316 Suydam Street, Brooklyn, NY 11237
Built 1931 · 3-story walk-up · 6 apartments
4 immediately hazardous violations open. 10 open in all. 1 Housing Court case pending. On the state's rent-stabilization list for 2024.
- Tenant reviews
- None yetLived here? Reviews open soon.
- Open violations
- 104 · 6
- Public record
- Updated todayFrom the city’s own data (, 311, the courts), refreshed nightly.
Violations issued each year
| Year | Hazardous | Non-hazardous |
|---|---|---|
| 2022 | 7 | 1 |
| 2023 | 12 | 0 |
| 2024 | 12 | 2 |
| 2025 | 14 | 1 |
| 2026 so far | 3 | 0 |
Plus 429 violations from 2004 to 2021. Counted when issued, whether open or fixed since. Paperwork left out.
See every violation- Found most often since 2022
- Fire and safety equipment 14
- Doors and windows 13
- Leaks and plumbing 6
- Open per apartment
- 1.7 (10 open across 6 apartments)
- Inspector last found a problem
- 9 Sept 2026 (visits that find nothing are not published)
What do these labels mean?Where each of these comes from
- Tenant-reported
- A resident's firsthand account of living here, moderated before it publishes, and labelled with whether we verified they lived there.
- Official violation
- A city inspector visited and recorded a code violation. HPD's own words, and its own hazard class.
- Public complaint
- A complaint somebody made to a city system, through HPD or 311. A report, not a finding: nobody has necessarily inspected it.
- Public filing
- A permit, a registration, a bedbug report: a document the owner filed with the city because the law requires it.
- Court record
- A Housing Court case HPD brought against the owner, or an eviction a city marshal carried out. A court's record: a case is an allegation until it ends in a finding.
- Insufficient data
- Not enough current information here to infer a pattern either way.
Tenant reviews
Tenant-reportedNo tenant reviews yet. Lived here? Be the first.
Nothing above this section came from a tenant. It is all filed by the city, which means it only holds what somebody reported and an inspector wrote down, not what it is actually like to live here.
Not open yet. Reviews open when this neighbourhood does.
Heat season
Last winter (2025–26), the city received heat or hot-water complaints about this building on 1 day, and inspectors issued 1 violation.
| Winter | DaysDays with complaints | Complaints | Violations |
|---|---|---|---|
| 2025–26 | 1 | 2 | 1 |
The rules, 1 October to 31 May: from 6am to 10pm, when it is below 55°F outside, the apartment must be at least 68°F; overnight it must be at least 62°F whatever the weather. Hot water must be at least 120°F all year. A tenant without heat can report it to 311.
Rent stabilization
Public filingThe owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments, or how many.
Source: Rent Guidelines Board building list, from the state's 2024 registrations. To know about one apartment, a tenant can ask the state for its rent history through Ask HCR.
City violations
Official violationImmediately hazardous4 open
Class C. HPD considers the condition an immediate danger: no heat in winter, no hot water, lead paint where a child lives, a broken lock on the front door. The owner has 24 hours to correct it.
Abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment, 3rd story at west
Issued 21 May 2026Notice sent out 25 May 2026Heat and hot water§ 27-2005 +1
Abate the infestation consisting of roaches in the entire apartment, 3rd story at west
Issued 23 Apr 2025Defect letter issued 21 May 2026Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 3rd story at south
Issued 12 Jun 2020Defect letter issued 21 May 2026Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 3rd story
Issued 8 Oct 2019Defect letter issued 21 May 2026Pests§ 27-2017.4
Hazardous6 open
Class B. A hazardous condition: a leak, mould, a defective floor. The owner has 30 days to correct it.
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom, 3rd story at north
Issued 9 Sept 2026Notice sent out 10 Sept 2026Leaks and plumbing§ 27-2005
Properly repair or replace the broken or defective lower sash counter balance at north 1 and north 2 window in the 1st room from north, 1st story at west
Issued 16 Jul 2025First no access to re- inspect violation 28 May 2026Doors and windows§ 27-2005
Properly repair or replace the broken or defective make window operable in the bathroom, 3rd story at west
Issued 16 Jul 2025Not complied with 21 May 2026Doors and windows§ 27-2005
Properly repair or replace the broken or defective make window operable in the bathroom, 3rd story at east
Issued 16 Jul 2025Not complied with 21 May 2026Doors and windows§ 27-2005
Properly repair or replace the broken or defective lower sash counter balance at south 1 and south 2 window in the kitchen, 1st story at west
Issued 16 Jul 2025First no access to re- inspect violation 28 May 2026Doors and windows§ 27-2005
Properly repair with similar material the broken or defective ceramic floor in the kitchen, 3rd story at west
Issued 23 Apr 2025Not complied with 21 May 2026Floors and stairs§ 27-2005
473 closed violations, plus 16 closed paperwork filingsShow fewer
Closed means HPD recorded the violation as corrected, or dismissed it. Both appear here, because the difference matters and only HPD’s own status line says which it was.
