 27-2026
Showing the 100 most recent of 379.
421 violations on record in total, 30 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
85 complaints in three years, 57 of them in the last twelve months.
- Heat and hot water18 / 20
- Leaks and plumbing9 / 15
- Fire and safety equipment8 / 13
- Electrical10 / 11
- Appliances6 / 7
- Doors and windows3 / 6
- Floors and stairs1 / 4
- Construction and illegal work0 / 3
- Mold and damp0 / 2
- Walls and ceilings1 / 2
- Roof and outside the building1 / 1
- Pests0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case pending, 3 closed.
Heat and Hot WaterPending
Opened 18 May 2026
Tenant Action/Harassment
Opened 29 Aug 2019No harassment found
False Certification Non-Lead
Opened 14 Dec 2017
Comprehensive
Opened 6 Feb 2017
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No permit currently in force. 2 permits filed in the last five years.
Show 2 expired or finishedShow fewer
General Construction
INTERIOR RENOVATION TO SIX (6) DWELLING UNITS , WITH NEW PARTITION WORK THROUGHOUT.
Issued 1 Sept 2023Expired 1 Sept 2024
Mechanical Systems
MECHANICAL APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-1 APPLICATION #B08033864-I1.
Issued 1 Sept 2023Expired 1 Sept 2024
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2025No infested units reported (2024 report)
Show 6 earlier reportsShow fewer
- 2025No infested units reported (2023 report)
- 2023No infested units reported (2022 report)
- 2023No infested units reported (2021 report)
- 2022No infested units reported (2020 report)
- 2022No infested units reported (2020 report)
- 20201 of 6 units reported infested, 1 re-infested (2019 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
JOEL LEFKOWITZ
Public records list JOEL LEFKOWITZ as the registered managing agent for this address as of 20 Sept 2026. Source: HPD registration.
Other buildings listed under this agent (4 in the records we hold)
- 871 Hart Street56 open violations · no reviews yet
- 243 Suydam Street6 open violations · no reviews yet
- 1687 Gates Avenue5 open violations · no reviews yet
Show 1 moreShow fewer
- 241 Jefferson Streetno open violations · no reviews yet
No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.
Owner of record
WYCKOFF RESIDENCE LLC
Public records list WYCKOFF RESIDENCE LLC as the owner of record for this address as of 20 Sept 2026. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
203 Wyckoff Avenue, Brooklyn, NY 11237
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 4 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- HPD has 1 case pending against the owner in Housing Court (heat and hot water). Ask what it is about and whether the work has been done.
- There were 18 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
- There are 2 open mould violations on record. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 29 open housing violations: 4 immediately hazardous, 20 hazardous and 5 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (27), walls and ceilings (26) and heat and hot water (18).
On 20 Sept 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 11 days, and HPD issued 14 heat violations.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 3032910007 · Block 3291, Lot 7 · Building class C2
