ByTenantsByTenants home

321 Harman Street, Brooklyn, NY 11237

Built 1931 · 3-story walk-up · 6 apartments

2 immediately hazardous violations open. 3 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
32 · 1
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

Violations issued each year
YearHazardousNon-hazardous
202292
2023255
2024147
2025200
2026 so far00

Plus 240 violations from 1994 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.

See every violation
Found most often since 2022
  • Fire and safety equipment 22
  • Heat and hot water 13
  • Walls and ceilings 13
Open per apartment
0.5 (3 open across 6 apartments)
Inspector last found a problem
16 Dec 2025 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

Last winter (2025–26), the city received heat or hot-water complaints about this building on 2 days.

WinterDaysComplaintsViolations
2025–26220
2026–27 (so far)230

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous2 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Issued 27 Jun 2023Notice sent out 16 Aug 2023Lead paint§ 27-2056.4 +1

  • Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Issued 27 Jun 2023Notice sent out 16 Aug 2023Lead paint§ 27-2056.4

Hazardous1 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at south

    Issued 29 Aug 2023Notice sent out 31 Aug 2023Lead paint§ 27-2056.7 +2

321 closed violations, plus 20 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at south

    Issued 16 Dec 2025Violation closed 5 Mar 2026Fire and safety equipment§ 27-2005 +3

  • Remove all encumbrances consisting of household items at public hall, 3rd story

    Issued 6 Jun 2025Violation dismissed 8 Oct 2025Fire and safety equipment§ 27-2005 +1

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen, 3rd story at south

    Issued 12 May 2025Violation closed 13 Jul 2025Walls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east and west walls in the 1st room from east, 3rd story at south

    Issued 12 May 2025Violation closed 13 Jul 2025Walls and ceilings§ 27-2005

  • Properly secure the loose ceiling light fixture in the 1st room from east, 3rd story at south

    Issued 12 May 2025Violation closed 13 Jul 2025Walls and ceilings§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at east

    Issued 5 Mar 2025Violation dismissed 2 Jul 2025Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective in the entire apartment, 3rd story at east

    Issued 5 Mar 2025Violation dismissed 2 Jul 2025Fire and safety equipment§ 27-2045

  • Replace or repair the self-closing the doors that is missing or defective door at vestibule

    Issued 26 May 2025Violation closed 8 Jun 2025Fire and safety equipment§ 27-2044 +3

  • Replace or repair the self-closing doors that is missing or defective hinges at vestibule at public hall, 1st story

    Issued 12 May 2025Violation closed 8 Jun 2025Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at south

    Issued 12 May 2025Violation closed 8 Jun 2025Fire and safety equipment§ 27-2005 +3

  • ×2Abate the infestation consisting of roaches in the entire apartment, 1st story at west

    2 issued 26 Sept 2021 to 26 Feb 2025Violation closedPests§ 27-2017.4

  • Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment, 1st story at west

    Issued 26 Feb 2025Violation closed 13 Apr 2025Fire and safety equipment§ 27-2046.1

  • Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom, 1st story at west

    Issued 26 Feb 2025Violation closed 13 Apr 2025Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 1st story at west

    Issued 26 Feb 2025Violation closed 13 Apr 2025Fire and safety equipment§ 27-2005 +3

  • ×2Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at west

    2 issued 20 Nov 2024 to 26 Feb 2025Violation closedLeaks and plumbing§ 27-2026

  • Properly repair or replace the broken or defective glass pane at 1st upper sash window from east at north wall in the kitchen, 1st story at west

    Issued 26 Feb 2025Violation closed 13 Apr 2025Doors and windows§ 27-2005

  • Abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees at all hot water fixtures. in the entire apartment, 1st story at south

    Issued 16 Feb 2025Violation closed 13 Apr 2025Heat and hot water§ 27-2005 +1

  • Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at south

    Issued 16 Feb 2025Violation closed 13 Apr 2025Leaks and plumbing§ 27-2026

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east, 1st story at north

    Issued 10 Dec 2024Violation dismissed 13 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 5th room from north, 1st story at west

    Issued 20 Nov 2024Violation closed 13 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at north wall in the kitchen, 1st story at west

    Issued 20 Nov 2024Violation closed 13 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen, 1st story at west

    Issued 20 Nov 2024Violation closed 13 Apr 2025Walls and ceilings§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north, 1st story at west

    Issued 20 Nov 2024Violation closed 13 Apr 2025Leaks and plumbing§ 27-2026

  • Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the bathroom, 1st story at west

    Issued 20 Nov 2024Violation closed 13 Apr 2025Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective door to boiler room at east at public hall, 1st story