Remove all encumbrances consisting of household items at public hall, 1st story
Issued 21 May 2026Violation dismissed 1 Sept 2026Fire and safety equipment§ 27-2005 +1
Properly repair or replace the broken or defective light switch at south in the 3rd room from north, 3rd story at west
Issued 16 Jul 2025Violation closed 21 May 2026§ 27-2005
×3Repair the leaky and/or defective faucets at bathtub in the bathroom, 3rd story at east
3 issued 10 Dec 2023 to 16 Jul 2025Violation closedLeaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets at sink in the kitchen, 3rd story at west
Issued 16 Jul 2025Violation closed 21 May 2026Leaks and plumbing§ 27-2026
Properly repair or replace the broken or defective electrical light switch at south wall in the 2nd room from north, 3rd story at east
Issued 12 Jul 2025Violation closed 21 May 2026Electrical§ 27-2005
Adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at. in the entrance, 3rd story at east
Issued 10 Sept 2024Violation closed 21 May 2026Doors and windows§ 25-171
Abate the infestation consisting of mice in the entire apartment, 3rd story at west
Issued 23 Apr 2025Violation closed 22 Jan 2026Pests§ 27-2017.4
Abate the infestation consisting of mice in the entire apartment, 3rd story at south
Issued 12 Jun 2020Violation closed 22 Jan 2026Pests§ 27-2017.4
Properly repair or replace the broken or defective escutheon plate at bathtub faucet in the bathroom, 3rd story at east
Issued 12 Jul 2025Violation dismissed 20 Nov 2025Leaks and plumbing§ 27-2005
Replace or repair the self-closing doors that is missing or defective hinges in the entrance, 3rd story at east
Issued 12 Jul 2025Violation closed 23 Sept 2025Fire and safety equipment§ 27-2005 +3
Replace or repair the self-closing the doors that is missing or defective fire door at public hall, 3rd story
Issued 10 Sept 2024Violation closed 23 Sept 2025Fire and safety equipment§ 27-2044 +3
Replace or repair the self-closing the doors that is missing or defective fire door at public hall, 2nd story
Issued 10 Sept 2024Violation closed 23 Sept 2025Fire and safety equipment§ 27-2044 +3
Replace or repair the self-closing the doors that is missing or defective center section door at public hall, 1st story
Issued 23 Apr 2025Violation closed 17 Jul 2025Fire and safety equipment§ 27-2044 +3
Repair the flushing apparatus and maintain same so as to flush effectively the water closet. in the bathroom, 1st story at east
Issued 23 Apr 2025Violation closed 17 Jul 2025§ 27-2026
Refit fire door at public hall, 3rd story
Issued 10 Sept 2024Violation closed 17 Jul 2025Doors and windows§ 27-2005
Properly repair with similar material the broken or defective wood door at entrance in the bathroom, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Doors and windows§ 27-2005
Properly repair or replace the broken or defective latch at door in the entrance, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Doors and windows§ 27-2005
Repair or replace the smoke detector missing in the entire apartment, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Fire and safety equipment§ 27-2045
Refit fire door at public hall, 2nd story
Issued 10 Sept 2024Violation closed 17 Jul 2025Doors and windows§ 27-2005
Properly repair or replace the broken or defective mailbox for an apartment at public hall, 1st story
Issued 10 Sept 2024Violation closed 17 Jul 2025Entry, buzzer and mail§ 27-2005
Properly repair or replace the broken or defective electrical outlet at north in the 3rd room from north, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Electrical§ 27-2005
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Fire and safety equipment§ 27-2046.1
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north, 3rd story at east
Issued 10 Sept 2024Violation closed 17 Jul 2025Walls and ceilings§ 27-2005
Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from north, 3rd story at east
Issued 10 Dec 2023Violation closed 17 Jul 2025Walls and ceilings§ 27-2005
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at ceiling in the 3rd room from north, 3rd story at east
Issued 10 Dec 2023Violation closed 17 Jul 2025Electrical§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north, 3rd story at east
Issued 10 Dec 2023Violation closed 17 Jul 2025Walls and ceilings§ 27-2005
Properly repair with similar material the broken or defective wood door panel in the bathroom, 3rd story at east
