ByTenantsByTenants home

248 Stanhope Street, Brooklyn, NY 11237

Built 1931 · 3-story walk-up · 6 apartments

25 immediately hazardous violations open. 42 open in all. On the state's rent-stabilization list for 2024.

Tenant reviews
None yetLived here? Reviews open soon.
Open violations
4225 · 12 · 5
Public record
Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.

Violations issued each year

None issued since 2022. 59 violations before that, the first in 2006.

See every violation
Open per apartment
7 (42 open across 6 apartments)
Inspector last found a problem
9 Oct 2021 (visits that find nothing are not published)
What do these labels mean?
Tenant-reported
A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
Official violation
A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
Public complaint
A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
Public filing
A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
Court record
A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
Insufficient data
Not enough current information here to infer a pattern either way.

Tenant reviews

Tenant-reported

No tenant reviews yet. Lived here? Be the first.

Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.

Not open yet. Reviews open when this neighbourhood does.

Heat season

No heat or hot-water complaints or violations were recorded here last winter (2025–26). That is the city's record: it only holds what somebody reported.

WinterDaysComplaintsViolations
2025–26000

The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.

Rent stabilization

Public filing

The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.

Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.

City violations

Official violation

Immediately hazardous25 open

Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Issued 25 Dec 2018Notice sent out 25 Dec 2018Heat and hot water§ 27-2033

  • Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment, 3rd story at west

    Issued 29 Dec 2012Notice sent out 1 Jan 2013Fire and safety equipment§ 27-2043.1

  • ×2Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system.. at public hall, 1st story

    2 issued 9 Dec 2010 to 29 Dec 2012Notice sent outHeat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at west

    Issued 29 Dec 2012Notice sent out 1 Jan 2013Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system door padlocked to cellar at public hall, 1st story

    Issued 29 Dec 2012Notice sent out 1 Jan 2013Heat and hot water§ 27-2033

  • Provide ready access to buildings heating system door locked at cellar

    Issued 30 Nov 2012Notice sent out 3 Dec 2012Heat and hot water§ 27-2033

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at south

    Issued 30 Nov 2012Notice sent out 3 Dec 2012Heat and hot water§ 27-2031

  • Abate the nuisance consisting of the ceiling in the kitchen, 1st story

    Issued 7 Dec 2011Notice sent out 8 Dec 2011Walls and ceilings§ 27-2005 +1

  • Abate the nuisance consisting of a concealed water leak at ceiling in the bathroom, 1st story

    Issued 7 Dec 2011Notice sent out 8 Dec 2011Leaks and plumbing§ 27-2005 +1

  • Provide hot water at all hot water fixtures in the entire apartment, 3rd story at east

    Issued 8 Aug 2011Notice sent out 9 Aug 2011Heat and hot water§ 27-2031

Show all 25
  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at first story public hall

    Issued 8 Aug 2011Notice sent out 9 Aug 2011Heat and hot water§ 27-2033

  • Provide ready access to buildings heating system, door lock at first story hall

    Issued 8 Aug 2011Notice sent out 9 Aug 2011Heat and hot water§ 27-2033

  • ×2Provide ready access to buildings heating system boiler room door locked at cellar

    2 issued 9 Dec 2010 to 23 Jan 2011Notice sent outHeat and hot water§ 27-2033

  • Abate the nuisance consisting of scalding hot water in the entire apartment, 3rd story

    Issued 23 Jan 2011Notice sent out 24 Jan 2011Heat and hot water§ 27-2005 +1

  • Provide ready access to buildings heating system door locked at public hall, 1st story

    Issued 5 Jan 2011Notice sent out 9 Jan 2011Heat and hot water§ 27-2033

  • Abate the nuisance consisting of scalding hot water 160 f, at kitchen and bathroom, 3rd story at west

    Issued 5 Jan 2011Notice sent out 9 Jan 2011Heat and hot water§ 27-2005 +1

  • Abate the nuisance consisting of scalding hot water in the entire apartment, 3rd story at west

    Issued 9 Dec 2010Notice sent out 12 Dec 2010Heat and hot water§ 27-2005 +1

  • ×2Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 2nd room from north at west, 2nd story at east

    2 issued 7 Dec 2006 to 21 Jan 2007Defect letter issuedLead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, south wall, west wall in the 2nd room from north at east, 2nd story at east

    Issued 21 Jan 2007Defect letter issued 17 Sept 2009Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west, 2nd story at east

    Issued 21 Jan 2007Defect letter issued 17 Sept 2009Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door frame from south at west wall, 1st window frame from east at south wall in the kitchen, 2nd story at east

    Issued 21 Jan 2007Defect letter issued 17 Sept 2009Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 2nd door from east at south wall, 2nd door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at east, 2nd story at east

    Issued 21 Jan 2007Defect letter issued 17 Sept 2009Lead paint§ 27-2056.6

Hazardous12 open

Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.

  • Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story

    Issued 13 Feb 2019Notice sent out 13 Feb 2019Electrical§ 27-2040

  • Replace or repair the self-closing doors that is missing or defective in the entrance, 1st story at west

    Issued 25 Dec 2018Notice sent out 25 Dec 2018Fire and safety equipment§ 27-2005 +2

  • Repair or replace the carbon monoxide detecting device(s). defective, 1st story at west

    Issued 25 Dec 2018Notice sent out 25 Dec 2018Fire and safety equipment§ 27-2046.1

  • Repair or replace the smoke detector defective, 1st story at west

    Issued 25 Dec 2018Notice sent out 25 Dec 2018Fire and safety equipment§ 27-2045

  • Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen, 1st story

    Issued 7 Dec 2011Notice sent out 8 Dec 2011Walls and ceilings§ 27-2005

  • Properly repair the broken or defective electrical outlet at north wall in the 3rd room from north, 1st story

    Issued 7 Dec 2011Notice sent out 8 Dec 2011Electrical§ 27-2005

  • ×2Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 1st story

    2 issued 26 Nov 2011 to 7 Dec 2011Notice sent outWalls and ceilings§ 27-2005

  • Repair the broken or defective plastered surfaces and paint in a uniform color the north wall around electrical outlet in the 3rd room from north, 1st story

    Issued 7 Dec 2011Notice sent out 8 Dec 2011Electrical§ 27-2005

  • Repair or replace the smoke detector missing in the entire apartment, 1st story

    Issued 26 Nov 2011Notice sent out 27 Nov 2011Fire and safety equipment§ 27-2045

  • Repair or replace the smoke detector missing in the entire apartment, 1st story at west

    Issued 5 Oct 2011Notice sent out 11 Oct 2011Fire and safety equipment§ 27-2045

Show all 12
  • Properly repair the broken or defective bell buzzer system, 3rd story at west

    Issued 5 Jan 2011Notice sent out 9 Jan 2011Entry, buzzer and mail§ 27-2005

Non-hazardous5 open

Class A. The least serious band: chipped plaster, a missing cabinet, a peeling ceiling in a hallway. The owner has 90 days to correct it.

  • Paint with light colored paint to the satisfaction of this department the ceiling, west wall in the 1st room from north, 3rd story at west

    Issued 29 Dec 2012Notice sent out 4 Mar 2013Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom, 3rd story at west

    Issued 29 Dec 2012Notice sent out 4 Mar 2013Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the east wall in the kitchen, 3rd story at west

    Issued 29 Dec 2012Notice sent out 4 Mar 2013Walls and ceilings§ 27-2013

  • Paint with light colored paint to the satisfaction of this department the south wall in the kitchen, 1st story at west

    Issued 8 Aug 2011Notice sent out 28 Nov 2011Walls and ceilings§ 27-2013

  • Properly repair the broken or defective doorbell at public hall, 3rd story

    Issued 2 Dec 2010Notice sent out 7 Dec 2010Entry, buzzer and mail§ 27-2005

Paperwork and notices3 open

The owner failed to file something the city requires, most often the annual property registration or the annual bedbug report. Real violations, and they say something about an owner, but not a condition anyone is living in. Kept out of the count at the top of this page for that reason.

  • Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Issued 2 Dec 2019Notice sent out 2 Dec 2019Paperwork and notices§ 27-2005

  • Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 3rd story

    Issued 3 Feb 2005Notice sent out 8 Feb 2005Paperwork and notices§ 27-2046.1

  • Dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor inproper frame.

    Issued 19 Oct 1984Not complied with 18 Oct 1984Paperwork and notices§ 329

17 closed violations, plus 13 closed paperwork filings

Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story at east

    Issued 9 Oct 2021Violation closed 2 Nov 2021Heat and hot water§ 27-2031

  • Provide ready access to buildings heating system locked boiler room door at basement

    Issued 17 Feb 2021Violation dismissed 16 May 2021Heat and hot water§ 27-2033

  • Provide a safe and adequate supply of electric service to the fixtures at all electrical outlet in the bathroom, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from north at west, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide a safe and adequate supply of electric service to the fixtures at all electrical outlet in the 1st room from north at west, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from north at west, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide a safe and adequate supply of electric service to the fixtures at all electrical outlet in the 2nd room from north at west, 2nd story at north