    Issued 22 Sept 2023Violation closed 13 Apr 2025Fire and safety equipment§ 27-2005 +3

  • Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 1st room from north, 2nd story at east

    Issued 17 Jan 2025Violation dismissed 2 Apr 2025Heat and hot water§ 27-2028 +1

  • Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment, 1st story at west

    Issued 14 Jan 2025Violation dismissed 1 Apr 2025Heat and hot water§ 27-2028 +1

  • Provide ready access to buildings heating system door leading to boiler room locked at 1st story, public hall at boiler room, 1st story

    Issued 20 Nov 2024Violation dismissed 13 Feb 2025Heat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at west

    Issued 20 Nov 2024Violation dismissed 4 Feb 2025Heat and hot water§ 27-2031

  • Repair or replace the smoke detector missing in the entire apartment, 2nd story at east

    Issued 24 Sept 2024Violation dismissed 9 Jan 2025Fire and safety equipment§ 27-2045

  • Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 2nd story at east

    Issued 24 Sept 2024Violation dismissed 9 Jan 2025Fire and safety equipment§ 27-2046.1

  • Repair the leaky and/or defective faucets at bathtub in the bathroom, 2nd story at east

    Issued 24 Sept 2024Violation dismissed 9 Jan 2025Leaks and plumbing§ 27-2026

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east

    Issued 24 Sept 2024Violation dismissed 17 Dec 2024Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door locked at boiler room

    Issued 24 Sept 2024Violation dismissed 11 Dec 2024Heat and hot water§ 27-2033

  • Properly secure the loose escutcheon plate at steam riser at floor in the kitchen, 2nd story at north

    Issued 3 Apr 2009Violation closed 26 Sept 2024Heat and hot water§ 27-2005

  • Properly repair or replace the broken or defective escutcheon plate around steam riser at ceiling in the bathroom, 1st story at north

    Issued 1 Jun 2024Violation dismissed 28 Aug 2024Heat and hot water§ 27-2005

  • Abate the nuisance consisting of household furniture blocking 2nd egress door leading to public hall. in the 1st room from east, 1st story at north

    Issued 1 Jun 2024Violation dismissed 28 Aug 2024Fire and safety equipment§ 27-2005 +1

  • Provide ready access to buildings heating system door locked. at boiler room

    Issued 1 Jun 2024Violation dismissed 20 Aug 2024Heat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at north

    Issued 1 Jun 2024Violation dismissed 23 Jul 2024Heat and hot water§ 27-2031

  • ×2The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    2 issued 1 Feb 2021 to 31 Jan 2024Violation dismissed§ 27-2153

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six, 1st story at north

    Issued 28 Dec 2022Violation closed 11 May 2024Lead paint§ 27-2056.7 +2

  • ×2Abate the infestation consisting of roaches in the entire apartment, 2nd story at south

    2 issued 20 Sept 2020 to 7 May 2021Violation closedPests§ 27-2017.4

  • Properly repair the source and abate the evidence of a water leak at window header in the 4th room from north, 1st story at west

    Issued 15 Feb 2024Violation closed 8 May 2024Leaks and plumbing§ 27-2026

  • Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 3rd story

    Issued 22 Sept 2023Violation closed 8 May 2024Fire and safety equipment§ 27-2005 +1

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected creating room in the 1st room from north at west, 3rd story at north

    Issued 20 Nov 2019Violation closed 8 May 2024§ 300

  • Remove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling and walls bathroom 2 sty an apartment er1 96024525, section '' ''

    Issued 19 Aug 1996Violation closed 9 Apr 2024Lead paint§ 27-2013

  • Abate the infestation consisting of rodents rats at cellar

    Issued 15 Feb 2024Violation closed 2 Apr 2024Pests§ 27-2017.4

  • ×3Abate the infestation consisting of roaches in the entire apartment, 1st story at north

    3 issued 7 May 2021 to 23 Sept 2022Violation closedPests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at south

    Issued 7 May 2021Violation closed 2 Apr 2024Pests§ 27-2017.4

  • Abate the infestation consisting of mice in the entire apartment, 2nd story at west

    Issued 20 Sept 2019Violation closed 2 Apr 2024Pests§ 27-2017.4

  • Properly repair or replace the broken or defective all the shingles at building north wall facade at near yard

    Issued 29 Feb 2024Violation closed 31 Mar 2024Roof and outside the building§ 27-2005

  • Paint with light colored paint to the satisfaction of this department the south wall at skylight at public hall, 3rd story

    Issued 22 Sept 2023Violation closed 31 Mar 2024Roof and outside the building§ 27-2013