Issued 10 Dec 2023Violation closed 17 Jul 2025Doors and windows§ 27-2005
Remove the illegal fastening hook and eye at vestibule at public hall, 1st story
Issued 19 Sept 2023Violation closed 17 Jul 2025§ 27-2005 +1
Properly repair with similar material the broken or defective wooden crown molding at west wall. in the kitchen, 3rd story at west
Issued 19 Sept 2023Violation closed 17 Jul 2025Walls and ceilings§ 27-2005
×2Remove all encumbrances consisting of household items at public hall, 3rd story
2 issued 6 Jan 2021 to 19 Sept 2023Violation closedFire and safety equipment§ 27-2005 +1
Refit the door at building entrance at public hall, 1st story
Issued 6 Jul 2023Violation closed 17 Jul 2025Doors and windows§ 27-2005
Abate the nuisance consisting of scalding hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment, 3rd story at south
Issued 1 Mar 2022Violation closed 17 Jul 2025Heat and hot water§ 27-2005 +1
Repair or replace the smoke detector -missing- in the entire apartment, 1st story at south
Issued 6 Jan 2021Violation closed 17 Jul 2025Fire and safety equipment§ 27-2045
Properly repair the broken or defective hinges at door to public hall in the 1st room from east, 1st story at south
Issued 6 Jan 2021Violation closed 17 Jul 2025Doors and windows§ 27-2005
Repair or replace the carbon monoxide detecting device(s). -missing- in the entire apartment, 1st story at south
Issued 6 Jan 2021Violation closed 17 Jul 2025Fire and safety equipment§ 27-2046.1
Properly repair with similar material the broken or defective the bottom wood panel at sink base cabinet in the kitchen, 3rd story at south
Issued 6 Jan 2021Violation closed 17 Jul 2025Leaks and plumbing§ 27-2005
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 f at all hot water fixtures in the entire apartment, 3rd story at south
Issued 6 Jan 2021Violation closed 17 Jul 2025Heat and hot water§ 27-2005 +1
Replace or repair the self-closing the doors that is missing or defective latch in the entrance, 3rd story at east
Issued 10 Sept 2024Violation closed 3 Apr 2025Fire and safety equipment§ 27-2044 +3
Properly repair or replace the broken or defective upper sash glass pane at 1st window from east at south in the kitchen, 3rd story at east
Issued 10 Dec 2023Violation dismissed 3 Mar 2024Doors and windows§ 27-2005
Properly repair or replace the broken or defective lower sash counterbalance at fire escape window in the kitchen, 3rd story at east
Issued 10 Dec 2023Violation dismissed 3 Mar 2024Fire and safety equipment§ 27-2005
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment, 3rd story at east
Issued 10 Dec 2023Violation dismissed 3 Mar 2024Heat and hot water§ 27-2005 +1
Properly repair the broken or defective light fixture at ceiling in the kitchen, 3rd story at south
Issued 1 Mar 2022Violation dismissed 30 May 2022Walls and ceilings§ 27-2005
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment, 3rd story at south
Issued 1 Mar 2022Violation dismissed 30 May 2022Fire and safety equipment§ 27-2046.1
Refit vestibule hall door at public hall, 1st story
Issued 1 Mar 2022Violation dismissed 30 May 2022Doors and windows§ 27-2005
Repair or replace the smoke detector defective in the entire apartment, 3rd story at south
Issued 1 Mar 2022Violation dismissed 30 May 2022Fire and safety equipment§ 27-2045
Properly repair the broken or defective mechanical ventilation system at ceiling in the bathroom, 3rd story at south
Issued 1 Mar 2022Violation dismissed 30 May 2022Walls and ceilings§ 27-2005
Repair or replace the smoke detector defective, 1st story at east
Issued 1 Mar 2022Violation dismissed 26 May 2022Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s). defective, 1st story at east
Issued 1 Mar 2022Violation dismissed 26 May 2022Fire and safety equipment§ 27-2046.1
Abate the infestation consisting of mice in the entire apartment, 1st story at east
Issued 26 Aug 2020Violation closed 15 May 2022Pests§ 27-2017.4
Abate the infestation consisting of roaches in the entire apartment, 1st story at east
Issued 26 Aug 2020Violation closed 15 May 2022Pests§ 27-2017.4
Trace and repair the source and abate the visible mold condition... approximately 4 square feet at ceiling in the bathroom, 1st story at east original violation 13788184 issued 26-aug-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).