    Issued 17 Feb 2021Violation dismissed 2 May 2021Electrical§ 27-2037

  • Provide hot water at all hot water fixtures in the entire apartment, 2nd story at north

    Issued 17 Feb 2021Violation closed 24 Mar 2021Heat and hot water§ 27-2031

  • Provide an adequate supply of heat for the apartment in the entire apartment, 2nd story at north

    Issued 17 Feb 2021Violation closed 24 Mar 2021Heat and hot water§ 27-2029

  • Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system, at lobby, 1st story

    Issued 8 Oct 2020Violation dismissed 27 Dec 2020Heat and hot water§ 27-2033

  • Replace or repair the self-closing the doors that is missing or defective at south entrance, 1st story

    Issued 2 Dec 2019Violation closed 16 Feb 2020Fire and safety equipment§ 27-2044

  • Properly repair with similar material the broken or defective ceramic tile floor in the bathroom, 1st story at west

    Issued 25 Dec 2018Violation closed 25 Jul 2019Floors and stairs§ 27-2005

  • Provide hot water at all hot water fixtures in the entire apartment, 1st story at west

    Issued 25 Dec 2018Violation closed 17 Jan 2019Heat and hot water§ 27-2031

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen, 3rd story at west

    Issued 29 Dec 2012Violation closed 3 Mar 2013Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom, 3rd story at west

    Issued 29 Dec 2012Violation closed 3 Mar 2013Lead paint§ 27-2056.6

  • Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the 1st room from north, 3rd story at west

    Issued 29 Dec 2012Violation closed 3 Mar 2013Lead paint§ 27-2056.6

75 violations on record in total, 45 of them open. The count at the top of this page counts habitability violations only.

Complaints to the city

Public complaint

Complaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.

6 complaints in three years, 1 of them in the last twelve months.

  • Pests0 / 5
  • Electrical1 / 1

Last twelve months / last three years. The solid part of each bar is the last twelve months.

Court records

Court record

Housing Court cases

Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.

4 cases, all closed.

  • Heat and Hot Water

    Opened 2 May 2013

  • Heat and Hot Water

    Opened 5 Jan 2011Judgment entered

  • Tenant Action

    Opened 20 Dec 2010

  • Comprehensive

    Opened 8 Jul 2008

Evictions

Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.

No marshal evictions recorded at this building since 2017.

Filings

Public filing

Building permits

No permit currently in force. 3 permits filed in the last five years.

Show 3 expired or finished
  • Plumbing

    INSTALL NEW GAS METER & PIPING FOR BOILER FILED UNDER B00599484. DISCONNECT EX. BOILER GAS LINE FROM EX. TENANT METER/RISER, TEST RISER. REFILE INDIRECT DHW HEATER/STORAGE TANK FILED UNDER B00599484. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APP.

    Issued 6 Jan 2022Expired 14 Jun 2022

  • General Construction

    INSTALL FRESH AIR AND VENT PIPES FOR DIRECT VENTED BOILER FILED UNDER B00599484. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

    Issued 21 Dec 2021Expired 14 Jun 2022

  • Boiler Equipment

    REFILING OF REPLACEMENT LOW PRESSURE GAS BOILER ORIGINALLY FILED UNDER 321509774 TO OBTAIN REQUIRED SIGN OFFS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

    Issued 16 Dec 2021Expired 14 Jun 2022

Annual bedbug report

Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.

  • 2026No infested units reported (2024 report)
Show 4 earlier reports
  • 2024No infested units reported (2023 report)
  • 2023No infested units reported (2021 report)
  • 2022No infested units reported (2020 report)
  • 2021No infested units reported (2019 report)

Ownership and management

Public filing

Associations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.

  • Registered managing agent

    THE GORA GROUP LLC

    Public records list THE GORA GROUP LLC as the registered managing agent for this address as of 9 Feb 2026. Source: HPD registration.

  • Owner of record

    STANHOPE 248 LLC

    Public records list STANHOPE 248 LLC as the owner of record for this address as of 9 Feb 2026. Source: HPD registration.

Wrong company, wrong date, or a change that is not reflected here? Report a correction.

What to ask at the viewing

Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.

  1. The city currently has 25 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
  2. The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
  3. This building dates from 1931 and has 6 open lead-paint violations on record. If a child under six will live here, ask what testing and remediation has been done and ask for it in writing.
  4. Leaks and plumbing come up on this building's record. Ask which apartments were affected and whether the cause was ever found: 0 complaints in the last twelve months.
  5. Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
  6. Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.

Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.

Questions about this building

BBL 3032690026 · Block 3269, Lot 26 · Building class C2