  • Repair or replace the carbon monoxide detecting device(s). in the entire apartment, 1st story at north

    Issued 22 Sept 2023Violation closed 31 Mar 2024Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at north

    Issued 22 Sept 2023Violation closed 31 Mar 2024Fire and safety equipment§ 27-2045

  • Remove all encumbrances consisting of bicycle and household items at public hall, 3rd story

    Issued 22 Sept 2023Violation closed 31 Mar 2024Fire and safety equipment§ 27-2005 +1

  • Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 4th room from east, 1st story at north

    Issued 22 Sept 2023Violation closed 31 Mar 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective fire retardant plaster at south wall at skylight at public hall, 3rd story

    Issued 22 Sept 2023Violation closed 31 Mar 2024Roof and outside the building§ 27-2005

  • Properly repair with similar material the broken or defective fire retardant plaster board at ceiling at cellar

    Issued 16 Aug 2023Violation closed 31 Mar 2024Walls and ceilings§ 27-2005

  • Replace or repair the self-closing doors that is missing or defective at entrance door to boiler room at cellar

    Issued 16 Aug 2023Violation closed 31 Mar 2024Fire and safety equipment§ 27-2005 +3

  • Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at cellar

    Issued 16 Aug 2023Violation closed 31 Mar 2024Electrical§ 27-2005

  • Properly repair the source and abate the evidence of a water leak at south wall, and ceiling in the 4th room from north, 1st story at west

    Issued 7 Jun 2023Violation closed 31 Mar 2024Leaks and plumbing§ 27-2026

  • Properly repair with similar material the broken or defective grout at ceramic tiles floor in the bathroom, 1st story at west

    Issued 25 Mar 2023Violation closed 31 Mar 2024Floors and stairs§ 27-2005

  • Repair or replace the smoke detector defective, in the entire apartment, 1st story at south

    Issued 11 Sept 2022Violation closed 31 Mar 2024Fire and safety equipment§ 27-2045

  • Properly repair with similar material the broken or defective ceramic floor tile in the bathroom, 1st story at south

    Issued 11 Sept 2022Violation closed 31 Mar 2024Floors and stairs§ 27-2005

  • Repair or replace the carbon monoxide detecting device(s). missing, in the entire apartment, 1st story at south

    Issued 11 Sept 2022Violation closed 31 Mar 2024Fire and safety equipment§ 27-2046.1

  • Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Issued 26 Sept 2021Violation closed 31 Mar 2024Garbage and cleanliness§ 27-2021

  • Properly repair the source and abate the evidence of a water leak at window recess in the 3rd room from north, 1st story at west

    Issued 26 Sept 2021Violation closed 31 Mar 2024Leaks and plumbing§ 27-2026

  • Properly repair the broken or defective ceramic tile floor and make level in the bathroom, 1st story at north

    Issued 26 Aug 2021Violation closed 31 Mar 2024Floors and stairs§ 27-2005

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected creating room in the 1st room from north at west, 1st story at north

    Issued 20 Nov 2019Violation closed 31 Mar 2024§ 300

  • Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st window frame from south at west wall in the 5th bathroom from east, 1st story at north

    Issued 28 Sept 2023Violation dismissed 11 Feb 2024Doors and windows§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the south wall in the foyer, 1st story at north

    Issued 28 Sept 2023Violation dismissed 11 Feb 2024Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east, 1st story at north

    Issued 28 Sept 2023Violation dismissed 11 Feb 2024Walls and ceilings§ 27-2013

  • Provide ready access to buildings heating system boiler room door locked at basement

    Issued 15 Nov 2023Violation dismissed 30 Jan 2024Heat and hot water§ 27-2033

  • Provide an adequate supply of heat for the apartment in the entire apartment, 3rd story at east

    Issued 15 Nov 2023Violation dismissed 30 Jan 2024Heat and hot water§ 27-2029

  • File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall errected of sheetrock and studs to created room west of kitchen in the kitchen, 1st story at north

    Issued 22 Sept 2023Violation dismissed 30 Jan 2024Walls and ceilings§ 300

  • ×2Abate the infestation consisting of roaches in the entire apartment, 1st story at north

    2 issued 28 Dec 2022 to 22 Sept 2023Violation dismissedPests§ 27-2017.4

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer, 1st story at north

    Issued 28 Sept 2023Violation closed 8 Nov 2023Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from south at west wall in the 5th bathroom from east, 1st story at north

    Issued 28 Sept 2023Violation closed 8 Nov 2023Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from east, 1st story at north