Issued 26 Aug 2020Violation closed 15 May 2022Mold and damp§ 27-2017.3
Properly repair with similar material the broken or defective missing 7th and 8th banister from top to bottom at public hall stairs, 1st story
Issued 6 Jan 2021Violation closed 2 Mar 2022Floors and stairs§ 27-2005
Abate the nuisance consisting of lockable slide bolt at door to public hall in the kitchen, 1st story at south
Issued 6 Jan 2021Violation dismissed 11 May 2021Doors and windows§ 27-2005 +1
Arrange and make self-closing the doors leading to the basement, 1st story
Issued 6 Jan 2021Violation closed 22 Apr 2021Fire and safety equipment§ 27-2005 +1
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom, 1st story at east
Issued 26 Aug 2020Violation closed 25 Feb 2021Walls and ceilings§ 27-2005
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom, 1st story at east
Issued 26 Aug 2020Violation closed 25 Feb 2021Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective ceiling molding at south closet in the kitchen, 3rd story at south
Issued 12 Jun 2020Violation closed 25 Feb 2021Walls and ceilings§ 27-2005
Repair or replace the smoke detector defective, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Fire and safety equipment§ 27-2045
Remove all encumbrances consisting of bicycles and house hold items at public hall, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Fire and safety equipment§ 27-2005 +1
Repair the leaky and/or defective faucets at sink in the kitchen, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Leaks and plumbing§ 27-2026
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Leaks and plumbing§ 27-2005
Repair the broken or defective connection at sink waste line in the kitchen, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Leaks and plumbing§ 27-2026
Repair the leaky and/or defective faucets at bathtub in the bathroom, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Leaks and plumbing§ 27-2026
Repair or replace the carbon monoxide detecting device(s). defective, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Fire and safety equipment§ 27-2046.1
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 5th room from east, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Walls and ceilings§ 27-2005
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from east, 3rd story
Issued 8 Oct 2019Violation closed 25 Feb 2021Walls and ceilings§ 27-2005
Repair the broken or defective connection at waste pipe under the sink in the kitchen, 3rd story
Issued 29 Aug 2019Violation closed 25 Feb 2021Leaks and plumbing§ 27-2026
Arrange and make self-closing the doors at building entrance at public hall, 1st story
Issued 4 Jun 2019Violation closed 25 Feb 2021Fire and safety equipment§ 27-2044
Paint to the satisfaction of this department the exterior window frames and sashes on 3rd story; n3 and n4 windows, and on 2nd story; n1 and n2 windows, at west exterior wall front of building
Issued 4 Jun 2019Violation closed 25 Feb 2021Doors and windows§ 27-2014
Provide intercom system from apartment to main building entrance in the entire apartment, 1st story at east
Issued 28 Apr 2016Violation closed 25 Feb 2021Entry, buzzer and mail§ 27-2005
Trace and repair the source and abate the visible mold condition... approximately 4 square feet at ceiling in the bathroom, 1st story at east
Issued 26 Aug 2020Violation closed 25 Dec 2020Mold and damp§ 27-2017.3
Arrange and make self-closing the doors at east at public hall, 3rd story
Issued 8 Oct 2019Violation closed 23 Oct 2020Fire and safety equipment§ 27-2005 +1
Abate the nuisance consisting of uncovered hot water riser pipe at west wall in the 4th room from east, 3rd story
Issued 8 Oct 2019Violation closed 5 Nov 2019Heat and hot water§ 27-2005 +1
Arrange and make self-closing the doors at building front
Issued 31 Aug 2018Violation closed 17 Mar 2019Fire and safety equipment§ 27-2005 +1
Properly repair the broken or defective lock for an apartment mailbox at public hall, 1st story
Issued 31 Aug 2018Violation closed 17 Mar 2019Entry, buzzer and mail§ 27-2005
Refit the building front entrance door at public hall, 1st story