    Issued 28 Sept 2023Violation closed 8 Nov 2023Lead paint§ 27-2056.6

  • Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment, 3rd story at north

    Issued 29 Aug 2023Violation closed 30 Oct 2023Lead paint§ 27-2056.7 +2

  • Replace or repair the self-closing doors that is missing or defective.. in the entrance, 1st story at west

    Issued 7 Jun 2023Violation closed 16 Oct 2023Fire and safety equipment§ 27-2005 +3

  • Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story

    Issued 16 Aug 2023Violation closed 21 Sept 2023Fire and safety equipment§ 27-2005 +3

  • Properly repair the source and abate the evidence of a water leak at soffit of window frame in the 4th room from north, 1st story at west

    Issued 25 Mar 2023Violation closed 26 Jul 2023Leaks and plumbing§ 27-2026

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from east at south wall in the 4th room from north, 1st story at north

    Issued 28 Dec 2022Violation closed 26 Jul 2023Lead paint§ 27-2056.6

  • Properly repair the broken or defective window balance at lower sash in the 1st room from north, 1st story at north

    Issued 26 Aug 2021Violation closed 6 Jun 2023Doors and windows§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from north, 1st story at north

    Issued 28 Dec 2022Violation dismissed 21 Mar 2023Walls and ceilings§ 27-2005

  • Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 4th room from north, 1st story at north

    Issued 28 Dec 2022Violation dismissed 21 Mar 2023Heat and hot water§ 27-2005

  • Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom, 1st story at north

    Issued 28 Dec 2022Violation dismissed 21 Mar 2023Floors and stairs§ 27-2005

  • Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom, the kitchen, 1st story at north

    Issued 28 Dec 2022Violation dismissed 21 Mar 2023Walls and ceilings§ 27-2013

  • Properly repair with similar material the broken or defective sagging wood floor in the 3rd bathroom from north, 1st story at west

    Issued 26 Sept 2021Violation closed 16 Jun 2022Floors and stairs§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from north, 1st story at west

    Issued 26 Sept 2021Violation closed 16 Jun 2022Walls and ceilings§ 27-2005

  • Trace and repair the source and abate the visible mold condition... approximately 8 sq. ft under east wall cabinets in the kitchen, 2nd story at east original violation 13849987 issued 06-oct-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).

    Issued 6 Oct 2020Violation closed 7 Jun 2021Mold and damp§ 27-2017.3

  • Trace and repair the source and abate the visible mold condition... approximately 4 sq. ft at ceiling in the bathroom, 2nd story at west original violation 13850019 issued 06-oct-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).

    Issued 6 Oct 2020Violation closed 7 Jun 2021Mold and damp§ 27-2017.3

Showing the 100 most recent of 321.

344 violations on record in total, 3 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

139 complaints in three years, 7 of them in the last twelve months.

  • Heat and hot water5 / 75
  • Pests0 / 21
  • Leaks and plumbing1 / 11
  • Fire and safety equipment1 / 9
  • Doors and windows0 / 9
  • Mold and damp0 / 4
  • Other0 / 4
  • Electrical0 / 3
  • Walls and ceilings0 / 2
  • Construction and illegal work0 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

5 cases, all closed.

  • Tenant Action/Harassment

    Opened 11 Feb 2025

  • Tenant Action

    Opened 26 Apr 2023

  • Tenant Action

    Opened 10 Mar 2011

  • Heat and Hot Water

    Opened 5 Jan 2011

  • Heat and Hot Water

    Opened 24 Feb 2010

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No DOB permits filed for this building in the last five years.

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2025No infested units reported (2024 report)
Show 5 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2022 report)
  • 2023No infested units reported (2021 report)
  • 2023No infested units reported (2021 report)
  • 2022No infested units reported (2020 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    MOSHE DEUTSCH

    Public records list MOSHE DEUTSCH as the registered managing agent for this address as of 30 Aug 2026. Source: HPD registration.

    Other buildings listed under this agent (1 in the records we hold)

    No combined rating for this agent yet. A portfolio rating needs at least 5 verified reviews across 2 or more buildings; currently 0.

  • Owner of record

    321 HARMAN REALTY LLC

    Public records list 321 HARMAN REALTY LLC as the owner of record for this address as of 30 Aug 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 2 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. There were 5 heat or hot-water complaints here in the last twelve months. Ask who handles heat, how quickly it is usually restored, and whether the boiler has been replaced.
  3. The city recorded 2 mould violations here, most recently in 2020, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
  4. The owner has filed a bedbug report for this building (most recently for the year ending 2025). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 3032790038 · Block 3279, Lot 38 · Building class C2