Issued 30 Aug 2018Violation closed 17 Mar 2019Doors and windows§ 27-2005
Properly repair the broken or defective baseboard heat panel cover at public hall, 1st story
Issued 30 Aug 2018Violation closed 17 Mar 2019Heat and hot water§ 27-2005
Replace with new the broken or defective ceramic tiles at north, south and west walls in the bathroom, 1st story at west
Issued 30 Mar 2017Violation closed 19 Jul 2018Walls and ceilings§ 27-2005
Provide a safe and adequate supply of electric service to the fixtures... ceiling light fixture in the 3rd room from north, 3rd story at west
Issued 30 Mar 2017Violation closed 12 Jun 2018Electrical§ 27-2037
Properly repair the broken or defective bell, 3rd story at west
Issued 10 Aug 2016Violation closed 12 Jun 2018Entry, buzzer and mail§ 27-2005
Replace with new the missing grout at bathtub in the bathroom, 1st story at east
Issued 28 Apr 2016Violation closed 12 Jun 2018Leaks and plumbing§ 27-2005
Properly repair the broken or defective bells at front entrance to building in the entire apartment, 1st story
Issued 23 Aug 2012Violation closed 12 Jun 2018Entry, buzzer and mail§ 27-2005
Repair the broken or defective connection in waste line at sink in the kitchen, 3rd story at north
Issued 23 May 2017Violation closed 17 Jul 2017Leaks and plumbing§ 27-2026
Repair the broken or defective connection wastepipe at sink in the kitchen, 3rd story at south
Issued 13 May 2017Violation closed 31 May 2017Leaks and plumbing§ 27-2026
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Issued 31 Jan 2017Violation dismissed 3 May 2017§ 27-2153
Replace with new the broken or defective door in the bathroom, 1st story at west
Issued 30 Mar 2017Violation closed 13 Apr 2017Doors and windows§ 27-2005
Remove all obstructions and repair all defects in bathtub wasteline in the bathroom, 1st story at west
Issued 30 Mar 2017Violation closed 13 Apr 2017Leaks and plumbing§ 27-2026
Properly secure the loose ceiling light fixture at public hall, 2nd story
Issued 30 Mar 2017Violation closed 13 Apr 2017Walls and ceilings§ 27-2005
Properly repair the broken or defective 3 wood joist at south side at cellar
Issued 3 Nov 2016Violation closed 13 Apr 2017§ 27-2005
Replace with new the broken or defective self closing fire rated exit door in the entrance, 1st story
Issued 3 Nov 2016Violation closed 13 Apr 2017Fire and safety equipment§ 27-2005
Repair or replace the smoke detector.... missing in the entire apartment, 1st story at east
Issued 3 Nov 2016Violation closed 13 Apr 2017Fire and safety equipment§ 27-2045
Repair or replace the carbon monoxide detecting device(s)..... missing in the entire apartment, 1st story at east
Issued 3 Nov 2016Violation closed 13 Apr 2017Fire and safety equipment§ 27-2046.1
Replace with new the broken or defective self closing fire rated exit door in the 1st room from north, 1st story at west
Issued 3 Nov 2016Violation closed 13 Apr 2017Fire and safety equipment§ 27-2005
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom, 1st story
Issued 22 Jul 2016Violation closed 13 Apr 2017Leaks and plumbing§ 27-2026
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom, 1st story
Issued 22 Jul 2016Violation closed 13 Apr 2017Walls and ceilings§ 27-2005
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration... acoustic ceiling in the private hallway, 1st story at east
Issued 28 Apr 2016Violation closed 13 Apr 2017Walls and ceilings§ 300
File plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration 'drop ceiling' in the 3rd room from north, 1st story at east
Issued 30 Jul 2015Violation closed 13 Apr 2017Walls and ceilings§ 300
Showing the 100 most recent of 473.
499 violations on record in total, 10 of them open. The count at the top of this page counts habitability violations only.
Complaints to the city
Public complaintComplaints are reports made to the city. They are not confirmed findings. They come from HPD and from 311, and the same problem can appear more than once if more than one neighbour called.
78 complaints in three years, 18 of them in the last twelve months.
- Noise16 / 25
- Leaks and plumbing0 / 14
- Heat and hot water0 / 9
- Doors and windows0 / 9
- Electrical0 / 6
- Appliances2 / 4
- Floors and stairs0 / 3
- Walls and ceilings0 / 3
- Entry, buzzer and mail0 / 2
- Pests0 / 2
- Mold and damp0 / 1
Last twelve months / last three years. The solid part of each bar is the last twelve months.
Court records
Court recordHousing Court cases
Cases the city’s housing department (HPD) brought against the owner, usually to force repairs or restore heat. A case is an allegation; where the court recorded an outcome, it is shown.
1 case pending, 10 closed.
Tenant Action/HarassmentPending
Opened 24 Dec 2024
Tenant Action
Opened 4 Dec 2024
Access Warrant - Non-Lead
Opened 17 Jul 2018
Access Warrant - Non-Lead
Opened 1 Jun 2018
Access Warrant - lead
Opened 19 Jun 2015
Access Warrant - Non-Lead
Opened 20 May 2015
7A
Opened 14 May 2015
7A
Opened 17 Dec 2014
Tenant Action
Opened 17 Dec 2014
Comprehensive
Opened 4 Dec 2014
Show 1 olderShow fewer
Tenant Action
Opened 21 Oct 2005
Evictions
Residential evictions carried out by a city marshal since 2017. Most follow a case for unpaid rent, so a count here is not by itself a finding about the building or the landlord. We show how many, never which apartment.
No marshal evictions recorded at this building since 2017.
Filings
Public filingBuilding permits
No DOB permits filed for this building in the last five years.
Annual bedbug report
Every multiple dwelling in New York must file this once a year. A report of zero infested units is good news. No report is not: failing to file is itself a violation.
- 2026No infested units reported (2024 report)
Show 2 earlier reportsShow fewer
- 2025No infested units reported (2023 report)
- 2024No infested units reported (2022 report)
Ownership and management
Public filingAssociations come from registration records and may be incomplete. Owners register with HPD once a year, so a change of hands can go unrecorded for a full cycle.
Registered managing agent
MINOTAUR MANAGEMENT LLC
Public records list MINOTAUR MANAGEMENT LLC as the registered managing agent for this address as of 1 Sept 2025. Source: HPD registration.
Owner of record
316 SUYDAM LLC
Public records list 316 SUYDAM LLC as the owner of record for this address as of 1 Sept 2025. Source: HPD registration.
Wrong company, wrong date, or a change that is not reflected here? Report a correction.
What to ask at the viewing
316 Suydam Street, Brooklyn, NY 11237
Drawn from this building’s record above. They are questions, not conclusions: the point is to find out, in the twenty minutes you get inside, what the public record cannot tell you.
- The city currently has 4 open immediately-hazardous violations on this building. Ask which apartments they concern, how many are in the one you would be renting, and when HPD re-inspects.
- HPD has 1 case pending against the owner in Housing Court (tenant action/harassment). Ask what it is about and whether the work has been done.
- The city recorded 2 mould violations here, most recently in 2020, all since closed. Closed means the city stopped checking, not that the damp is gone. Ask to look behind furniture and under sinks, and ask what was done the last time; a repaint is not a repair.
- The owner has filed a bedbug report for this building (most recently for the year ending 2026). Ask when the building was last treated, how often an exterminator comes, and whether treatment covers the whole line of apartments or only the one that complained.
- Ask what the deposit is, exactly what can be deducted from it, and how and when it comes back.
- Ask who to call when something breaks, what happens after hours and at weekends, and how long a repair normally takes.
Ask for anything that matters in writing; an email after the viewing is enough. We are not your lawyer and this is not legal advice.
Questions about this building
Yes. HPD lists 10 open housing violations: 4 immediately hazardous, 6 hazardous and 0 non-hazardous. Paperwork filings, such as a late registration, are not counted.
Since 2022, HPD inspectors have written the most violations here for fire and safety equipment (14), doors and windows (13) and leaks and plumbing (6).
On 9 Sept 2026. HPD only publishes inspections that found something, so a later visit that found nothing would not show here.
The owner registered at least one rent-stabilized apartment here with the state for 2024. The list does not say which apartments. A tenant can ask the state for an apartment's rent history to be sure.
In the 2025–26 heat season the city received heat or hot-water complaints on 1 day, and HPD issued 1 heat violation.
No residential evictions by a city marshal are recorded here since 2017.
Not yet. Reviews come from people who lived here, and none has been published for this building.
BBL 3032200028 · Block 3220, Lot 28 · Building class C2
